[CALL TO ORDER]

[00:00:29]

2021 WATER IN WASTEWATER COMMISSION, REGULAR MEETINGS.

[A. APPROVAL OF MINUTES]

MOTION MADE BY VICE CHAIR, PERRY FOR APPROVAL.

IS THERE A SECOND, SECOND MADE BY COMMISSIONER? ALL IN FAVOR, PLEASE RAISE YOUR HAND, SHOWING ALL PRESENT, UH, CONSENT TO IT.

THANK YOU.

NOW

[B. ITEMS FOR COMMISSION’S REVIEW AND RECOMMENDATION FOR APPROVAL TO CITY COUNCIL]

LET'S MOVE TO ITEM B AND WE WANT TO GO AROUND THE TABLE AND ESKER COMMISSIONER.

YOU'VE GOT ANY QUESTIONS OR RECUSE SAUCE.

AND IF WE GOT RECUSED, THOSE PLEASE STATE THE REASON THAT YOU'RE RECUSING YOUNG.

IT, WE START WITH COMMISSIONER MORIARTY, COMMISSIONER PAIN QUESTIONS, NO RECUSALS COMMISSIONER, MICHELLE QUESTIONS, RECUSAL AND ITEM B SEVEN.

MY ENGINEERING FIRM IS WORKING FOR THE DEVELOPER.

THANK YOU.

AND I DON'T HAVE ANY QUESTION OR THE QSO VICE CHAIR.

CASTLEBERRY.

NO QUESTIONS.

THANK YOU, COMMISSIONER UP.

NO QUESTIONS.

NO RECUSALS.

THANK YOU.

COMMISSIONER WILLIAMS, NO QUESTIONS.

NO RECUSAL.

COMMISSIONER FISHER, NO QUESTIONS.

NO RECUSALS.

OKAY.

SORTA CONSENT ITEMS ARE ITEM B 1, 2, 3, 4 5 6, 8, 9, 10, AND 11.

AM I CORRECT? IS THERE A MOTION MOTION MADE BY COMMISSIONER MORIARTY AND SECOND BY A COMMITTEE? VICE CHAIR, CASTLEBERRY.

ALL IN FAVOR, PLEASE RAISE YOUR HAND SHOWING APPROVAL AN MSD.

THANK YOU.

[B.7. Recommend approval of a resolution authorizing the issuance by Pilot Knob Municipal Utility District No. 3 of $11,390,000 Unlimited Tax Bonds, Series 2021.]

NOW LET'S MOVE TO ITEM B SEVEN.

WE COMMEND APPROVAL TO NEGOTIATE AN EXECUTE, AN ADVANCED NO, WHAT? I'M SORRY.

NUMBER SEVEN.

WE COMMAND APPROVAL OF A RESOLUTION AUTHORIZING THE ISSUE OF PARADOX NAP.

MONISH PAUL, YOU DID DISTRICT NUMBER THREE OF $90,000 UNLIMITED TEXT PONG.

SHE READS 2021 AND COMMISSIONER MICHELLE IS RECUSING ON IT.

IS THERE ANY DISCUSSION OR ANY MOTION MOTION MADE BY, UH, VICE CHAIR? CASTLEBERRY IS THIS SECOND SECOND MADE BY COMMISSIONER WILLIAMS. ALL IN FAVOR, PLEASE RAISE YOUR HANDS SHOW IN PAYNE.

MONIA T CASTLEBERRY.

UH, UM, WE SURE.

MAX GROPE AND WILLIAMS AND, UH, COMMISSIONER MICHELLE ABSTAIN.

ELOCUTION.

I'M SORRY, ACCUSING.

THANK YOU VERY MUCH.

OKAY, LET'S MOVE ON.

LET'S JUMP TO THE AGENDA.

I DID OPIATES.

UH, LET'S MOVE

[D.2. Capital Contracting Outreach Briefing]

TO ITEM T TO CAPITAL CONTRACTING OUTREACH BRIEFING.

GOOD EVENING COMMISSIONERS SHANE RAWLS, ROLSON ASSISTANT DIRECTOR OR ENGINEERING SERVICES.

UH, AND TONIGHT WE HAVE, UH, UH, DIRECTOR OF CAPITAL CONTRACTING OFFICE, ROLANDO FERNANDEZ HERE TO GIVE US A BRIEFING ON OUTREACH EFFORTS.

GOT IT.

ALL RIGHT.

GOOD EVENING.

I'M ROLANDA FERNANDEZ WITH THE CAPITAL CONTRACTING OFFICE.

THANK YOU, SHEA FOR INVITING ME HERE.

UH, MR. UH, DIRECTOR, GREG IS NOT HERE WITH US, BUT ALSO FOR THE INVITATION TO COME HERE AND TALK TO YOU ABOUT OUR PROCESS FOR A CAPITAL CONTRACT IN OFFICE.

RIGHT? SO WHAT DOES CAPITAL CONTRACT IN OFFICE BEFORE I GO ON MY PRESENTATION, ULTIMATELY THE OFFICE RESPONSIBLE FOR PROCUREMENT OF ALL CIP CAPITAL PERMIT PROJECTS RELATED CONTRACTS.

SO, UH, PROFESSIONAL SERVICES SUCH AS ENGINEERS, ARCHITECTS,

[00:05:01]

AND THEN CONSTRUCTION.

SO A LITTLE BIT ABOUT WHAT WE DO IN THE PRIOR POINT AND THEN REALLY FOCUS ON AN AREA OF CONCERN THAT THIS COMMISSION HAS HAD REGARDING ONE BIDDER SOLICITATIONS.

SO IT HAS SOME DATA TO SHARE WITH YOU AND THEN, UM, REALLY PROVIDE SOME CONTEXT ON OUR OUTREACH EFFORTS THAT WE'VE BEEN DOING OVER THE LAST FEW YEARS, QUITE HONESTLY, AND THEN SOME IDEAS OF WHAT WE HAVE COMING UP, UH, MOVING FORWARD AND REALLY, UH, HAPPY TO ANSWER ANY QUESTIONS THAT Y'ALL MAY HAVE DURING THE POWERPOINT, OR WE CAN WAIT TOWARDS THE END OF THE POWERPOINT WHEN WE HAVE A SLIDE THAT SAYS QUESTIONS.

SO I'M HERE AT YOUR SERVICE AND I'M HAPPY TO ADDRESS ANY CONCERNS THAT Y'ALL MAY HAVE.

OKAY.

SO I'LL START WITH SLIDE NUMBER ONE AND, UH, Y'ALL HAVE COPIES.

GREAT.

I KNOW IT'S HARD FOR ME TO SEE THE SCREEN SINCE I'M GOING TO BE LOOKING HERE JUST TO STAY ON POINT AND, UH, WE'LL GO FROM THERE.

SO WHAT ARE WE GOING TO TALK ABOUT? WE'RE GOING TO TALK A LITTLE BIT ABOUT OUR VISION, OUR MISSION AND GOALS, UH, HOW WE CONDUCT AND WHAT WE DO FOR A INVITATION FOR BID PROCUREMENTS, WHICH IS WHAT OTHER PEOPLE CALL IT.

SOME PEOPLE CALL IT COMPETITIVE BIDDING.

WE'LL LOOK AT SOME COMPARISON DATA REGARDING PRE-BID THE INFORMATION MEETINGS THAT WE HAVE FOR FOLKS TO COME IN AND LEARN ABOUT THE PROJECTS AND THEN THE RESULTS OF OUR BID PROCESS.

WE'LL ALSO FOCUS A LITTLE BIT ABOUT, UM, WHAT WE DO WHEN WE SEE LOW ATTENDANCE AT, UH, PREVIOUS MEETINGS AND BIDS, THE MIDDLE, UM, SOME INFORMATION ON OUR OUTREACH EFFORTS THAT WE'VE BEEN DOING OVER THE LAST FEW YEARS.

UM, THINGS THAT WE'VE BEEN CONSIDERING DOING MOVING FORWARD.

AND THEN AGAIN, ANSWERING THE QUESTIONS, UH, FOR YOU ALL.

SO A LITTLE BIT ABOUT OUR VISION AND MISSION.

UM, OUR RESPONSIBILITY IS TO BE A VALUABLE BUSINESS PARTNER FOR DEPARTMENTS LIKE AUSTIN, WATER, AVIATION, AUSTIN, ENERGY WATERSHED PROTECTION.

SO EVERY DEPARTMENT WITHIN THE CITY OF AUSTIN THAT HAS A COUPLE OF PERMIT PROGRAM WORKS THROUGH US TO PROCURE THE CONTRACTS NEEDED FOR THEIR DEPARTMENT FOR THEIR SERVICES.

AND SO I KIND OF SEE THIS AS A THREE RING CIRCUS, RIGHT? IT'S US CCO.

THERE IS A DEPARTMENT OF AUSTIN WATER AND THIS EXAMPLE, AND THEN THERE'S PUBLIC WORKS, WHO PROVIDES A LOT OF THE PROJECT MANAGERS THAT OVERSEE THOSE PROJECTS AND THAT'S THE CITY SIDE.

AND THEN THERE'S THE OFFSIDE SIDE, RIGHT? WHICH IS THE CONSULTANTS AND THE CONTRACTORS THAT ARE VALUABLE THAT WE NEED TO HELP DELIVER OUR CIP PROJECTS.

WE CAN'T DO THIS ON OUR OWN.

AND SO WHEN I THINK ABOUT, WHEN I TALK ABOUT THE STUFF THAT WE DO, RECOGNIZING THAT WE COULDN'T BE SUCCESSFUL WITHOUT OUR PARTNERS AND THE ENGINEERING COMMUNITY ORCHESTRA COMMUNITY AND THE CONSTRUCTION COMMUNITY.

SO THOSE ARE VERY IMPORTANT FOR US AND WE BUILD OUR PROGRAM AND THE WAY THAT WE WANT TO HEAR THEIR FEEDBACK AND COMMUNICATE THEM IN A WAY THAT MAKES SENSE FOR THEM TO COME IN AND, AND, AND SUBMIT RESPONSES OR BIDS THROUGH OUR PROJECTS.

SO THAT HAVE A BUSINESS PARTNER TO OUR PARTNERS IN CIP, BUT ALSO IN THE EXTERNAL FOLKS THAT WE WORK WITH ON A DAILY BASIS, OUR MISSION IS TO PROCURE AND MANAGE CONTRACTS, SUPPORTING CAPITAL AND PREMIERE PROJECTS, UH, THAT IMPROVE THE QUALITY OF LIFE.

SO OUR COMMUNITY, OBVIOUSLY THEY PLAY, THEY TOUCH, THEY SEE, UH, ALL OF THE INFRASTRUCTURE THAT FOLKS, UM, IN THE CITY PROVIDE FOR THEM IN THIS CASE, UH, WATER WATERWAY SERVICES, A COUPLE MORE GOALS.

UM, WE FOCUS A LOT ON ENSURING TIMELY SERVICES OF OUR CONTRACTS.

UM, FOR ME AS A PERSON THAT RESPONSIBLE FOR THE OVERALL DELIVERY OF OUR SERVICES, YOU KNOW, REALLY EMPHASIZED TO MY TEAM MEMBERS IN MY OFFICE THAT, YOU KNOW, WE WERE REALLY FOCUSED ON QUALITY AND ON TIME DELIVERY, RIGHT.

WE HAVE A LOT OF WORK GOING ON AND WE WANT TO GET THOSE CONTRACTS OUT IN A TIMELY MANNER, UH, AND A HIGH LEVEL OF QUALITY OF SERVICE.

THE NEXT GOAL IS REALLY MORE INTERNAL FOR US.

AND IT'S BASICALLY TALKING ABOUT CREATING AN ENVIRONMENT WHERE MY TEAM MEMBERS, UH, THEY FEEL CONNECTED WITH ONE ANOTHER.

THEY FELT EMPOWERED AND THEY'RE COMMITTED TO EXCELLENCE.

I AM A FIRM BELIEVER THAT WHEN PEOPLE ARE HAPPY DOING WHAT THEY DO, THEY DO BETTER WORK AT IT.

AND SO MY RESPONSIBILITY AS A DIRECTOR IS TO ENSURE THAT THEY COME FROM AN ENVIRONMENT OR WORK IN AN ENVIRONMENT IN THIS CASE, THERE'S A LOT OF FOLKS ARE STILL WORKING FROM HOME WHERE THEY FEEL CONNECTED AND EMPOWERED, UH, VALUED, TRUSTED, UM, AND THAT WAY THEY CAN DELIVER THE BEST SERVICES FOR US.

ONE OF OUR GOAL HAS BEEN EVEN, OR NOT IS TO PROMOTE COMPETITION IN RCIP CONTRACTS.

SO Y'ALL RAISED A REALLY GOOD POINT PREVIOUSLY WHEN Y'ALL HAD ITEMS COME TO YOU FOR CONSIDERATION TO APPROVE THE RECOMMENDED MARION COUNCIL, WHERE YOU ONLY SAW ONE BIDDER, IT'S BEEN OUR PRIORITY FOR, FOR A LONG TIME NOW TO REALLY ENSURE THAT WE HAVE COMPETITION IN OUR CONTRACTS.

WE BELIEVE THAT WHEN THERE'S COMPETITION, WE GET BETTER SERVICE FOR IT, RIGHT? WE GET BETTER VALUE IN TERMS OF PRICING.

WE GET BETTER VALUE IN TERMS OF THE QUALITY OF THE COMPETITION.

AND SO WE WANT TO MAKE SURE THAT FOLKS KNOW THAT THE CITY IS OPEN, RIGHT? AND WE WANT THEM TO COME IN AND SUBMIT RESPONSES OR BIDS THROUGH OUR PROJECTS.

AND, AND I'LL TALK TO SOME ABOUT HOW WE DO THAT.

UM, SO IT'S BEEN A GOAL OF OURS AND I'LL JUST TALK ABOUT WHAT WE'VE DONE AND WHAT WE'RE CONTINUING TO DO IN THAT AREA OF RESPONSIBILITY.

AND THEN SOMETHING

[00:10:01]

THAT A LOT OF FOLKS ARE NOT FAMILIAR WITH.

AND THIS IS REALLY DROVE FROM A COUNCIL RESOLUTION WHERE COUNCIL WANTED US TO LEVERAGE OUR CONTRACTS, TO PROVIDE EMPLOYMENT OPPORTUNITIES FOR OUR COMMUNITY.

SO IN OUR CONTRACTS IN AUSTIN WATER CONTRACTS, DEPENDING ON THE DOLLAR VALUE, WE ACTUALLY SAID, UM, REQUIREMENTS FOR THE CONTRACTOR THAT GETS THE CONTRACT TO BRING ON BOARD APPRENTICESHIP OPPORTUNITIES OR, UH, ON THE JOB TRAINEES.

AND WE WORK WITH, UM, THE LOCAL UNION, UH, NETWORK.

WE ALSO WORK WITH, UM, WORKFORCE DEVELOPMENT ORGANIZATIONS, THE NONPROFIT SIDE TO CONNECT THE FOLKS THAT THEY SERVE, RIGHT.

AND PROVIDE THEM OPPORTUNITIES TO COME IN AND WORK AND HOPEFULLY GAIN A REALLY GOOD JOB, RIGHT.

AND IN OUR, WITHIN OUR CONTRACT.

SO THAT'S ONE OF OUR GOALS HERE AS WELL, BUT REALLY WANT TO FOCUS ON THE ONE THAT, UM, IS KEY TO THIS CONVERSATION, THE COMPETITION FOR CIP CONTRACTS.

SO TALK A LITTLE BIT ABOUT OUR VISION MISSION AND OUR GOALS, AND NOT WHEN I PROVIDE YOU SOME, UH, SOME DATA THAT YOU'RE GOING TO FIND ON SLIDE NUMBER SIX.

SO SINCE AUGUST OF 2019 TO CURRENT, UH, WE VISITED 30 SOLICITATIONS FOR THE AUSTIN WATER DEPARTMENT, RIGHT? SO THAT'S, YOU KNOW, OBVIOUSLY AUSTIN WATER AND WATERWAY SERVICES.

IT'S THE DEPARTMENT OF AUSTIN WATER, REGARDLESS OF THE TYPE OF SCOPE OF WORK OVERALL 30 CONTRACTS THAT WE'VE ISSUED SINCE AUGUST OF 2019, THE AVERAGE AMOUNT OF NUMBER OF BIDS THAT WE RECEIVED PERSONALIZATION IS 4.3.

AND, UH, GOING BACK AND LOOKING AT THAT DATA, WE'VE HAD FIVE SOLICITATIONS, OH, SORRY.

I THOUGHT I PUSHED IT.

THANK YOU.

WE'VE HAD FIVE SOLICITATIONS TO WERE, UH, INDEFINITE DELIVERY, INDEFINITE QUANTITY, UH, WHICH ARE STILL COMPETITIVE BIDDING.

WE'RE LOOKING AT THE LOWEST BID, BUT WE SAT, UH, QUANTITIES THERE TO, UH, DEVELOP THE PRICE.

AND THEN WE'VE DONE THREE SMALL STANDALONE PROJECTS.

SO 30 SOLICITATIONS OF THOSE FIVE WHERE WE SAW ONE BIDDER RESPOND TO THIS, TO THIS STATION.

SO A LITTLE BIT MORE INFORMATION ABOUT THOSE FIVE CONTRACTS.

YOU'LL SEE ON SLIDE NUMBER SEVEN, UH, THE PROJECT ON THE SECOND COLUMN, YOU'RE GOING TO SEE THE PRIME FIRMS THAT ATTENDED THE PRE-BID MEETING.

SO LET ME TALK A LITTLE BIT ABOUT WHAT THAT MEANS.

SO WHEN WE ISSUE A SOLICITATION ABOUT A WEEK AFTER WE HOLD WHAT WE CALL A PRE-BID MEETING, WE USED TO DO THEM IN PERSON.

WE DO THESE, THESE NOW VIRTUALLY BECAUSE OF COVID SITUATION, WHERE WE INVITE FOLKS THAT ARE INTERESTED, UH, TO LEARN MORE ABOUT THEIR PROJECT TO COME IN, UH, LEARNING FROM THE PM, THE CONSULTANT, MY STAFF, UH, SMB ARE, OR AT THIS MOMENT NOTED BUSINESS RESOURCE DEPARTMENT THAT SETS THE GOALS FOR THESE PROJECTS ABOUT INFORMATION ON THAT SOLICITATION.

SO THAT THEY'RE REALLY INFORMED ABOUT, YOU KNOW, DOES THAT PROJECT MAKE SENSE TO THEM? DO THEY HAVE ALL THE INFORMATION THAT THEY NEED TO HAVE? DO THEY UNDERSTAND THE PROCESS TO ENSURE THAT THEY'RE SUBMITTING A COMPETITIVE BID FOR THIS PROJECT? UM, AND SO VERY IMPORTANT MEETING THAT WE, AGAIN, INVITE FOLKS TO COME IN AND MAKE IT AS EASY AS POSSIBLE FOR THEM TO COME IN SO THAT THEY CAN LEARN MORE ABOUT THE PROJECT.

AND WE USE THAT AS SORT OF OUR WIND INDICATOR TO SHOW HOW MUCH INTEREST THERE IS IN THE PROJECT.

AND BEFORE I THINK THE LAST FEW YEARS IT WORKED AS AN INDICATOR, UM, I THINK OVER THE LAST COUPLE OF YEARS, WE'VE SEEN THAT THERE'S JUST A LOT OF WORK RIGHT NOW.

AND PEOPLE ARE REALLY BUSY THAT PEOPLE CAN GET THE SAME INFORMATION JUST BY READING THE DOCUMENTS AND THEN ASKING QUESTIONS TO MY STAFF, UH, AS THE AUTHORIZED CONTACT PERSON AND MAYBE NOT HAVE TO MAKE THAT MEETING.

RIGHT.

AND SO WE'VE BEEN SEEING A LITTLE BIT TURNER, A LITTLE BIT LESS, UH, SHOW UP.

AND WHEN WE TALK TO FOLKS ABOUT THAT, IT'S JUST BECAUSE THERE ARE CAPACITY, RIGHT.

IF I'M GOING TO SEND SOMEBODY TO THAT MEETING IT, IT MIGHT, IT MIGHT NOT BE THE BEST PERSON TO SEND SOME WHITE SENSE, SOMEBODY AT ALL THIS KIND OF, UM, WHAT WE'RE HEARING, RIGHT.

UNLESS YOU'RE REALLY TALKING ABOUT A COMPANY THAT'S SOLELY FOCUSED ON THAT SCOPE OF WORK.

LIKE THAT'S ALL THEY DO IS THAT SCOPE OF WORK.

AND SO BILL POLY SEMEN THAT IN THAT MEETING, BUT, UM, WE'RE, WE'RE KIND OF JUST SEEING, YOU KNOW, BECAUSE OF THE LEVEL OF WORK THAT'S GOING ON, NOT ONLY IN CENTRAL TEXAS, BUT ACROSS THE STATE, BECAUSE THE COUNTRY IT'S JUST, WE'RE SEEING AND THEN TALKING TO MY PEERS AND OTHER MUNICIPALITIES, IT'S KIND OF THE SAME THING THAT THEY'RE SEEING.

IT'S JUST, THERE'S SO MUCH GOING ON THAT, UM, YOU KNOW, FOLKS REALLY CAN PICK AND CHOOSE WHAT THEY WANT TO, YOU KNOW, GO AND PURSUE.

SO YOU SAW, YOU SEE THE ESTIMATE OF THE DOLLAR AMOUNT.

AND THEN, UM, ONE OF THE PROJECT PROCESSES THAT WE HAVE CURRENTLY IS WHEN WE GET LIMITED RESPONSES, UM, MY STAFF WORKING WITH THE PROJECT MANAGER WILL REACH OUT TO THE CONTRACTORS THAT ATTENDED THE PRE-BID MEETING OR HAD SHOWN SOME INTEREST, UH, HA YOU KNOW, RAISED THE QUESTION ABOUT THE PROJECT, THAT'S THE STATION TO FIGURE OUT, OKAY.

IT SEEMED LIKE YOU HAD SOME INTEREST, BUT, YOU KNOW, YOU DIDN'T PURSUE BY THE PROJECT BY SOME, IN THE BID.

WHY WAS THAT RIGHT? AND SO YOU'LL SEE IT IN A BRIEF SUMMARY, WHAT THE RESPONSE WAS THAT WE RECEIVED SMALL PROJECT IT'S SMALL SCOPE GOT TOO MUCH GOING ON, AND I REALLY CAN DEDICATE THE STAFF THAT I CAN THAT NEEDED TO DEDICATE FOR THIS PROJECT, OR, YOU KNOW, THE, THE, THE, THE VALUE ISN'T THERE, RIGHT? THE PROFIT ISN'T FOR ME.

AND THIS ONE, UM, THE ID IQ FOR FACILITIES, EMERGENCY LIFT, UH, EMERGENCY LIFT STATION ID IQ, UH, THE RESPONSE AREAS IS THAT

[00:15:01]

KIND OF ON-CALL TYPE OF SERVICE, RIGHT? THE EMERGENCY RESPONSE REQUIREMENT, BUT WAS IT SOMETHING THAT, THAT CONTRACTOR REALLY FELT LIKE THEY WANTED TO PURSUE? UM, AND THEN SPECIALIZED SCOPE OF WORK, THE WORK THAT AUSTIN WATER DOES.

UM, AND, AND THESE FACILITIES, THE TRUE FACILITIES, LARGE FACILITIES, IT'S COMPLICATED WORK, UM, CONFINED SPACES, TECHNICAL WORK.

AND SO CERTAINLY THAT, UH, CAN LIMIT, YOU KNOW, UH, CONTRACTORS WHO MAYBE ARE NOT READY YET IN TERMS OF EXPERIENCE TO PROCEED, UM, AND PROVIDING THE RESPONSE RIGHT TO THAT, TO THAT BID.

SO THAT'S THE STATION, EXCUSE ME.

SO IT'S THE MORE DATA ON SLIDE NUMBER EIGHT.

SO THIS IS JUST KIND OF TAKING THE BIGGER PICTURE, YOU KNOW, KIND OF STEPPING UP A LITTLE BIT HIGHER AND ALTITUDE, AND NOW WE'RE LOOKING AT NOT JUST, UH, AUSTIN WATER BASE, SO THE STATIONS, BUT ALL OF CCO IFB PROCUREMENTS, RIGHT? SO AGAIN, I TALKED ABOUT, WE DO THIS FOR AUSTIN WATER, AUSTIN, ENERGY PARKS, AND RECREATION, AND WATERSHED PROTECTION, TRANSPORTATION, AVIATION.

AND SO WHEN YOU LOOK AT, UM, THE FIRST CO UH, YOU KNOW, TABLE, THEY'RE ALL CCO, IB PROCUREMENTS, THE AVERAGE NUMBER OF PRIME BITTERS ATTENDING PRE-BID MEETINGS IS FOUR.

AND THE AVERAGE NUMBER OF BIDS RECEIVED IS 4.1 AND COMPARISON.

NOW FOCUS SOLELY FOCUSING SOLELY ON AUSTIN, WATER, IB PROCUREMENTS, UH, WE'RE LOOKING AT, UH, THREE ATTENDING THE PRE-BID MEETINGS.

AND THEN THE AVERAGE BID RECEIVED THIS 4.3.

SO WE'RE SEEING LESS ATTENDANCE AT THE PRE-BID MEETINGS AND THEN SLIGHTLY HIGHER, YOU KNOW, POINT TO, UH, RESPONSES OF, UH, IN, IN RE TO THE SOLICITATION.

AND THAT'S A SUMMARY STATEMENT THAT WE HAVE HERE.

UM, AND MY, MY NEXT SLIDE I'LL CARRY ON THE FEEDBACK THAT WE'VE BEEN RECEIVING A PHONE CONTRACTOR IS ABOUT WHY ARE WE SEEING THAT? I MENTIONED SOME OF THAT ALREADY, BUT, UM, THIS ONE REALLY HITS IT HOME AGAIN, THIS IS NOT ME MAKING STUFF UP AND KIND OF JUST GUESSING AT IT.

IT'S REALLY WHAT WE'RE HEARING FROM THE CONTRACTORS THAT HAVE DONE WORK FOR US BEFORE.

AND WE HOPE THAT THEY DO WORK FOR US IN THE FUTURE, AND THERE'S A RELATIONSHIP THERE, AND, YOU KNOW, THE FEEDBACK THAT I GET FROM THEM, YOU KNOW, CERTAINLY LISTEN TO IT AND, AND, UH, YOU KNOW, WANT TO DO SOMETHING RIGHT TO ENSURE THAT THEY ARE, YOU KNOW, FUTURE IN A BETTER POSITION TO RESPOND THROUGH OUR SOLICITATIONS.

UH, IN SUMMARY HERE, IN MOST CASES, WE, ONE DAY WOULD RECEIVE THE NUMBER OF BITTERS, UH, PRIME BITTERS ATTENDING.

THE PRE-BID MEETING WAS RELATIVELY LOW FOR AUSTIN WATER, UM, CONTRACTORS FEEDBACK FOR A SINGLE BID IT'S ON AUSTIN PROJECTS OVER THE PAST TWO YEARS, AGAIN, BETTER HAS REALLY LIMITED CAPACITY, UH, TO TAKE ON THE ADDITIONAL WORK.

UM, AND, AND THAT'S IMPORTANT, RIGHT? AND WHY IS THAT IMPORTANT? YOU KNOW, THIS IS A REPUTATION, YOU KNOW, THAT A BAD PERFORMANCE IN THEIR PROJECT, YOU KNOW, STAYS WITH THEM FOR QUITE A WHILE.

YOU KNOW, IT'S NOT SOMETHING THAT YOU CAN HIDE AND NOT SHOW ON YOUR RESUME.

IT'S SOMETHING THAT WE CAN LOOK AT AND SEE.

UM, AND, YOU KNOW, WE KEEP RECORD OF PERFORMANCE.

UM, THE STATE HAS RECORD OF A PERFORMANCE, OTHER ORGANIZATIONS KEEP RECORD OF, OF PERFORMANCE.

AND SO I THINK, AND TALKING TO THE CONTRACTORS, THEIR REPUTATION IS VERY IMPORTANT.

AND SO THEY, WHEN THEY PURSUE SOMETHING, IT'S BECAUSE THEY'RE GONNA HAVE THE BANDWIDTH, THE EXPERTISE, THE CAPACITY, RIGHT.

TO DO THAT AND DO IT REALLY WELL.

UM, AGAIN, LOW DO THE SMALL PROJECT SIZE, AND THEN THE SCOPES OF WORKS, UH, FOR WHICH A LOW NUMBER OF POTENTIAL BIDDERS WERE AVAILABLE THAT SPECIALIZE, UH, AREA OF RESPONSIBILITY THAT WE'RE LOOKING FOR, UM, REALLY IMPACTS US IN SOME CASES.

SO WHAT IS OUR PROCESS WHEN WE SEE, UH, LOW ATTENDANCE AT PRE-BID MEETINGS, YOU KNOW, OUR CURRENT PRACTICE HAS BEEN THAT WE LOOK AT THAT, UM, WE LOOK AT, YOU KNOW, HOW CAN WE LEARN FROM THAT? UM, MOVING FORWARD, YOU KNOW, ONE OF THE THINGS MAY BE THAT WE HAVE MULTIPLE PROJECTS THAT ARE THE SAME KIND OF SCOPE OF WORK THAT AUSTIN WATER WANTS US TO PROCURE AT THE SAME TIME.

AND IS IT, THAT, IS THAT THE RIGHT THING TO DO? YOU KNOW, CAN WE SPACE THEM OUT? IS THERE A CAPACITY IS BASED UPON, YOU KNOW, A LOT OF THIS IS REALLY DEPENDING ON, YOU KNOW, AUSTIN WATER MOVING ALONG THROUGH THEIR BO THEIR, THEIR CIP PROGRAM IN A TIMELY MANNER WHERE THEY'RE MAINTAINING OR UPDATING THEIR INFRASTRUCTURE SO THAT IT DOESN'T BREAK, OR IT DOESN'T IMPACT THE SERVICE DELIVERY THAT THEY HAVE.

AND THEN, YOU KNOW, SO WE PUT THINGS ASIDE JUST TO TRY TO SEE IF WE CAN GET BETTER COMPETITION.

DOES THAT MAKE SENSE? RIGHT? UH, OR WE, WE GOTTA MOVE ON IT NOW BECAUSE IF NOT, AS SLOWS DOWN THE OVERALL PROGRAM.

AND SO THOSE ARE THE THINGS THAT WE CONSIDER IN THE FUTURE IS TO SAY, LET'S DELAY THAT A LITTLE BIT.

THESE ARE THE SAME KINDS OF CONTRACTS.

ONE IS HERE IN A SOB.

ONE IS IN THE NORTH, AND WE KNOW THAT IF WE'D LET THEM OUT AT THE SAME TIME, IT'S GONNA BE HARD TO GET RESPONSES OR GIVE RESPONSES FOR BOTH OF THOSE.

SO THINGS LIKE THAT ARE, THINGS ARE THINGS THAT WE CAN KEEP IN MIND AND WORK WITH AUSTIN WATER TO ENSURE THAT, AGAIN, WE'RE NOT SETTING OURSELVES UP FOR FAILURE, UM, AND REDUCING THE RESPONSES BECAUSE OF HOW WE'RE APPROACHING THE DELIVERY OF THESE PROJECTS.

UM, SO THAT'S, AGAIN, LISTENING TO THEIR FEEDBACK AND THEN TRYING TO USE THAT IN FUTURE CONSIDERATION.

WE'RE ALSO TRANSPARENT ABOUT THAT IN OUR REQUEST FOR COUNCIL ACTION, THE EXACT SAME THING THAT Y'ALL LOOK AT WHEN WE'RE RECOMMENDING CONTRACTS AND AWARD IS WHAT GOES TO MARIN COUNCIL.

AND IN THE BELOW THE LINE, WE PUT INFORMATION OUT THERE ABOUT, HEY, LOOK, WE ONLY GOT ONE BIDDER, BUT HERE'S WHY WE ONLY GOT ONE BITTER.

AND IT WAS IMPORTANT FOR US TO MOVE FORWARD WITH THIS PROJECT, BECAUSE NUMBER ONE, THAT BITTER

[00:20:01]

WAS RESPONSIVE AND RESPONSIBLE.

THEY HAD THE NECESSARY EXPERIENCE.

THE PRICING WAS IN LINE WITH OUR ENGINEER'S ESTIMATE, AND WE FEEL GOOD ABOUT, YOU KNOW, EVERYTHING THERE THAT WE WANT TO MOVE FORWARD WITH THIS CONTRACT AWARD.

UM, A QUESTION THAT Y'ALL MAY PERHAPS BE PONDERING IS, YOU KNOW, DO WE EVER DECIDE JUST TO REBID IT, IF WE GET LOW PARTICIPATION IN THE BID PROCESS, IF WE ONLY GET ONE BETTER, DOES IT MAKE SENSE TO JUST GO AHEAD AND SCRATCH THAT AND REDO IT ALL OVER AGAIN? UM, AND THAT'S NOT AN OPTION THAT I LIKE TO TAKE, UH, IN MY EXPERIENCE WHEN WE'VE HAD TO REBID FOR THINGS OUTSIDE OF MAYBE JUST ONE BIDDER, UM, THE BID PROCESS HASN'T RESULTED IN MORE COMPETITION OR IN BETTER PRICING.

SO WHEN WE OPENED UP THE BID, THAT BID IS READ OUT LOUD, PUBLICLY, IT'S A STATE REQUIREMENT.

AND SO BITTERS THEN BECOME AWARE OF MY PRICE, YOUR PRICE, YOUR PRICE, YOUR PRICE, AND THEN, YOU KNOW, THAT'S ALL PUBLIC, IT'S A, IT'S A PUBLIC RECORD NOW.

AND THEN IF THAT ONE LONE BIDDER HAS EXPERIENCE, THEY MET ALL THE REQUIREMENTS THAT ARE NOTED IN THIS LIMITATION, RIGHT THERE PRICES WITHIN THE ESTIMATE, IF WE DON'T KNOW WHERE THAT CONTRACT TO THEM, RIGHT.

WHICH IS PRETTY STRONG IN STATE STATUTE, THEY HAVE EVERYBODY TO COME PURSUE US AND, AND MAKE THEIR ARGUMENT ABOUT WHY WE DIDN'T AWARD THAT CONTRACT TO THEM.

UM, SO I, IF IT MEETS OUR REQUIREMENTS, RIGHT, WE SHOULD BE MOVING FORWARD.

EVEN IF WE FEEL LIKE THERE WASN'T MORE COMPETITION AND WE CAN JUSTIFY WHY WE DON'T FEEL LIKE THERE WAS ENOUGH COMPETITION IN MY EXPERIENCE.

AGAIN, IT DOESN'T SEEM LIKE IF WE WAIT EVERY BIT AT LATER ON, WE'RE PROBABLY GOING TO PAY MORE AND WE'RE PROBABLY NOT GONNA SEE AS MUCH, UM, RESPONSES THAT WE SAW EARLIER ON.

UM, I'VE HAD A CONVERSATION WITH A CONTRACTOR, UH, AND THEIR RESPONSE WAS, WELL, I DON'T HAVE ANY CAPACITY, UH, RIGHT NOW, BUT IF I WAIT, YOU KNOW, BUT IF YOU REBID IT LATER ON, I MAY BE ABLE TO, AND THERE'S NOT A HARD COMMITMENT.

THERE IS NOT A HARD COMMITMENT THAT THEY'RE GONNA BE ABLE TO, YOU KNOW, TO REBID IT.

BECAUSE AGAIN, THERE'S NO GUARANTEE THAT THEY'RE GONNA GET THE CONTRACT.

IT'S, IT'S BASED ON LOW BID.

RIGHT.

AND THAT'S FOLLOWING THE STATE STATUTE.

AND SO, UM, AGAIN, IN OUR EXPERIENCE THAT LOW BITTER MEETS ALL THE REQUIREMENTS THERE ESTIMATES WITHIN THE ENGINE, THEIR BID IS WITHIN THE ENGINEER'S ESTIMATE.

WE'RE GOING, GONNA MOVE FORWARD WITH THAT, UM, WITH THAT, UH, BID.

UM, AND IF WE DECIDE TO DO SOMETHING, UH, LIKE A REBID, THEN THERE NEEDS TO BE SOMETHING THAT CHANGES IN THE DESIGN DOCUMENTS IN OUR, IN OUR SPECS.

WHY ARE WE CHANGING IT? UM, IS THE QUESTION THAT WE HAVE TO ASK OURSELVES, IS THERE A REASON THAT RESULTED IN LESS SUBMITTALS OR THE PRICE BEING TOO HIGH? AND IT'S BECAUSE MAYBE THE SCOPE WAS TOO BIG, MAYBE, UH, THERE WAS CONFUSION IN THE SPECS.

UM, MAYBE WE, WE ISSUED TOO MANY ADENDA AND SO THERE WAS A REVISION TO THE DRAWING, ANOTHER ONE, ANOTHER ONE, AND IT KINDA GOT CONVOLUTED.

AND, AND FOLKS MAYBE JUST DIDN'T UNDERSTAND ALL OF THE INS AND OUTS OF THIS PROJECT.

AND SO THE FEEDBACK THAT WE RECEIVED WAS LIKE, MAYBE IF WE REPACKAGE IT AGAIN, CHANGE A COUPLE OF THINGS.

MAYBE THE SCHEDULE MAYBE ALLOW FOR MORE TIME, UH, BECAUSE OF THE COMPLEXITY OF THE PROJECT AND WE'LL MEET, MAYBE WE'LL GET BETTER RESPONSES.

SO THOSE ARE THE THINGS THAT I LOOK FOR THAT THE PROJECT MANAGER OR THE SPONSOR DEPARTMENT WILL LOOK FOR IT TO SAY, IT MAKES A LOT OF SENSE TO REBID BECAUSE OF THESE THINGS.

AND IF WE MODIFY THESE THINGS THAT WE CHANGE, THESE THINGS PERHAPS WILL RESULT IN BETTER COMPETITION, BUT AGAIN, IT'S, IT MAY, IT MAY NOT.

AND SO THAT'S SOMETHING TO RELY ON, AND THAT'S WHY WE'RE NOT REALLY IN FAVOR OF JUST AUTOMATICALLY REBIDDING, EVEN IF WE GET ONE BIT.

RIGHT.

UM, IT'S JUST BECAUSE IF THEY MET EVERYTHING ELSE, THERE'S, YOU KNOW, IT MAY BE YOUR BEST OPTION.

MAYBE THERE'S NOTHING TO CHANGE IN THE SPECS.

AND THERE'S NOTHING THAT WILL CHANGE DIFFERENTLY IN THE NUMBER OF BITTERS, YOU KNOW, IF YOU REBID IT.

UM, SO I JUST WANTED TO POINT THAT OUT JUST BECAUSE I THOUGHT IT WAS A QUESTION THAT I RECEIVED AND, UM, FIGURED OUT SOME QUESTION THAT Y'ALL WERE THINKING ABOUT AS WELL.

I'VE BEEN TALKING A LOT.

SHOULD I PAUSE NOW AND MAYBE TAKE SOME QUESTIONS OR DO YOU ALL WANT ME TO FINISH THE SLIDES? UM, LIKE I'LL FINISH UP.

I GOT ABOUT 35 MORE SLIDES.

I'M JUST KIDDING.

IT'S JUST THE HANDFUL, A FEW MORE SLIDES AND THEN WE'LL END THERE.

SO, AS I MENTIONED EARLIER, ONE OF OUR GOALS IN OUR OFFICE WAS TO ENSURE THAT THERE'S COMPETITION FOR OUR PROJECT.

SO HOW DO WE, HOW DO WE DO THAT? UM, SO WE PROVIDE WHAT WE CALL OUR UPCOMING, UH, PROJECTS REPORT.

SO ON OUR WEBSITE, WE HAVE A SPREADSHEET THAT LISTS OUT EVERY SOLICITATION THAT WE HAVE COMING UP OVER THE NEXT YEAR.

AND IT HIGHLIGHTS WHETHER IT'S CONSTRUCTION OR PROFESSIONAL SERVICES OR ALTERNATIVE DELIVERY, LIKE A CONSTRUCTION MANAGER AT RISK OR DESIGN BUILD.

AND WE PUT IN THERE A LITTLE BIT ABOUT THE SCOPE OF WORK, THE DOLLAR AMOUNT THAT WE HAD SUSPECT THAT, YOU KNOW, BEING FOR THE MONTH THAT WE ANTICIPATE RELEASING THAT.

AND ALSO WE PROVIDE, UM, THE SPONSOR DEPARTMENT.

THIS IS AN AUSTIN WATER PROJECT.

THIS IS A PUBLIC WORKS PROJECT.

AND SO OUR HOPE IS THAT BY PROVIDING THIS INFORMATION AS EARLY

[00:25:01]

AS A YEAR, CONTRACTORS MAY SEE THAT AND SAY, THAT'S A PROJECT THAT I'M REALLY INTERESTED IN.

I FEEL LIKE I'LL BE REALLY COMPETITIVE FOR THAT PROJECT.

AND SO I'M GOING TO TRY TO SAVE MY RESOURCES TO BE ABLE TO COMPETE FOR THAT DOWN THE ROAD.

RIGHT.

AND IT'S SOMETHING THAT WE DID BASED ON FEEDBACK THAT WE RECEIVED DURING A SESSION FROM CONTRACTORS, HEY, CITY OF AUSTIN, CAN YOU DO THIS? OR CAN YOU DO US A FAVOR AND KIND OF LET OUT A LIST OF UPCOMING PROJECTS, RIGHT.

UM, AND, AND WE WORK EVERY MONTH TO UPDATE THAT AND ADVANCE IT ONE MONTH FURTHER IN THE FUTURE, UH, BY WORKING THROUGH OUR DEPARTMENT OR WITHOUT DEPARTMENTS TO ENSURE THAT WE HAVE INFORMATION IN THERE THAT IS AS ACCURATE AS POSSIBLE, AND AS CLEAR AS POSSIBLE FOR FOLKS CAN MAKE THAT KIND OF DECISION.

SO WE HAVE THAT.

AND THEN WE DO, YOU KNOW, WE ADVERTISE THAT USING OUR WEBSITE, OUR FACEBOOK PAGE, UH, SOCIAL MEDIA, AS MUCH AS POSSIBLE TO KIND OF GET THAT OUT THERE.

WE COMMUNICATE THAT WITH OUR ASSOCIATIONS.

UH, WE SEND IT OUT TO OUR MINORITY TRADE ASSOCIATIONS AS WELL.

SO PROFESSIONAL ASSOCIATIONS, MINORITY ASSOCIATIONS, YOU KNOW, TRY TO GET OUT THERE AS MUCH AS POSSIBLE.

LAST WEEK, WE HAD A MEETING WITH THE TRADE ASSOCIATIONS AND WE WALKED THROUGH SOME OF THAT INFORMATION AGAIN FOR, THEY CAN GO BACK AND THEN SHARE WITH THEIR MEMBERS.

AND THEN WE WERE ALSO OPEN TO MEETING WITH OUR MEMBERS SPECIFICALLY, IF THEY HAVE SOME, UH, REQUESTS FOR ONE-ON-ONE CONTACT ON THIS INFORMATION, WE HAVE WHAT WE CALL OUR CIP PARTNERS ACADEMY.

UM, SO A WHILE BACK, WE WERE NOTICING THAT FOLKS WERE COMING IN AND WANTING TO BID THE BID ON OUR PROJECTS, BUT IT WAS OUR FIRST TIME, MAYBE THEIR SECOND TIME.

AND THEY WERE MAKING ERRORS.

THEY WERE UNDERSTANDING THE PROCESS AND I HAD A LOT OF QUESTIONS.

AND SO WHAT WE PUT TOGETHER IS WHAT WE CALL OUR CIP PARTNERS ACADEMY, OR WE BASICALLY HAVE A S A SCHOOL AND WE HAVE MONTHLY SESSIONS ON WHAT STARTED OFF MONTHLY AND WE'VE MOVED.

AND NOW WE KIND OF SPACE IT A LITTLE BIT MORE, A LITTLE BIT BROADER, UM, WHERE WE, THEY HAVE, THEY CAN COME IN, WE DO A PRESENTATION, A SHOW AND TELL, WE ANSWER ALL THE QUESTIONS.

AND THE HOPE IS THAT THEY WALK AWAY EDUCATED ON THE REQUIREMENTS, AND IT'S NOT JUST HOW TO BID A PROJECT, BUT IT'S HOW TO PUT A, A COMPETITIVE BID TOGETHER.

IT'S UNDERSTANDING OUR INSURANCE REQUIREMENTS.

IT'S UNDERSTANDING HOW TO READ OUR DESIGN DRAWINGS, RIGHT? SO REALLY FOCUSED ON EDUCATING OUR CONTRACTING COMMUNITY SO THAT THEY CAN BE SUCCESSFUL PURSUING OUR JOBS.

WE KNOW IT TAKES A LOT OF TIME AND MONEY TO BID OUR PROJECTS, AND WE WANT THEM TO BE SUCCESSFUL OR COMPETITIVE AND NOT FOUND NON-COMPLIANT BECAUSE THEY MISS SOMETHING HERE OR THERE, RIGHT.

AGAIN, A LOT OF COMMUNICATION WITH OUR TRADE ASSOCIATIONS AND OUR, UM, MINORITY ASSOCIATIONS.

AND ON THAT LIST, WE ALSO ARE ABLE TO TAKE QUESTIONS.

SO ROUTINELY I HAVE CONSULTANTS OR CONTRACTORS CALL ME, HEY, I SAW THIS PROJECT ON THE ARE COMING REPORT.

CAN I CAN ASK A COUPLE OF QUESTIONS? AND IF I CAN ANSWER THEM, I'LL POINT IT TO THE RIGHT DIRECTION, UH, DEPARTMENT OR PROJECT MANAGER FOR THAT THEY CAN GET MORE INFORMATION AGAIN, HOPEFULLY THEY'RE, THEY'RE RESERVING THEIR CAPACITY TO COMPETE FOR THAT PROJECT DOWN THE ROAD.

WHEN IT COMES UP, I CAN SHARE A LINK TO, UH, TO THAT WEBSITE, BUT IT'S THERE, IF Y'ALL WANT TO DO THAT LATER ON.

UM, AND YOU CAN REACH OUT TO ME AND I CAN ANSWER ANY QUESTIONS FOR YOU OR FOLKS THAT, UH, YOU KNOW, THAT MAY HAVE QUESTIONS ON THAT.

I TALKED A LITTLE BIT ABOUT RCIP PARTNERS ACADEMY.

I KNOW THESE SLIDES SO MUCH, I'M ALREADY GOING TO GET IN THE HEAD WITH CHANGING THE SLIDE ON, WELL, THERE IS THE WEBSITE FOR THE LINK, AND YOU CAN FIND THAT MONTHLY REPORT THERE.

WE JUST UPDATED IT FOR OCTOBER.

AND SO WE UPDATED THE LAST WEEK OF SEPTEMBER FOR OCTOBER.

AND THEN AS WE CLOSE UP TO THE END OF OCTOBER, WE'LL, WE'LL RELEASE IT FOR NOVEMBER.

AGAIN, IT'S THE MORTGAGE INFORMATION ON OUR CIP PARTNERS ACADEMY THAT I ALREADY TALKED ABOUT REALLY TRYING TO, UH, ENSURE THAT CONTRACTORS KNOW ALL, BUT HOW WE WORK OUR REQUIREMENTS, UH, TO SUCCESSFULLY COMPETE FOR OUR PROJECTS.

AND, UH, I'LL SHOW YOU THE, UM, THAT'S THE LINK THERE TO OUR WEBPAGE FOLKS CAN REGISTER.

UH, WE WERE DOING THEM IN PERSON AND NOW WE DO IN VIRTUALLY.

AND THEN THE GREAT THING ABOUT DOING THEM VIRTUALLY NOW IS THAT IF YOU CANNOT ATTEND A LIVE, UH, WE RECORD THEM AND THERE ARE FUNDING OUR WEBSITES.

SO YOU CAN ALWAYS GO BACK AND CATCH THAT LATER ON, UM, REALLY POPULAR.

UM, THERE ARE SOME SESSIONS THAT WE'VE HAD TO DO DOUBLE JUST BECAUSE THE CAPACITY, UH, WAS SO GREAT AND THEY WERE REALLY POPULAR.

AND SO IT'S SOMETHING THAT WE CONTINUED ON NOW, AND WE DO EVERY YEAR.

UH, WE DO A SURVEY AND THE SURVEY REALLY INFORMS US ABOUT WHAT SESSIONS THAT WE'RE GOING TO HAVE THE NEXT YEAR BASED ON THE FEEDBACK THAT WE GET FROM OUR ATTENDEES.

NEXT, I WANT TO TALK ABOUT, UH, OUR OUTREACH EVENTS, AGAIN, SUPPORTING THE GOAL THAT WE HAVE TO ENSURE COMPETITION IN OUR SOLICITATIONS.

WE DO A LOT OF OUTREACH.

WE DO A LOT OF SESSIONS WITH STAKEHOLDERS.

UM, THESE ARE A FEW OF THOSE.

THE BLUE ARE SPECIFIC TO CONSTRUCTION SERVICES.

THE, UH, THE, THE BLACK, UH, COLOR TONE IS, UM, FOR, UH, ENGINEERING SERVICES, OUR SERVICES.

SO OUR, OUR 2019 CONSULTANT FORUM, UM, WE GO ON AND PRESENT AT ASSOCIATIONS LIKE THE AUSTIN CONTRACTORS AND ENGINEERS ASSOCIATION.

AND WE'VE BECOME REALLY GOOD FRIENDS WITH THE EXECUTIVE DIRECTOR

[00:30:01]

AND MAKE OURSELVES AVAILABLE TO THEM AND THEIR MEMBERS.

UH, IN 2019, WE HAD A CONSULTANT AND CONTRACT A CONSTRUCTION CONTRACTOR SYMPOSIUM.

AND SO, UM, WHAT WE DO THERE REALLY IS WE HAVE LIKE A ONE DAY SESSION WHERE WE, UH, WE TALK ABOUT OUR PROCESS.

WE INVITE THE DEPARTMENTS LIKE AUSTIN WATER, OTHER DEPARTMENTS TO COME IN AND TALK ABOUT THEIR PROCESSES, THEIR PROGRAMS. AGAIN, THE IDEA IS TO PROVIDE AS MUCH INFORMATION AS POSSIBLE SO THAT FOLKS CAN GET EXCITED ABOUT THE PROJECTS THAT WE HAVE UPCOMING AND CAN RESERVE SOME CAPACITY TO RESPOND TO THOSE, AND THEN REALLY UNDERSTAND THE WAY THE CITY FUNCTIONS IN TERMS OF THE BIDDING CONTRACTING PROCESS.

HERE ARE SOME MORE THAT WE'VE DONE.

UM, AND WHEN, UH, COVID HAPPENED, YOU KNOW, REALLY THE ONLY THING THAT CHANGED IS THAT WE WENT FROM DOING THEM IN PERSON TO VIRTUAL, UM, AND STILL GET A LOT OF GOOD RESPONSE IN VIRTUE AND, AND GET REQUESTED A LOT OF, UM, SESSIONS, UH, WITH OUR ASSOCIATIONS TO, UH, YOU KNOW, AGAIN, CONTINUE EDUCATION TO THEIR MEMBERS.

YOU KNOW, ONE OF THE THINGS THAT WE'VE DONE FOR OTHER PROGRAMS IS, AND, AND IT'S SOMETHING THAT WE'RE GOING TO START DOING FOR AUSTIN.

WATER IS BE MORE TAILORED TO THEIR NEEDS.

UH, SO FOR UPCOMING, UH, SO THIS STATIONS THAT AUSTIN WATER HAS, UH, FOR US TO, UH, HELP THEM DELIVER, WE'RE GOING TO BE DOING SESSIONS THAT ARE REALLY MARKETING.

THE FOLKS THAT ARE, ARE THE CONTRACTORS THAT HAVE INTEREST IN THOSE PROJECTS AND REALLY KIND OF GET MORE TAILORED, UH, COMMUNICATIONS, UH, CONVERSATIONS Q AND A WITH THOSE FOLKS.

SO THAT AGAIN, THEY CAN BE AWARE OF THESE OPPORTUNITIES AND, AND ASK QUESTIONS ABOUT THE PROJECTS ALL BEFORE.

UH, THIS STATION HITS THE STREET.

THIS LIMITATION PROCESS HAS, UH, SEVERAL WEEKS OF ADVERTISEMENT.

WHAT, WHAT WE CALL IS IT'S OUT THERE AND FOLKS CAN READ ALL THE INFORMATION THAT'S AVAILABLE ON THAT, ON THAT PROJECT.

THEY CAN ASK QUESTIONS ALL BEFORE THE BIDS RICARD, BUT I THINK THE MORE WE DO IT UPFRONT, UM, THE MORE INFORMATION THAT WE PROVIDE UP FRONT, HOPEFULLY THAT'LL PROVIDE MORE OPPORTUNITIES TO INCREASE THE RESPONSES THAT WE GET.

SO WE'RE DOING ONE ON THE CAPITAL CONVERSATIONS LAUNCH, UM, MOSTLY OPEN OFFICE DOMINIQUE'S FOR INFORMAL DISCUSSION AND SHORT PROCUREMENT, UH, CONTRACTING TOPICS.

AGAIN, REALLY TAILORED TO A SPECIFIC AREAS OF, OF DEPARTMENTS, WHETHER IT'S AUSTIN, WATER, UM, AVIATION, UM, CONVENTION CENTER, WE'RE WORKING ON A HUGE PROJECT FOR THEM.

AND THAT ATTRACTS A DIFFERENT TYPE OF CONTRACTOR, AND THEN REALLY GOING, HUNTING INTO THE SPECIFIC ONES FOR AUSTIN WATER, RIGHT? SO A VIRTUAL EVENT TO PROMOTE UPCOMING AUSTIN WATER FACILITIES, IDQ IQ AND OTHER UPCOMING AUSTIN WATER PROJECTS FOR POTENTIAL BETTERS.

SO THAT'S ANOTHER LAYER OF, OF, UM, OUTREACH THAT WE'RE GOING TO START TAKING, UH, TO HOPEFULLY INCREASE THE COMPETITION THAT WE SEE, UH, FOR SPECIFIC TYPE OF CONTRACTS, ID, IQ, SMALL SCOPE OF WORK PROJECTS THAT, UH, AUSTIN WATER HAS A MARKETING.

UH, AGAIN, WE USE A LOT OF DIFFERENT TOOLS, UH, MECHANISMS TO PROVIDE INFORMATION TO OUR VENDORS, OUR WEBSITE, OUR FACEBOOK, UH, REGULAR MEETING, UH, EMAILS THROUGH OUR TRADE ASSOCIATIONS, UH, IN-PERSON OR VIRTUAL MEETINGS WITH THEIR EXECUTIVE DIRECTOR OR THEIR BOARD, UH, AND THEIR STAFF.

UH, WE HAVE A VENDOR MAILING LIST.

UH, WE DO EVENT BRITE INFORMATION.

WE HAVE ONSITE KIOSK, NOT ONLY IN OUR OFFICE BUILDING, BUT WE ALSO PARTNER WITH, UH, TRAVIS COUNTY, UH, OTHER LOCAL MUNICIPALITIES WHEN THEY'RE HAVING EVENTS.

AND WE PROVIDED STAFF TO GO THERE AND TALK ABOUT HOW TO REGISTER WITH THE CITY OF AUSTIN, AND THEN ALSO HOW TO UNDERSTAND OUR PROCUREMENT BIDDING REQUIREMENTS THAT WE HAVE.

SO THIS IS SOMETHING THAT WE DID A LITTLE BIT ON THE PREVIOUS AUSTIN WATER PROJECT.

I BELIEVE IT WAS THE AUSTIN WATER PLAN.

AND, UH, MR. MORIARTY, I THINK YOU WERE REALLY INVOLVED IN THAT ONE.

AND IT WAS TRYING TO ENSURE THAT THE CONSULTANTS THAT WE WERE LOOKING FOR TO HELP US WITH THAT PLAN WERE AWARE OF THIS OPPORTUNITY TO CONTRACT THE CITY.

AND SO WE ACTUALLY ADVERTISE IN AUSTIN WATER-RELATED MAGAZINES, NEWSPAPERS ARTICLES, TO TRY TO ENSURE THAT WE WERE HAVING THAT LEVEL OF EXPERIENCE, RESPOND TO OUR PROJECTS.

AND SO FROM THAT IDEA, THAT CAME FROM, UH, YOU KNOW, OUR APPROACH OF WHEN WE HAVE THESE OTHER TYPES OF STATIONS, WHERE OUR EXPERIENCE TELLS US THAT IT'S LIMITED COMPETITION, WHICH SHOULD LEVERAGE THOSE RESOURCES AND UTILIZE THOSE TO MARKET.

THOSE ARE THE STATIONS AS WELL AS, SO WE'LL BE DOING SOME OF THAT AS ON THAT AREA.

AND THEN, YOU KNOW, TRYING TO FIGURE OUT IF WE CAN, UH, INCREASE, UH, INTEREST PARTICIPATION IN OUR PROJECTS, UH, WHEN WE SEE FEWER ATTENDEES AT OUR PRE-BID MEETINGS.

SO THAT SECOND BULLET THERE TALKS ABOUT WHEN WE SEE THREE OR FEWER PRIME BIDDERS AT OUR, AT OUR PRE-BAKE CONFERENCE, YOU KNOW, LET'S TAKE A STEP BACK AND SEE IF WE CAN DO SOME MORE DIRECT OUTREACH TO SPECIFIC CONTRACTORS THAT WE KNOW DO THAT KIND OF WORK HAVE BID ON THIS PREVIOUS WORK BEFORE, OR HAVE DONE THAT WORK BEFORE WITH US OR OTHER ORGANIZATIONS.

[00:35:01]

UM, WE MIGHT WANT TO EVEN CONSIDER EXTENDING THE BID ADVERTISING PERIOD.

SO THE STATE STATUTE SAYS THAT A CITY, UH, CITY OF AUSTIN, ITS SIZE HAS TO ADVERTISE FOR A MINIMUM TWO WEEKS.

UH, RIGHT NOW WE'RE ADVERTISING ANYWHERE FROM 46 WEEKS.

AND IT'S, IT'S BASED ON FEEDBACK FROM CONTRACTORS.

THEY NEED MORE TIME.

UM, SO ON THE, UH, THAT'S A GOOD THING, RIGHT? BUT ON THE FLIP SIDE, IT, IT COMPRESSES OUR SCHEDULE.

YOU KNOW, WE'RE TRYING TO PUT THINGS OUT AS QUICKLY, TURN THIS CONSCIOUS AROUND SO THEY CAN GET THE WORK DONE ON A TIMELY FASHION, BUT WE THINK THERE'S VALUE IN THAT.

UM, AND AGAIN, IT'S SOMETHING THAT WE'VE HEARD DIRECTLY FROM CONTRACTORS ON, AND WE MODIFIED THAT.

UM, IF CONTRACTORS FEEL LIKE THEY WANT TO, UH, THEY MISS THE FIRST GROUP OF MEETING OR THE SITE VISIT AND THEY WANT TO ATTEND ONE OF THESE OR EVEN DO A SECOND SITE VISIT.

WE WANT TO ACCOMMODATE THAT.

SO THAT AGAIN, TRY TO INCREASE OUR COMPETITION, UM, RECOGNIZING THAT THEY'RE BUSY, UH, THERE'S A LOT OF WORK GOING ON.

AND SO CAN WE DO OTHER STUFF TO ENSURE THAT THEY HAVE ALL THE INFORMATION AND THEN HOPEFULLY THEY MAKE AN EDUCATED DECISION ABOUT PURSUING THAT PROJECT BECAUSE IT MAKES SENSE FOR THEM.

RIGHT.

OKAY.

I AM DONE WITH MY SLIDES AND, UM, I KNOW WAS A LOT OF INFORMATION AND I'M HAPPY TO GO BACK TO ANY OF THE PREVIOUS SLIDES OR ASK OR ANY QUESTIONS THAT Y'ALL MAY HAVE COMMISSIONER HAS GOT ANY QUESTIONS FOR MR. , REGINA MORIARTY PRIESTS, UM, MICROPHONE WORKING.

OKAY.

YES, SIR.

UM, WHEN I'M CONCERNED IS THAT YOU ALL ARE TRYING TO CONDITION US THAT THIS IS OKAY.

AND I DON'T THINK IT IS.

I THINK WE NEED TO HAVE MULTIPLE BIDDERS FOR THESE CONSTRUCTION CONTRACTS OR THERE'S A POTENTIAL FOR, UH, OVERPRICING.

AND, UM, SO, UH, IS, IS, UM, I'M NOT CONVINCED BY WHAT YOU TOLD ME.

UM, WHEN I LOOK AT THESE FIVE PROJECTS THAT YOU HAD THE SINGULAR BITTERS, I DIDN'T KNOW ABOUT THE LITTLE ONES, BUT MAYBE WE DON'T SEE THOSE.

AND, UM, BUT THERE IS NO REASON WE COULDN'T HAVE HAD MULTIPLE BIDDERS ON THOSE OTHER PROJECTS.

I MEAN, WE SAT HERE AND TALKED ABOUT IT.

THE FIRST ONE, THAT LIFT STATION ONE, WE ACTUALLY VOTED NOT TO APPROVE THAT.

UH, THE SECOND ONE WE VOTED TO APPROVE, ALTHOUGH I DIDN'T VOTE FOR IT, BUT I REALLY THINK THIS IS BAD PRACTICE.

AND, UH, I THINK THERE'S SOME BAD THINGS GOING ON, UM, THAT I THINK SOME OF THESE CONTRACTS, THERE'S, THERE'S PEOPLE DISCOURAGING, BITTERS DISCOURAGING, AND THAT'S WHY THERE'S ONLY ONE BIDDER.

AND WHAT I THINK OUGHT TO BE DONE WITH THOSE TWO CONTRACTS IS THEY OUGHT TO BE LOOKED INTO IN DEPTH.

AND WHEN THE GENTLEMEN WERE HERE BEFORE, UH, THEY TOLD ME THAT THEY WERE GOING TO DO A POST-BID SURVEY, UH, OR THEY HAD DONE IT AND THEY WERE REALLY KIND OF UNCERTAIN.

WHAT WAS DONE.

WAS IT EMAIL? WAS IT AN INTERVIEW? UM, I THINK IF YOU DO THAT SURVEY AND MAYBE YOU'VE ALREADY DONE IT, AND IF YOU HAVE DONE IT, I'D LIKE TO SEE THE RESULTS.

YOU'LL PROBABLY SAY I CAN'T SEE HIM BECAUSE I WORKED FOR THE CITY, BUT, UH, I THINK YOU'RE GOING TO DISCOVER THAT THERE'S THINGS THAT WERE NOT DONE PROPERLY.

SO, UH, MY INTEREST, A COUPLE OTHER THINGS I'VE BEEN A LITTLE DISTURBED ABOUT IS WHEN WE BROUGHT THIS UP IN THE PAST AND WE SAY, WELL, HOW DO WE KNOW WE'VE GOT A GOOD PRICE OR NOT, BECAUSE WE DON'T HAVE ANY OTHER BIDDERS.

AND, UH, THE CITY PEOPLE SAID, WELL, WE CHECKED WITH THE LAST TIME WE BID IT THREE YEARS AGO.

WELL, HOW MANY BIDDERS DID WE HAVE THREE YEARS AGO? WELL, WE HAD ONE.

SO WE'RE STILL IN A KIND OF AN NON COMPETITIVE ENVIRONMENT.

WE'RE COMPARING NON-COMPETITIVE TO NON-COMPETITIVE.

SO, UH, AND THEN I ALSO HEARD THE STORY THAT, WELL, WE DON'T HAVE TIME.

THESE ARE CRITICAL PROJECTS, AND IF WE REBID IT WILL, BUT THESE TWO BIGGER CONTRACTS, THESE ARE LIKE A THREE-YEAR ROTATION.

SO IT'S ALMOST LIKE WHEN YOU AWARD THE FIRST ONE, YOU KNOW, IN THREE YEARS, YOU'RE GOING OUT TO BID AGAIN BECAUSE THE CONTRACT AMOUNT WILL BE USED UP.

SO WHY NOT START A LITTLE EARLIER SO THAT THERE IS TIME IN THE PROCESS TO, TO REBID THESE THINGS.

IF WE DON'T ATTRACT, I THINK IF THE CITY DID WORKED AT THIS HARDER AND INTERVIEWED THESE CONTRACTORS AND

[00:40:01]

FIND OUT REALLY WHY THEY DIDN'T BID AND JUST SAY, EVERYBODY'S BUSY, THEY DON'T WANT TO BID IT BECAUSE THESE ARE SUBSTANTIAL JOBS.

$12 MILLION JOB IS NOT A SMALL CONTRACT AT ALL.

AND THE OTHER ONE IS BIG.

SO I SAY TO MY FELLOW COMMISSIONERS AND MAY NOT AGREE WITH ME.

I THINK WE, AS A COMMISSION SHOULD DO SOMETHING ABOUT THIS THAT MAYBE EVEN CONSIDER CREATING A RESOLUTION THAT WE'RE NOT VOTING FOR ANYTHING THAT DOESN'T HAVE THREE BIDS.

AND I TRULY BELIEVE THAT'S NOT THAT HARD TO DO.

UH, I PERSONALLY WOULD NEVER BRING A DEAL LIKE THIS WITH ONE BIDDER WOULD NEVER EVEN CONSIDER IT WOULD TAKE IT RIGHT BACK OUT AND REDO THE DESIGN, MEET WITH THE CONTRACTORS, WITH THEIR SOMEWHAT UNUSUAL THING THAT CAUSED EVERYBODY, NOT THE BID OR WHAT IS IT, THE WRONG BID DATE THAT THE HIGHWAY DEPARTMENT WAS TAKING BIDS THAT DAY.

AND YOU WERE TOO BUSY.

ALL OF THOSE THINGS, MY INTEREST IN OUR JOB HERE IS, IS OVERSIGHT.

THAT'S, THAT'S ALL WE DO.

WE'RE HERE TO CHECK THESE CONTRACTS AND VOTE ON, AND I'M VERY DISTURBED ABOUT THIS, BUT THANK YOU FOR THE PRECONDITIONS.

AND IF I MAY JUST REALLY QUICK, I, UM, JUST TWO POINTS IN THAT.

AND I APPRECIATE THE FEEDBACK, SIR.

AND, AND CERTAINLY, UM, THE FACT THAT IT'S ONE OF, ONE OF OUR GOALS IS BECAUSE I, I AGREE IN THE SENSE OF THE COMPETITION IS IMPORTANT, RIGHT? UH, THE FIRST POINT THAT I WANTED TO MAKE IS, YOU KNOW, CAPITAL AN OFFICE, THIS OFFICE THAT I'M RESPONSIBLE FOR AT THE TIME BEING, UM, IT'S A STANDALONE ENTITY IN A SENSE WHERE I DON'T REPORT TO THE DIRECTOR, AUSTIN WATER, I DON'T REPORT TO THE DIRECTOR OF PUBLIC WORKS.

RIGHT.

UM, IN FACT, I REPORT TO THE CHIEF FINANCIAL OFFICER AND THAT WAS DONE INTENTIONALLY, UM, YEARS BACK, THIS OFFICE WAS PART OF A DIFFERENT DEPARTMENT.

AND ONE OF THE REASONS WHY IT WAS SEPARATED IS BECAUSE THEY WANTED TO HAVE THAT INDIVIDUAL OVERSIGHT FOR THE WATER CONTRACTS AND THE OVERSIGHT OF CONTRACTS.

SO THAT FROM THE OFFSITE, IT DOESN'T LOOK LIKE THERE IS NO FAVORITISM, OR IT HAS TO BE THIS VENDOR.

AND THAT ONLY THAT VENDOR CAN HAVE BEEN ANYBODY ELSE, OR THERE WAS FEEDBACK ON YOU, CAN'T GET THIS CONTRACT.

UM, AND YOU KNOW, ULTIMATELY IT'S MY RESPONSIBILITY TO ENSURE THAT AT THE END OF THE DAY, THAT THE PROCESS THAT WE LEAD AND AWARDING THE CONTRACTS IS SOMETHING THAT WE CAN STAND FIRM ON, RIGHT.

UH, THAT, UM, THERE IS, UH, INTEGRITY, RIGHT? THAT THERE'S, UM, IT'S TRANSPARENT.

AND I TAKE A LOT OF PRIDE IN THAT, AND WE PUT A LOT OF MEASURES IN PLACE SO THAT WHEN IT COMES TO DECISIONS ABOUT WHETHER WE AWARDED AN AWARD, A CONTRACT IT'S NOT MADE BY THE PROJECT MANAGER, OR IS NOT MADE BY SPONSOR PARTY, THEIR, THEIR FEEDBACK IS VALUABLE.

ABSOLUTELY.

THEY'RE EXPERTS IN THEIR FIELD, THEY'RE EXPERTS.

THEY IMAGINED PROCESS, UH, OF THE PROJECT, RIGHT.

BUT YOU KNOW, THE STATUTES, UM, THE, THE ORDINANCES THAT GOVERN HOW WE DO, UH, PROCUREMENT AND CONTRACTING REALLY FALL ON THE PROCUREMENT OFFICE IN THIS CASE, MY OFFICE.

AND SO, UM, WE HAVE MEASURES IN PLACE SO THAT WHEN WE'RE DOING SOMETHING LIKE TO NOT AWARD A CONTRACT OR TO MOVE FORWARD TO CONTRACT IS BECAUSE THE DUE DILIGENCE HAS BEEN DONE IN TERMS OF THEY MET ALL THE REQUIREMENTS THEY'RE RESPONSIBLE, RIGHT.

AND THEN THE SECOND POINT ABOUT THE PRICE, RIGHT? SO EVERY SOLICITATION THAT WE ISSUE FOR A CONSTRUCTION PROJECT, BUT EVEN THE IDEA IQ ON THE INDEFINITE DELIVERY, WE SET OUT WHAT WE THINK IS OUR BUDGET.

HERE'S HOW MUCH MONEY WE HAVE TO SPEND ON THIS PROJECT.

RIGHT? BUT IN TERMS OF THE COMPETITIVE BIDDING PROCESS, WE RECEIVE, WHETHER IT'S, IN-HOUSE THROUGH A PUBLIC WORKS ENGINEERING DEPARTMENT, A DIVISION WHERE THEY PROVIDE ENGINEERING SERVICES, WE HAVE AN ESTIMATE, AND THEN THE CONSULTANT PROVIDES US AN ESTIMATE.

AND THAT, THAT ESTIMATE IS AS DEVELOPED THROUGH, YOU KNOW, 30, 60, 90 INCREMENTAL PERIODS OF THE DESIGN PROCESS.

AND WHEN THEY GET TOWARDS THE END, IT HAS TO BE WITHIN FIVE, YOU KNOW, LIKE 5% OF ACCURACY THAT THAT'S THE BID PRICE.

WHEN WE GET, WHEN WE GET A BID, WE'LL LOOK AT IT AND SAY, HOW DOES THAT LOOK? IS THAT WITHIN THE ESTIMATE? IS IT NOT? WHY IS IT NOT RIGHT? CAN WE GO BACK AND RUN THE NUMBERS? SO THERE IS A DUE DILIGENCE THAT'S DONE BY A PUBLIC PROJECT MANAGER SPONSORED DEPARTMENT.

AND THEN THE CONSULTANT ENGINEER THAT WE RETAIN, RIGHT.

TO GIVE US THAT THIRD PARTY PERSPECTIVE ON THAT PRICING.

AND WE DO THAT, WHETHER THE BID IS HIGH OR EVEN LOW, LIKE IF THEY COME IN LOWER THAN THE ENGINEER ASSESSMENT, WAIT A MINUTE, WHAT DO THEY MISS? RIGHT.

WHAT, WHY THIS SO LOW? SO THOSE ARE THE KINDS OF QUESTIONS THAT WE'RE ASKING OURSELVES, BECAUSE THE WORST THING THAT WE CAN DO IS, IS GET AN UNDER CONTRACT WITH SOMEBODY THAT EITHER UNDERBID IT OR OVERBID IT, OR THEY'RE NOT QUALIFIED, OR, YOU KNOW, EXPERIENCES OF THE PROJECT, BECAUSE THEN IT BECOMES A LOT HARDER TO GET OURSELVES OUT OF THAT CONTRACT OR MANAGE THROUGH THAT.

SO I APPRECIATE THE FEEDBACK START.

WE WILL CONTINUE TO WORK ON THIS.

WE WILL DO OUR BEST, CONTINUE TO DO OUR BEST, TO GET MORE COMPETITION IN OUR CONTRACTS.

BUT I WANTED TO ASSURE YOU THAT THOSE PROCESSES ARE IN PLACE IN TERMS OF THE INTEGRITY, THE OVERSIGHT OF HOW WE WORK CONTRACTS, AND THAT WE DO LOOK AT PRICE AS PART OF OUR, UH, YOU KNOW, OUR CHAT.

RIGHT.

UM, BUT REALLY WANT TO, UM,

[00:45:01]

APPRECIATE THAT FEEDBACK AND CONTINUE WORK ON THIS.

SO YOUR PROCESS THAT'S LACKING IN MY OPINION, IS WHEN YOU GET ONE BIDDER, YOU NEED TO REBID IT.

THAT WOULD BE MY RECOMMENDATION.

THANK YOU, SIR.

COMMISSIONER GOT A QUESTIONS FOR MR. FARENTHOLD COMMISSION, MISS, UH, COMMISSIONER MASCARO PRIESTS.

WHEN YOU HAD THOSE FOCUS MEETINGS WITH THE CONTRACTOR ASSOCIATIONS, DID THEY EVER COME OUT THAT THE CITY ISN'T SOMETHING THEY WANT TO WORK FOR? AND IF THEY'RE BUSY WITH OTHER JOBS, THEY DON'T NEED A CITY JOB BECAUSE OF THE PAPERWORK OR THE RATES THEY HAVE TO PAY EMPLOYEES, OR THE QUICKLY HOW QUICKLY WE PAY ON, YOU KNOW, STATEMENTS.

SO I JUST WAS WONDERING IF THAT WAS A REASON AT ALL, WHY YOU WEREN'T GETTING YEAH.

THAT THAT'S, THAT'S CERTAINLY IS AS, UM, AS FEEDBACK THAT WE GOT IN, RIGHT, AS A, YOU KNOW, AS A GOVERNMENTAL ENTITY, RIGHT.

WE, WE HAVE THE ABILITY TO COUNCIL POLICY TO SET ADDITIONAL REQUIREMENTS OF OUR CONTRACTORS, WHETHER IT'S, YOU KNOW, PREVAILING WAGE, A LIVING WAGE, $15 AN HOUR PREVAILING WAGE, WHERE IT'S, YOU KNOW, DOL DEPARTMENT OF LABOR, UH, SET RATES WHERE WE INTEGRATE OUR CONSTRUCTION TRAINING PROGRAM, WHERE WE INTEGRATE OSHA TRAINING OF 15 HOURS OR 30 HOURS FOR THE, FOR THE SAFETY SUPERINTENDENT.

I MEAN, YOU KNOW, REST BREAK ORDINANCE.

I MEAN, WE, WE DO A LOT OF DIFFERENT THINGS IN OUR CONTRACTS AND IT IS OUR HOPE THAT CONTRACTORS SEE THAT AS, UM, GOOD THINGS THAT WE'RE DOING.

RIGHT.

UM, BUT IN SOME CASES WE HAVE HEARD FEEDBACK THAT IT'S JUST, IT'S MORE WORK FOR ME.

IT'S MORE REQUIREMENTS FOR ME.

AND, AND IN THIS CASE, YOU KNOW, I DON'T HAVE TO DO THAT BECAUSE THERE'S OTHER PLACES I CAN GO WORK.

SO CERTAINLY I'VE HEARD THAT.

AND OUR, MY GOAL AS A DEPARTMENT IS TO IMPLEMENT THAT POLICY IN THE WAY THAT ACHIEVES THE GOAL OF THE COUNCIL.

BUT IT ALSO DOESN'T IN A WAY THAT IT DOESN'T IMPEDE A BURDEN, THE CONTRACTORS RIGHT BY, OH, I GOTTA DO THIS NOW.

AND IT JUST TAKES ME SO MUCH TIME AND EFFORT THAT IT'S NOT EVEN WORTH IT.

RIGHT.

AND SO THAT'S THE GOAL OF HOW WE GO ABOUT IMPLEMENTING POLICY IN OUR CONTRACTS.

UM, BUT, BUT THERE DOES, THERE DOES COME SOME ADDITIONAL RESPONSIBILITIES, YOU KNOW, W YOU KNOW, WORKING WITH THE GOVERNMENT.

UM, I WOULD SAY THIS THOUGH, IN MY, IN MY EXPERIENCE, UM, IN THIS OFFICE, AND I'VE BEEN IN THIS OFFICE SINCE 2010 AS IS THE DIRECTOR, NOT OFFICER, WE'VE BEEN, WE ALWAYS STAY PRETTY STEADY.

THERE ARE TIMES THAT WE'RE REALLY BUSY, LIKE RIGHT NOW, BUT THEN I'VE NEVER FELT LIKE A, A SLOW SLOWDOWN IN OUR CONTRACT AWARD.

WE WERE ALWAYS, YOU KNOW, PUTTING OUT PROJECTS, PUTTING OUT PROJECTS.

AND I, AND I SAY THIS IN A WAY WHERE, LIKE, IF YOU CAN UNDERSTAND THE CITY PROCESS REQUIREMENTS AND, UM, THAT THERE'S ALWAYS OPPORTUNITY WITH US, RIGHT.

AND OUTSIDE THE CITY, IT MAY SLOW DOWN.

RIGHT.

OR IT MAY SLOW, YOU KNOW? AND SO I THINK IT'S ALWAYS, I ALWAYS RECOMMEND THAT PEOPLE COME IN AND PURSUE THE CITY WORK BECAUSE IT'S STABLE.

RIGHT.

WE'LL BE REALLY BUSY AND WE'LL SLOW, SLOW DOWN A LITTLE BIT, BUT NOT IN A WAY WHERE THEY'RE NOT PUTTING ANY PROJECTS OUT.

I MEAN, WE, I, I WAS EXPECTING THE SLOW DOWN DURING THIS WHOLE COVID SITUATION.

THE ONLY ONE WE SLOWED DOWN WAS THAT FIRST SPRING BREAK, THAT AFTER COVID HAPPENED, WHERE WE WERE SHUTTING DOWN AND IT WAS TO TRANSITION US FROM BEING IN THE OFFICE, TO BEING AT HOME.

AND WE PUSHED OUT A COUPLE OF BIDS AFTER THAT, YOU KNOW, I WAS GETTING CALLS FROM CONTRACTORS AND CONSULTANTS, HEY, I WANT TO BID THE PROJECT.

I JUST WANT TO DROP IT OFF IN PERSON.

CAN YOU DO IT VIRTUALLY? CAN I DO IT ELECTRONICALLY? AND THAT WAS OUR FOCUS.

RIGHT.

AND WE DID THAT AND WE HAVE NOT SLOWED DOWN.

IT'S IT'S, WE HAVE A LOT OF WORK GOING ON.

WE HAVE DEPARTMENTS LIKE AUSTIN WATER THAT GIVES US, KEEP US REALLY BUSY.

WE HAVE BOND PROGRAMS THAT WE'RE TRYING TO MEET THE COMMUNITY'S EXPECTATION TO GET IN, EXECUTE IT WITHIN A TIMEFRAME THAT WE COMMITTED TO.

AND SO, UM, YEAH.

SORRY.

GOT ANY QUESTIONS FOR MRS. FERNANDO? I'D LIKE TO COMMENT ALSO CHEERLY ON, UM, AS A SPONSORING DEPARTMENT, UH, WE ARE MAKING A LOT OF EFFORTS TO MAKE OUR PROJECTS, UM, ATTRACTIVE AND COMPETITIVE.

I THINK YOU ALL HEARD WHEN YOU APPROVED THE, OR WHEN YOU VOTED ON THE, UM, ID, THE FACILITIES, LIFT STATION ID IQ CONTRACT THAT HAS THE EMERGENCY PROVISIONS IN IT.

THAT ORIGINALLY WAS A SINGLE ID IQ FOR OUR WORK IN ALL OUR FACILITIES.

AND WE SPLIT THAT INTO TWO.

SO THAT ONLY ONE OF THEM HAS THE EMERGENCY PROVISIONS IN IT.

AND WE'LL BE BRINGING YOU, WE'LL BE BIDDING THE, THE SECOND FACILITIES ID IQ THAT DOES NOT HAVE THE EMERGENCY PROVISIONS IN IT, UM, SHORTLY.

AND THAT IS THE ONE THAT, UH, ROLANDO WAS TALKING ABOUT THE, UH, BITTER OUTREACH THAT WE'RE DOING.

SO WE ARE, UM, JUST LIKE, UH, ROLANDO WAS SAYING YOU'VE COVERED THE, THE, THE ISSUES VERY CLEARLY.

UM, AND WE'RE FULLY ENGAGED WITH CCO TO ACHIEVE COMPETITIVE BIDS.

UH, TO MY KNOWLEDGE, THERE HAS NOT BEEN ANY ALLEGATIONS OF, OF, UM, UNDERHANDED DEALINGS.

UH, SO, UM, YOU KNOW, I THINK WE'RE, WE'RE WORKING HAND IN HAND WITH CCO TO MAKE SURE WE FOLLOW THE PROCESS.

WE GIVE THE BITTERS ENOUGH TIME TO GIVE US GOOD BIDS.

WE GIVE THEM GOOD DRAWINGS

[00:50:01]

TO BID ON AND, UM, AND GET OUR, GET OUR PROJECTS BUILT.

OKAY.

YEAH.

I THINK WE ARE FOCUSING TODAY IS ON THE PROCUREMENT PROCESS.

BY THE TIME WE GO OUT FOR BID ON THE STREET, IT'S, IT'S BEYOND, ALMOST BEYOND OUR CONTROL.

IT'S VERY DIFFICULT.

I THINK WE NEED TO FOCUS ON BEFORE, PUT ON THE, FOR ADVERTISEMENT, FOR EXAMPLE, WE'VE GOT A TIMES WE ARE PULLING THIS HANCOCK ONE OR TWO IN PRINT OR HPAC.

THE PRAM IS ONLY WORKING 50%.

AND THEN THE SUB, THE OTHER SUB GOT 50% OF THE WALK.

SHOULD WE PACKAGE IT EDITED WITH DIFFERENT DIFFERENTLY? I THINK WE NEED TO CONSIDER THAT BECAUSE WE DON'T NEED TO HAVE A GENERAL CONTRACTOR.

SO I STRIPPED OFF HALF OF THE BUDGET TO DO THAT.

YES, THEY ARE SOME MANAGEMENT STAFF THERE, BUT, YOU KNOW, WE SHOULD BE PACKAGING ON THAT STUFF, THEIR PROPERTY PACKAGING, THE STUFF SORT OF SPECIALTIES.

YOU KNOW, WE GOT A LOT OF TIMES WE DON'T GO OUT FOR THEM FOR, ESPECIALLY FOR IT FOR GENERAL COUNTRY.

THEY SAY, HEY, I WANT WATER, WATER PRINT.

I WANT THE WATER.

WELL, I WANT TO BUILD IT THE GROUND STORAGE TANK.

AND I WONDER INNOVATIVE STORY.

THINK YOU DON'T WANT THE, TO PICK OUT AS A ONE BIG POCKET PACKAGE BECAUSE THEN THE GENERAL COUNTRY THAT GOT HIS STUFF RAIL, IF YOU PICK OUT SEPARATED BEFORE THE SPECIALTIES, I'M SPECIALIZED IN ARABIC, IT'S SLOW.

I THINK I GIVE YOU A GOOD PRICE.

I GOT GOOD.

GIVE YOU A GOOD QUALITY PRODUCT.

I THINK THAT'S SOMETHING WE NEED TO BE CAREFUL ON IT.

AND WHAT YOU IN THE DESIGN AROUND TIMES, WE DO SEEM TO BE, TO SAY, WHY YOUR BEEF SO HIGH WAY YOUR, YOUR CONTRACT TIME IS TOO TIGHT.

I KIND OF DIFFICULT TO MAKE IT.

SO THOSE KINDS OF THINGS WE NEED TO DO PREVENTIVE BEFORE, GET TO THE DRAWINGS BEFORE PUT ADVERTISE ON NEWSPAPER.

THOSE THINGS NEED TO BE REVIEWED.

WHEN WE DO THE PRETTY BID, WE DO THE PRETTY BID.

WE NEED TO SURVEY THE, THE POTENTIAL CON UH, PETER'S SAYING, HEY, ARE YOU GUYS GOING TO PUT THE PIT? YOU KNOW, ARE YOU SERIOUS? OR YOU ARE NOT INTEREST.

IF NOT, WE HAD BETTER POSTPONED IT ONE WEEK, TWO WEEKS.

IT WON'T HURT IT THAT MUCH, BUT GIVE US A MAP.

DEEP REPEATERS ARE PRETTY SURE THAT THEY DAY SOME OTHER PEOPLE, SOME ARE PEERS GOING TO COMPETE WITH YOU.

SO THEY DON'T, THEY DON'T FEEL LIKE I AM NOT ONLY THAT PETER, I WILL CHECK UP 10%, 15%.

THEY ARE SO MANY THINGS LIKE GET UP FOR PROFESSIONAL SERVICE, OR IF Q IT'S NOT AUSTIN, BUT I SEEN SOME COMMUNITIES.

THEY PUT THE IFQ TWO WEEKS BEFORE, SINCE GIVEN TWO WEEKS BEFORE CHRISTMAS, YOU KNOW WHAT IT IS TRYING TO DO, THEY TRY TO REDUCE THE EXPOSURE AND THEY CAN GIVE IT TO THIS PRE FOR ENGINEERING INFORMS OR CONSULTANT TO DO IT.

THAT'S WHAT THEY DO.

I'M NOT TALKING ABOUT AUSTIN.

I'M TELLING YOU THE OTHER COMMUNITIES THAT WE EXPERIENCE.

YEAH.

WE THINK WE NEED TO, TO BE CAREFUL ON SOURCING AND A PURGATORY ITEMS. WHEN THE, WHEN THE ENGINEER DESIGN IT, WE NEED TO BE AS MANY CHANCES, GET ON THE SHELF ITEMS AND SAY, THIS IS THE BEST ONE ONLY, ONLY MR. MORIARTY