[00:00:04]
[Determination of Quorum / Meeting Called to Order]
UH, FIVE 11.AND, UM, I'M BRINGING THIS, UH, MEETING OF THE PLANNING COMMISSION TO ORDER.
UM, THIS IS THE NOVEMBER 15TH MEETING, AND WE DO HAVE QUORUM.
UH, WE'LL DO A QUICK ROLL CALL.
AND THEN, UH, JUST WANNA LET FOLKS KNOW WE'VE GOT INTERESTING EVENING WE'RE GOING TO START HERE.
UH, WE'RE GOING TO GO AND, UH, GET THROUGH OUR, UH, CONSENT AGENDA, AND THEN WE ARE GOING TO RECESS AND RECONVENE, UH, IN THE, UH, COUNCIL CHAMBERS, UH, COMING BACK ON AROUND SIX 20 AS SOON AS STAFF CAN SET US UP THERE.
AND I KNOW I HAD COMMITTED TO SOME FOLKS TO NOT START THE BRODY PUD, UM, PUBLIC HEARING UNTIL SIX 30, SO WE'LL TAKE UP SOME ITEMS UNTIL THAT TIME.
UH, BUT ANYWAY, WE'RE GONNA DO SOME QUICK, UM, UH, GET THROUGH THE CONSENT AGENDA, LIKE I SAID, AND THEN WE'LL GO AHEAD AND MOVE, UH, RECESS AND RECONVENE OVER THERE.
SO, UH, LET'S GO AND DO A QUICK ROLL CALL.
UH, THOSE HERE IN, UH, CHAMBERS, UH, BOARDS AND COMMISSIONS ROOM.
UH, COMMISSIONER ANDERSON HERE.
THIS IS YOUR CHAIR, CHAIR SHAW.
AND TO MY RIGHT, UH, COMMISSIONER THOMPSON HERE.
AND, UH, LET'S MOVE OVER TO THE SCREEN.
I SEE, UH, COMMISSIONER HOWARD HERE.
COMMISSIONER MUSH TOLER PRESENT.
ALL RIGHT, AND COMMISSIONER FLORES HERE.
SO THAT BRINGS US TO, UH, FOUR.
SO THAT'S NINE TOTAL, UH, SO FAR.
MAY HAVE A FEW OTHERS JOIN US.
UM, SO, UH, REAL QUICK, UM, YEAH, I THINK WE'RE GONNA GO AHEAD AND GET THROUGH THIS.
WE HAVE NO, UH, PUBLIC COMMUNICATION TODAY.
UM, WE HAD THE MINUTES FROM JUST LAST WEEK, UH, NOVEMBER 8TH, UH, COMMISSIONERS, WERE THERE ANY CHANGES TO THE MINUTES AS POSTED? UH, SEEING NONE, WE'LL GO AHEAD AND ROLL THOSE INTO THE CONSENT AGENDA.
[Reading of the Agenda]
FLORES, UM, IF, UH, THINK YOU'RE GONNA HELP ME OUT AND DO THE FIRST READING OF THE, UH, THE CON, UM, CONSENT AGENDA THIS EVENING? YES.UH, WE HAVE ONE APPROVAL OF MINUTES, UM, TWO ZONING AND REZONING.
C 8 1 4 20 21 0 0 99 BRODY OAKS REDEVELOPMENT PUD UP FOR DISCUSSION.
THREE, RESTRICTIVE COVENANT AMENDMENT C 14 R 8,133, RCA BRODY OAKS, RESTRICTIVE COVENANT AMENDMENT.
THAT ITEM IS UP FOR DISCUSSION.
SAVE OUR SPRINGS, SOS ORDINANCE, BRODY OAKS REDEVELOPMENT SITE SPECIFIC SOS AMENDMENT.
THIS ITEM IS UP FOR CON DISCUSSION.
UM, FIVE PLAN AMENDMENTS, NPA 20 22 0 0 1 7 0.01 CRISP VIEW VILLAGE.
THIS ITEM IS UP FOR STAFF POSTPONEMENT TO DECEMBER 13TH, SIX.
PLAN AMENDMENT NPA 20 21, 0 0 1, 0 0.0 1 2400 E CHAVEZ PARKING ITEM IS UP FOR STAFF POSTPONEMENT TO DECEMBER 13TH, SEVEN, REZONING C 14, 20 21, 0 1, 21, 2400 EAST CESAR CHA IS PARKING.
ITS ITEM IS UP FOR STAFF POSTPONEMENT TO DECEMBER 13TH.
PLAN AMENDMENT NPA 20 22 0 0 2, 1 0.02 BURLESON AND BEN WHITE.
THIS ITEM IS UP FOR PC POSTPONEMENT TO DECEMBER 13TH.
PLAN AMENDMENTS NPA 20 22 0 0 0 7 0.0 ONE TEN EIGHT ONE ZERO NEWMONT ROAD.
THIS ITEM IS UP FOR PC POSTPONEMENT TO DECEMBER 13TH, 10.
REZONING C FOURTEEN TWENTY TWENTY TWO ZERO ONE THREE SIX TEN EIGHT ONE ZERO NEWMONT ROAD, PC POSTPONEMENT TO DECEMBER 13TH, 11 REZONING C 8 1 4 97 0 1 0.5 LEANDER REHABILITATION, PUD AMENDMENT NUMBER 16.
THIS ITEM IS UP FOR STAFF AND APPLICANT POSTPONEMENT TO DECEMBER 13TH, 2022, UH, 12 REZONING C 14 20 22 0 2, 0 6 15 17 KRAMER LANE.
13 REZONING C 14 20 22 0 76, 3100 GUADALUPE, THIS ITEM IS UP FOR PC POSTPONEMENT TO DECEMBER 13TH,
[00:05:01]
14, REZONING C 14 20 22 0 1 31 SOUTHEAST NORWOOD CO AMENDMENT.SPRINGDALE COMMERCIAL TRACK TWO AMENDED.
THIS ITEM IS UP FOR STAFF POSTPONEMENT TO DECEMBER 13TH, 16 REZONING C 14, 20 22 0 15 SPRINGDALE COMMERCIAL.
THIS ITEM IS UP FOR STAFF POSTPONEMENT TO DECEMBER 13TH, 17, REZONING C 14 20 22 0 1 2 0 5 0 0 3.
18 REZONING C 14 H 20 22 0 1 39 FELT MOSS HOUSE.
CODE AMENDMENT C 20 22 0 0 0 4.
THIS ITEM IS UP FOR DISCUSSION.
UM, PUBLIC HEARING HAS BEEN CLOSED, BUT THE PUBLIC HAS BEEN ALLOWED TO REGISTER AND PROVIDE REMARKS AND STAFF PRESENTATION AND Q AND A CONDUCTED 20 IMAGINE AUSTIN AMENDMENTS CPA 20 22 0 1 PALM DISTRICT PLAN.
THIS ITEM IS UP FOR DISCUSSION.
AND THEN 21 POLICY PLAN FOR PRESENTATION AND ACTION, THE EQUITABLE TRANSIT ORIENTED DEVELOPMENT POLICY PLAN.
AND THAT IS THE CONSENT AGENDA.
OKAY, THANK YOU VERY MUCH, COMMISSIONER FLORES.
I, UH, FAILED TO MAKE THE ANNOUNCEMENT UP FRONT THAT, UM, UH, THIS MAY BE OF INTEREST TO FOLKS OUT THERE IN THE AUDIENCE THAT OUR COUNCIL PASS FOR RESOLUTION THAT WE WILL NO LONGER MEET ON ELECTION DAYS.
SO, UH, THAT IS A CONCERN TO MANY.
AND SO WE WILL NOT BE MEETING ON DECEMBER 13TH.
SO, I, WHEN I READ BACK THE CONSENT AGENDA, I WILL READ BACK THOSE THAT, UH, WERE POSTED FOR DECEMBER 13TH FOR DECEMBER 20TH.
[Consent Agenda]
COMMISSIONERS, ANY QUESTIONS ON THE CONSENT AGENDA?I'M GONNA GO AHEAD AND REREAD IT AND, UH, WE'LL GO AND JUST TAKE CARE OF THAT.
SO THE FIRST ITEM WE HAVE IS THE APPROVAL OF MINUTES FROM NOVEMBER 8TH.
UM, WE HAVE ITEM TWO, UH, ZONING AND, OKAY, SO WE'RE GONNA TAKE UP ITEMS TWO, THREE, AND FOUR TOGETHER IN A PUBLIC HEARING WHEN WE RETURN.
UH, BUT THOSE ARE ALL, UH, DISCUSSION ITEMS. UH, ITEM FIVE IS A PLAN AMENDMENT STAFF POSTPONEMENT TO DECEMBER 20TH.
ITEM SIX, PLAN AMENDMENT, UH, STAFF POSTPONEMENT TO DECEMBER 20TH, ITEM SEVEN OF REZONING.
IT'LL BE A STAFF POSTPONEMENT TO DECEMBER 20TH.
ITEM EIGHT IS A PLAN AMENDMENT ON CONSENT.
ITEM NINE, PLAN AMENDMENT IS A PC POSTPONEMENT TO DECEMBER 20TH.
IT'S A HE'S SEAT POSTPONE TO DECEMBER 20TH.
ITEM 11, REZONING STAFF AND APPLICANT POSTPONEMENT TO DECEMBER 20TH.
AND PLEASE REFERENCE THE ATTACHED MEMO.
13, REZONING PC POSTPONEMENT TO DECEMBER 20TH.
15, REZONING STA POSTPONEMENT TO DECEMBER 20TH, 16, REZONING STA POSTPONEMENT TO DECEMBER 20TH, UH, 17 REZONING.
18 REZONING CON, UH, IT'S ON CONSENT OWNER INITIATED THAT SAYS QUI.
THIS ONE IS, UH, ON, THIS IS FOR DISCUSSION.
UH, NUMBER 19, THAT'S THE CODE AMENDMENT.
AND AS COMMISSIONER FLOD POINTED IT OUT, WE DID, UM, HAVE, UH, THE PUBLIC SPEAK.
UH, WE HAD OUR Q AND A, WE HAD STAFF PRESENTATION, BUT WE WILL ALLOW TWO MINUTES TO EACH FOR THE PUBLIC TO CONTINUE SPEAKING IF THEY, UH, WANT TO END THAT ITEM.
UM, WHICH, UH, WHICH ITEM? EIGHT.
ITEM EIGHT IS ALSO POSTPONED PC POSTPONEMENT TO, UH, DECEMBER 20TH.
I HAD SAID THAT WAS ON CONSENT, BUT THAT IS GOING TO BE TAKEN UP ON DECEMBER 20TH.
[00:10:02]
ITEM THE LIST, ITEM 20, WE HAVE IMAGINE AUSTIN AMENDMENT.THAT ITEM WILL TAKE UP FOR DISCUSSION.
ITEM 21, THE, UH, EQUITABLE TRANS ORIENTED DEVELOPMENT POLICY PLAN.
WE'LL HAVE A STAFF PRESENTATION.
I JUST WANT, UH, THE COMMISSIONERS TO KNOW, UH, THAT, UM, WE, WE CAN HAVE, UM, WE CAN MAKE RECOMMENDATIONS, BUT WE DON'T HAVE TO, UH, WE CAN HEAR THE STAFF PRESENTATION.
WE CAN HAVE Q AND A, BUT DO KNOW THAT THE, THERE WILL BE CODE CHANGES THAT WILL COME OUT OF THIS PLAN, AND THOSE WILL GO THROUGH OUR NORMAL CODE AMENDMENT PROCESS.
SO WE HAVE SOME CHOICES THERE ON HOW WE WANNA HANDLE THAT.
BUT, UH, WE'LL TAKE THAT UP WHEN WE GET TO THAT ITEM.
UH, COMMISSIONERS, ANY QUESTIONS ON THE CONSENT AGENDA BEFORE WE TAKE A MOTION? ALL RIGHT.
DO I HAVE A MOTION ON THE CONSENT AGENDA? UH, COMMISSIONERS ZAR, MAKE A MOTION.
MAKING A MOTION TO CLOSE, UH, PUBLIC HEARING AND APPROVE THE CONSENT AGENDA.
WE HAVE A SECOND, SECOND, SECOND BY COMMISSIONER THOMPSON.
UH, LET'S GO AND TAKE A VOTE THAT IS ON THE DIAS IN FAVOR.
AND I GOTTA BE ABLE TO SEE ACROSS HERE.
OH, PLEASE SHOW ME YOUR GREEN CARDS IF YOU'RE IN FAVOR.
SO WITH THAT, UM, I GUESS AT THIS POINT, UM, MR. RIVERA, WE'RE GONNA GO AND RECESS AND WE WILL RECONVENE AT, UM, SIX 20.
IS THAT STILL THE PLANNED TIME TO START, OR IS THAT AN ESTIMATE? OKAY.
SO WE WILL RECONVENE AT SIX 20 AT THE CITY HALL I COUNCIL CHAMBERS.
WE ARE RECONVENING THIS MEETING OF THE PLANNING COMMISSION.
IT IS 6:27 PM AND, UH, WE HAD, WHEN WE LEFT, WE HAD JUST PASSED A CONSENT AGENDA.
AND WE'RE GONNA TAKE CARE OF A FEW ITEMS BETWEEN NOW, WELL, IT'S ALMOST SIX 30, BUT I THOUGHT WE'D GO AHEAD AND, UH, COVER A FEW THINGS.
UM, WE'VE GOT, FIRST OF ALL, I NEED, IF THERE'S NO OBJECTIONS, I WANNA NOMINATE, UM, COMMISSIONER THOMPSON TO BE THE SECRETARY.
UM, ANDERSON, UH, NO OBJECTIONS.
WE'LL GO AHEAD AND MAKE THAT HAPPEN.
UH, SO HE'LL SIGN OFF ON THE DOCUMENTS OVER THERE.
UH, COMMISSION ZAR, NO, JUST MAKING VOTING IN FAVOR.
UM, WE'RE GONNA GO AHEAD AND, UH, THE NEXT ITEM, JUST TO USE THE LAST TWO MINUTES HERE, UH, TALK A LITTLE ABOUT SCHEDULE.
UM, IF THERE'S NO OBJECTIONS, I WANNA MOVE THAT ITEM UP IN THE AGENDA.
[22. Discussion and possible action to approve the 2023 Planning Commission meeting calendar.]
WAS ITEM 22.WE'LL GO AHEAD AND DISPENSE OF THAT IF THERE'S NO OBJECTIONS.
UH, WE ARE GOING TO SCHEDULE OUR MEETINGS ON THE SECOND AND FOURTH TUESDAY, UH, AS WE DID THIS YEAR FOR 2023.
I DO THEIR, UH, COUNCIL, AS WE MENTIONED EARLIER, UH, THEY, YOU KNOW, WE'RE NOT QUITE SURE WHEN SOME OF THE ELECTIONS WILL BE.
SO AS THOSE ARE ANNOUNCED, AS WE GET FIRM DATES IN MAY, UH, WE KNOW NOVEMBER IS NOT A CONFLICT, BUT THERE COULD BE, UM, FOLLOW UP ELECTIONS.
BUT WE'LL HAVE TO CHANGE OUR MEETINGS AS NECESSARY IF THERE IS A CONFLICT.
BUT THE ONE CONFLICT IS DURING THE, UH, THE WEEK, UH, WHEN OUR MEETING ON THE DECEMBER 26TH, UH, WE WILL JUST HAVE A CONSENT ONLY MEETING ON DECEMBER 19TH.
UH, WE'LL MEET AT FIVE JUST AHEAD OF ZAP AND TAKE CARE OF OUR CONSENT AGENDA.
UH, SO THAT'LL BE OUR LAST MEETING OF THE YEAR.
AND, UM, I THINK THAT'S, UH, SO IF WE CAN, UH, DO WE NEED TO GO AHEAD AND VOTE ON THAT? OKAY.
SO ANY QUESTIONS ON THE CALENDAR FOR NEXT YEAR? I JUST HAVE A COMMENT.
IF WE CAN JUST MAKE SURE THAT ANY HOLIDAYS, SPRING BREAK, ET CETERA, ARE TAKEN INTO ACCOUNT AS WELL AS WE DO THAT.
ANDREW, WE DID NOT LOOK AT SPRING BREAK, DID WE? CUZ WE TYPICALLY TRY TO AVOID THAT ONE TOO.
I DON'T KNOW IF WE'RE, OF COURSE, THAT CAN BE A COUPLE OF DIFFERENT WEEKS DEPENDING ON THE SCHOOL, BUT YES, CHAIR COMMISSION, LADIES ON, WE USUALLY DON'T HAVE THE LUXURY OF TAKING OFF A SPRING BREAK.
WE USUALLY JUST KIND OF HAVE A CONSENT AGENDA.
[00:15:01]
SO, UM, OUR, IF I CAN GET A SECOND ON THE CALENDAR FOR THE NEXT YEAR, COMMISSIONER ZAR, LET'S GO AND TAKE A QUICK VOTE THAT'S ON THE DIAS AND THOSE ON THE SCREEN.UH, THAT LOOKS, COMMISSIONER MOTO.
SO WE HAVE COMMISSIONER MOTO IS, UH, STAINING FROM THAT ITEM.
SO THAT, UH, PASSES POST LIKE WE HAVE NINE TOTAL 8 0 1.
UH, NEXT, UH, THE FIRST DISCUSSION ITEM, WE'RE TAKING UP ITEMS, GET THE NUMBERS RIGHT HERE, TAKING UP ITEMS, UH, TWO, THREE, AND FOUR TOGETHER.
AND THIS IS THE, UH, BRODY OAKS REDEVELOPMENT POD.
AND WE WILL START WITH A STAFF PRESENTATION AND CHAIR COMMISSION.
LADIES ON ANDREW, UH, DO YOU WANT TO, UM, GET AN IDEA OF A ORDER IN REGARDS TO ITEM 21? YEAH.
[21. Policy Plan: Equitable Transit-Oriented Development Policy Plan]
ITEM 21 IS THE ETO.IT IS NOT REQUIRED THAT WE TAKE ACTION ON THIS, SO WE CAN, AND LIKE I SAID EARLIER, THE CODE AMENDMENTS THAT COME OUT OF THAT PLANNING DOCUMENT, THEY WILL COME BACK TO US IN PIECES FOR APPROVAL.
BUT THIS DOCUMENT DOES NOT REQUIRE ACTION ON OUR PART.
WE CAN, UH, WE CAN DISPENSE THAT ITEM THROUGH AN INDEFINITE POSTPONEMENT AND, BUT WE WOULD NOT BE HEARING ANYTHING FROM STAFF.
BUT I AM OPEN TO HEARING THE PRESENTATION AND EVEN HEARING SPEAKERS, UH, WE CAN STOP IT AT THAT OR EVEN GO INTO Q AND A IF WE NEED TO.
SO, JUST QUICK, UM, WANNA JUST OPEN IT UP FOR A QUICK DISCUSSION ON ITEM 21, ON HOW WE WANNA HANDLE THAT.
ARE THERE ANY, UM, ANY COMMENTS OR RECOMMENDATIONS THERE? UH, COMMISSIONER MOOSE.
TYLER, I WOULD LIKE TO HEAR STAFF AND COMMENTS FOR THE EVENING.
SO IF WE START THAT DOWN THAT ROAD, UH, MR. RIVERA, UH, CORRECT ME HERE.
IF WE HAVE STAFF PRESENTATION, WE'RE OPENING IT UP FOR DISCUSSION, WE WOULD THEN GO AHEAD AND HEAR SPEAKERS, UH, AT THAT POINT AS WELL.
CHAIR COMMISSION LADIES ON ANDREW? YES, THAT IS CORRECT.
YOU WOULD HAVE, UM, UH, SPEAKERS, UM, OR STAFF PRESENTATION FOLLOWED BY SPEAKERS AND THEN DEBATE IN ACTION.
SO AGAIN, WE CAN DECIDE AT THAT POINT IF WE WANNA FOREGO Q AND A AND ANY ACTION ON IT, BUT WE'LL GO AHEAD, UH, JUST SO FOLKS OUT THERE KNOW THAT CAME TO SPEAK ON THAT ITEM.
WE WILL HEAR FROM STAFF AND THEN WE WILL TAKE UP SPEAKERS AFTER THAT.
SO LET'S GO AND GET STARTED ON PUBLIC
[Items 2 - 4]
HEARING FOR, UH, LIKE I SAID, ITEMS TWO, THREE, AND FOUR.THIS IS THE BRODY OAKS REDEVELOPMENT POD, AND WE'LL GO AND START WITH STAFF REPRESENTATION.
MY NAME IS WENDY RHODES WITH THE HOUSING AND PLANNING DEPARTMENT.
UH, THIS IS THE BRODY OAKS REDEVELOPMENT, P U D, AS WELL AS A RELATED RESTRICTIVE COVENANT AMENDMENT AND AN AN SOS AMENDMENT THAT APPLIES TO THIS PROPERTY.
UH, THIS PROPERTY IS LOCATED THE NOR NORTHWEST CORNER OF LOOP 360 AND SOUTH LAMAR BOULEVARD, WHICH IS A DESIGNATED CORE TRANSIT CORRIDOR.
UH, THE PROPERTY CONTAINS A VACATED, UH, PORTION OF THE TEXTS RIGHT OF WAY AS WELL AS A COMMERCIAL SHOPPING CENTER THAT WAS DEVELOPED IN 1981.
THE BARTON CREEK GREEN BELT IS AND TRAIL IS TO THE NORTHWEST, AND THERE ARE APARTMENTS, UH, TO THE NORTHEAST ON SOUTH LAMAR.
THE P D PROPOSES A MIXED USE DEVELOPMENT THAT WOULD CONSIST OF UP TO 1700 DWELLING UNITS, 200 HOTEL KEYS, 11, UH, 110,000 SQUARE SQUARE FEET OF RETAIL, AND 30,000 SQUARE FEET OF RESTAURANT USES.
INTERNAL CIRCULATION, UH, CONSISTS OF PRIVATE STREETS WITH PUBLIC EXCESS EASEMENTS.
UH, THE MAXIMUM HEIGHT PROPOSED IS 275 FEET.
THAT WOULD BE AT THE CORNER OF SOUTH LAMAR AND LOOP 360.
AND THERE ARE OTHER LESSER HEIGHTS ALONG THE SOUTH LAMAR AND THE LU 360 FRONTAGE, AND THEN LESSER STILL ON INTERIOR PORTIONS OF THE PROPERTY.
THE P U D PROPOSES TWO LAND USE AREAS.
THE FIRST LAND USE AREA IS GENERALLY LOCATED ALONG SOUTH LAMAR AND LUBE 360.
IT INCLUDES ALL OF THE DEVELOPMENT THAT I JUST DESCRIBED, AS WELL AS A CENTRAL GREEN AREA LOCATED IN THE CENTRAL PORTION OF THE SITE THAT IS PROPOSED TO, TO INCLUDE A PERFORMANCE AREA.
UH, PHASE ONE IS, IS ESTIMATED TO BE OCCUPIED IN 2027.
[00:20:01]
IS AT THE NORTHWEST PORTION OF THE PROPERTY ADJACENT TO THE GREEN BELT, LIMITED TO 5,000 SQUARE FEET OF IMPERVIOUS COVER AND A HEIGHT LIMIT OF 28 FEET.UM, AS THERE ARE, UM, WITH REGARDS TO SUPERIORITY ELEMENTS, THE P D MEETS ALL 12 OF THE TIER ONE ITEMS AND OFFERED SOME ELEMENTS OF SUPERIORITY IN SEVERAL OF THE TIER TWO CATEGORIES AND SUBCATEGORIES.
THIS P D PROVIDES A PEDESTRIAN ORIENTED DEVELOPMENT THAT PROMOTES LIVING, INCLUDES AFFORDABLE HOUSING INITIATIVES, EMPLOYMENT AND SHOPPING, AS WELL AS ACCESSIBLE OPEN SPACE AND CONNECTED TRAIL IMPROVEMENTS WITHIN A PLANNED COMMUNITY SETTING.
A TRAFFIC IMPACT ANALYSIS WAS COMPLETED FOR THIS, UH, ZONING CASE, AND INCLUDES A SUITE OF TRANSPORTATION IMPROVEMENTS NEEDED TO ACCOMMODATE THE ADDITIONAL DENSITY, INCLUDING IN ROADWAY INFRASTRUCTURE IMPROVEMENTS, TRANSIT IMPROVEMENTS, AND ACTIVE PEDESTRIAN BICYCLE INFRASTRUCTURE IMPROVEMENTS.
I WILL JUST NOTE A A FEW OF THE, UH, FACTORS THAT MAKE THIS, UH, P UD SUPERIOR, INCLUDING AFFORDABLE HOUSING, A 1.5 ACRE SITE AT THE NORTHEAST CORNER OF THE PROPERTY.
UH, THIS WOULD IS ADJACENT TO A NEIGHBORHOOD PARK AND A SOUTH, AND THAT'S ON THE SOUTH OF OUR FRONTAGE AND ADJACENT TO A PLANNED TRANSIT STOP.
OTHER ITEMS INCLUDE, UM, THREE STAR AUSTIN GREEN BUILDING, AS WELL AS A NEW FIRE AND EMS STATION WITHIN A MIXED USED BUILDING, UH, THAT WOULD PROVIDE BETTER ACCESS TO THE GREEN BELT.
SPECIFICALLY, THIS WOULD BE NINE TO 11,000 SQUARE FEET OF, OF, UM, UNFINISHED SPACE.
UM, WITH REGARDS TO OPEN SPACE, THE PROJECT IS PROPOSING 11.6 ACRES OF OPEN SPACE AND 8.1 ACRES OF THAT IS ADJACENT TO THE GREEN BELT.
UM, I DO WANT TO TALK AND THERE ARE, UH, NUMEROUS CODE CODE MODIFICATIONS THAT ARE DETAILED ON PAGES NINE TO 14 OF THE STAFF REPORT AS WELL.
I I DO NEED TO MENTION THE RESTRICTIVE COVENANT AMENDMENT.
THAT IS ANOTHER, UH, THE SECOND OF THESE THREE CASES.
AND THAT IS TO TERMINATE THE MAXIMUM HEIGHT LIMITS AS IT PERTAINS TO FIVE OF THE TOTAL OF NINE TRACKS.
SO RIGHT NOW, THOSE, UM, HEIGHT LIMITS ON THE PROPERTY ARE FROM 35 TO 60 FEET.
AND THE REQUEST IS AGAIN, TO TERMINATE THE HEIGHT LIMITS SO THAT THE, UH, TALLER, DENSER MIXED USE DEVELOPMENT CAN OCCUR.
UH, WITH REGARDS TO THIS, UH, THIS, HOW THIS PROJECT HAS MOVED THROUGH THE DEVELOPMENT PROCESS, UH, THIS, IT, THE PROJECT WENT TO PARKS AND RECREATION BOARD IN SEPTEMBER.
UH, THE APPLICANTS AGREEABLE TO ALL FOUR OF THE PARKS RECOMMENDATIONS.
IT WENT TO ENVIRONMENTAL COMMISSION IN EARLY NOVEMBER, AND THE APPLICANTS AGREEABLE TO NINE OF THE 21 ENVIRONMENTAL COMMISSION RECOMMENDATIONS.
UH, THE ONLY OUTSTANDING ISSUE AT THIS TIME IS, UH, O ENERGY HAS REQUESTED THE APPLICANT DEDICATED 1.5 ACRE SITE FOR AN ABOVE GROUND SUBSTATION IN ORDER TO ADDRESS CAPACITY LIMITATIONS.
AND THE APPLICANT, UH, IS, HAS ADDRESSED THEIR COMMENT BY, UH, ALLOWING FOR MAJOR UTILITY FACILITIES AS A PERMITTED USE WITHIN THE LAND USE AREAS, BUT IS NOT AGREEING TO DEDICATING A SITE AT THIS TIME.
UH, THE STAFF RECOMMENDATION IS, UH, TO GRANT APPROVAL OF THE P U D AS OUTLINED IN THE LAND USE PLAN OR RESTRICTIVE COVENANT FOR THE TRAFFIC IMPACT ANALYSIS AND AN AMENDMENT OF THE, UH, COVENANT RESTRICTIVE COVENANT TO TERMINATE THE HEIGHT LIMITATIONS FOR THE TRACKS THAT ARE COVERED BY THE ZONING AREA.
AND, UH, NOW I WILL TURN IT OVER TO LESLIE, UH, AND SHE WILL DISCUSS THE ENVIRONMENTAL ISSUES OF THE P U D.
I'M LESLIE LILLY WITH WATERSHED PROTECTION, AND I AM SPEAKING ABOUT THE SOS SITE SPECIFIC AMENDMENT ASSOCIATED WITH THE, UH, BRODY OAKS POD.
AND THE REASON THAT THERE IS A SITE SPECIFIC SOS AMENDMENT IS BECAUSE THE SOS ORDINANCE, UH, RESTRICTS THE ABILITY TO MODIFY THAT SECTION OF CODE WITH THE PUD ORDINANCE.
AND THE PROJECT IS ALSO NOT, UH, DOES NOT MEET THE REQUIREMENTS FOR THE BARTON SPRING ZONE REDEVELOPMENT EXCEPTION.
SO THIS SOS SITE SPECIFIC AMENDMENT IS SPECIFICALLY FOR INCREASING THE IMPERVIOUS COVER LIMIT FOR THE PROJECT.
THE CURRENT IMPERVIOUS COVER ON THE SITE IS 84%, AND THE PROPOSED IMPERVIOUS COVER LIMIT IS 56% NET SITE AREA.
THIS, UH, SITE SPECIFIC AMENDMENT WILL ONLY APPLY TO THE BRO OAKS DEVELOPMENT POD PROJECT AS IT'S PROPOSED IN THIS PROJECT, AND IT REQUIRES A SUPER MAJORITY APPROVAL AT CITY COUNCIL.
UM, SO THE REQUIREMENTS THAT THIS PROJECT IS SUBJECT TO IN TERMS OF SOS, INCLUDE BOTH IMPERVIOUS COVER LIMITS, UH, THAT ARE WITHIN THE CONTRIBUTING AND RECHARGE ZONE OF THE EDWARDS AQUIFER, WHICH ARE 15 AND 20%.
THEY'RE DELINEATED WITHIN SOME OF THE BACKUP.
YOU CAN SEE SOME OF THE EXHIBITS.
AND THE, THE SITE IS ALSO SUBJECT TO, UH, NONDEGRADATION WATER QUALITY REQUIREMENTS
[00:25:01]
THAT THE PROPOSED PROJECT IS BRINGING THE SITE INTO COMPLIANCE WITH THAT, SUCH THAT RUNOFF IS GOING TO BE TREATED FROM ALL IMPERVIOUS COVERS TO MEET THE, UM, UNDEVELOPED CONDITIONS, MEANING THE CONDITIONS OF RUNOFF THAT WOULD EXIST ON THE SITE, UH, IF THERE WAS NO DEVELOPMENT AND NO IMPERVIOUS COVER THERE.SO THE BRINGING THE SITE INTO COMPLIANCE WITH THE NONDEGRADATION WATER QUALITY, UH, REQUIREMENTS OF THE SOS IS A REALLY IMPORTANT FEATURE OF THIS PROJECT.
UM, IN TERMS OF ENVIRONMENTAL CODE MODIFICATIONS THAT ARE BEING REQUESTED WITH THE POD, IT'S IMPORTANT TO TAKE THOSE TWO INTO ACCOUNT.
SINCE THIS, THE SOS UH, CODE AMENDMENT IS BEING REQUESTED IN A DIFFERENT ORDINANCE.
THE OTHER THREE ENVIRONMENTALLY SPECIFIC, UH, CODE MODIFICATIONS THAT ARE BEING REQUESTED ARE, UM, TO CUT FILL, UH, 25 8, 3 41 AND TWO TO HAVE CUT AND FILL, NOT TO EXCEED 14 FEET.
AND THEN ALSO, UH, CODE MODIFICATION TO 25 8 2 81, UH, ENCROACHMENT WITHIN THE C SETBACKS OF TWO CRITICAL ENVIRONMENTAL FEATURES THAT ARE ON THE SITE, WHICH INCLUDE A SEEP IN THE NORTH, UH, THE NORTHERN BORDER, AND THEN AIRMAN'S CAVE, UH, A CAVE FEATURE THAT IS UNDER, UH, THE SITE BY 140 FEET BELOW THE, UM, THE GRADE OF THE SITE.
SO THE STAFF RECOMMENDS THIS PROJECT, UH, THE WATERSHED STAFF PROVIDES, UH, SUPPORT FOR THIS PROJECT, UM, DUE TO THE FOLLOWING CONDITIONS, THAT THERE'S A REDUCTION OF IMPERVIOUS COVER FROM 84% TO 56%, THAT THERE'S A CLUSTERING OF IMPERVIOUS COVER ALONG THE ROAD, FRONTAGES AND AWAY FROM THE SENSITIVE BARTON CREEK GREEN BELT, THAT TWO TRACK, TWO ACRES OF THE TRACTOR RESTORE TO NATIVE NATIVE VEGETATION, A HUNDRED PERCENT OF WATER QUALITY CONTROLS OR GREEN STORM WATER INFRASTRUCTURE.
UH, 50% OF ALL LANDSCAPED AREAS WILL, UH, HAVE LANDSCAPE IRRIGATION PROVIDED BY RAINWATER.
THERE'S, UH, SUPERIOR TREE PROTECTIONS, EXCEEDING LANDSCAPE REQUIREMENTS AND COMPLYING WITH AUSTIN GREEN, BUILDING THREE STAR RATING AND ADDITIONAL, UH, THIRD PARTY, UH, CERTIFICATIONS.
AND, AND THAT CONCLUDES THE STAFF PRESENTATION.
WILL NOW PROCEED WITH THE PUBLIC HEARING.
WE'LL BEGIN WITH, UH, THE APPLICANT, MS. ABBY GAL FILLIN.
IS IT, ARE YOU GONNA ADVANCE OR JUST, UH, NOTE, UH, NEXT SLIDE, PLEASE.
UM, GOOD EVENING COMMISSIONERS.
I'M WITH LIONHEART PLACES, UH, REPRESENTING THE, UH, THE PROPERTY OWNER.
UM, SO, UH, THIS DEVELOPMENT IS LOCATED, UH, IF YOU CAN GO TO THE NEXT SLIDE.
UM, THE, IS THIS A, I THINK, IS THIS THE PRESENTATION? DID YOU REQUEST TO BEGIN AT SLIDE EIGHT? UH, NO.
IF YOU COULD START AT THE BEGINNING.
UH, SO THIS PROJECT, WE STARTED THE PROJECT, BEGAN THE PROJECT IN 2019, UM, UH, WORKING WITH THE APPLICANT THROUGH THE MASTER PLANNING PROCESS.
UM, WE HAVE, WE ARE ANTICIPATING, AS, AS WAS, UH, PRESENTED BY WENDY, WE'RE ANTICIPATING THAT WE WOULD NOT START CONSTRUCTION ON THIS AS A LARGE PROJECT UNTIL ABOUT 2025, UH, WITH THE FIRST PHASE, UH, NOT OPENING UNTIL 2027.
WE HAVE BEEN THROUGH PARKS BOARD ON SEPTEMBER 26TH.
UH, WE HAVE INITIATED, UH, THE, THE SOS SITE SPECIFIC SOS AMENDMENT.
WE'VE GONE TO CODES AND ORDINANCES COMMITTEE, UM, AND ENVIRONMENTAL COMMISSION.
WE'VE RE, WE'VE RECEIVED A RECOMMENDATION OF APPROVAL FROM ALL OF THOSE BOARDS.
UM, AND, UH, WE ARE PROPOSING TO MEET ALL CONDITIONS, UH, WITH THE EXCEPTION OF TWO, WHICH I'LL REVIEW LATER.
UH, WE HAVE REACHED OUT TO 20 PLUS ORGANIZATIONS, A HUNDRED PLUS HOURS.
UH, SOME OF THE, UH, OTHER THINGS THAT WE'VE DONE IN, IN ADDITION TO, TO SPEAKING WITH, UH, BOARDS OR ORGANIZATIONS, IS THAT WE HAD A WORKING GROUP ASSEMBLED BY COUNCIL MEMBER KITCHENS OFFICE, WHERE, UH, WE BROUGHT EVERYBODY TOGETHER TO MEET, UH, UH, THROUGH THAT WORKING GROUP.
THROUGHOUT THE PROCESS, WE'VE ALSO HAD A PRESENTATION OF THE TIA.
WE DID A HEIGHT DEMONSTRATION WITH CRANES ON SITE.
WE HAVE A PROJECT WEBSITE, UM, AND WE ALSO DID HIKES WITHIN THE GREEN BELT.
ONE OF THE THINGS I WANTED TO POINT OUT HERE IS THAT THE, UH, CORNER THERE, UH, IT WAS ONCE TEXT DOT RIGHT AWAY IS NOW PART OF THE PROJECT.
THAT'S WHERE THE MAJORITY OF THE PERVIOUS COVER, UM, ON THE SITE IS LOCATED CURRENTLY.
SO, UH, IT, THE SITE IS CURRENTLY 84% IN PERVIOUS COVER, UM, AND WE'RE PROPOSING TO BRING IT TO 56%.
MOST OF THE PERVIOUS COMES FROM THAT.
THE OTHER THING TO POINT OUT THERE IS SOUTH
[00:30:01]
LAMAR BOULEVARD AND LOOP 360 ARE BOTH TEXT DOT RIGHT AWAY IN THIS LOCATION.THERE ARE, UM, A LOT OF THINGS ABOUT THIS SITE THAT WE WANNA BRING INTO ALIGNMENT WITH THE CURRENT CITY OF AUSTIN, UH, INCLUDING LOTS OF, LOTS OF PARKING, LOTS, SURFACE PARKING LOTS, SINGLE USE RETAIL, AND THERE'S A LARGE WALL AGAINST THE BACK.
UH, THERE ARE SOME ASSETS ON THE SITE, A FEW ASSETS, UM, AND THOSE INCLUDE SOME REALLY NICE TREES THAT WERE PRIOR TO THE DEVELOPMENT IN 1980, UH, WHICH WILL BE PRESERVED.
AND THERE'S SOME REALLY NICE VIEWS THAT WILL NOW BE OPENED UP TO THE PUBLIC THROUGH, UH, PARKS, UH, PUBLICLY ACCESSIBLE PARKS.
THIS IS THE FIRST IMAGINE AUSTIN, UH, CENTER TO REDEVELOP AN ENVIRONMENTALLY SENSITIVE AREA.
SO IT'S, IT IS A CENTER IN THE IMAGINE AUSTIN PLAN.
IT IS ALSO LOCATED ALONG, UH, PROJECT CONNECT AND CORE TRANSIT, UH, CORRIDORS.
AND SO, UH, THIS DEVELOPMENT REALLY, UH, IS RESPONDING TO BOTH OF THOSE, UM, INITIATIVES OF THE CITY.
NEXT WE HAVE A, UH, SET OF GOALS THAT WE HAVE, UH, DEVELOPED AT THE BEGINNING OF THIS PROJECT AND HAVE BROUGHT ALL THE WAY THROUGH ONE OF THE TOP BEING ECOLOGY.
SO MEETING THE HIGHEST ENVIRONMENTAL AND ECOLOGICAL STANDARDS.
NEXT, THESE ARE THE MAJOR COMMUNITY BENEFITS ON SITE REDUCING IMPERVIOUS COVER BY 36%, TWO HUN.
UH, APPROXIMATELY 200 UNITS OF AFFORDABLE HOUSING, 11 ACRES OF PUBLIC PARKLAND, PRESERVATION OF A HUNDRED PERCENT OF THE HERITAGE TREES, AND 75% OF THE OTHER TREES WERE CAPTURING AND REUSING 100% OF THE RAINWATER.
AND, UH, THAT FALLS ON THE ROOFTOPS AND THEREBY OFFSETTING POTABLE WATER USE BY APPROXIMATELY 20 MILLION GALLONS PER YEAR, UH, REDUCING PARKING AND EMPLOYING A ROBUST TDM PROGRAM.
NEXT, THIS IS THE DEVELOPMENT PROGRAM, UM, 140,000 SQUARE FEET OF RETAIL, 1.2 MILLION SQUARE FEET OF OFFICE 1700 UNITS.
UM, SOME OF THE OTHER NOTABLE THINGS IS A COMMITMENT TO A LOCAL BUSINESS.
THERE'S A 25% COMMITMENT, UM, AS WELL AS, UH, A COMMITMENT TO RESERVE 10,000 SQUARE FEET FOR ARTISTS.
UH, NEXT, AND, UH, YOU CAN GO THROUGH THESE QUICKLY.
THESE ARE JUST, UH, SHOWING ALL OF THE CONDITIONS THAT CAME OUT OF THE DIFFERENT COMMISSION RECOMMENDATIONS.
UH, OUR TEAM IS, UH, UH, ACCEPTING ALL OF THOSE WITH THE EXCEPTION OF TWO FROM THE ENVIRONMENTAL COMMISSION, WHICH IS TO REDUCE HEIGHT, UM, AND, UH, MITIGATION, UH, WITHIN THE BARTON, UH, MITIGATION WITHIN THE BARTON CREEK WATERSHED.
AND YOU CAN GO THROUGH THESE QUICKLY.
THIS IS, UH, THAT'S THE CENTRAL GREEN THERE IN THE CENTER.
IT'S ABOUT THE SIZE OF REPUBLIC SQUARE.
THIS IS SOUTH LAMAR CORRIDOR, CORRIDOR.
NEXT, UM, THIS IS THE, THE, UH, CENTER CENTRAL DRIVE.
AND LASTLY, THIS IS THE DEVELOPMENT OVERALL.
SO YOU CAN SEE ONE OF THE THINGS THAT YOU CAN SEE HERE IS THAT, UH, THAT WALL COMES DOWN AND WE REALLY GRADE THE SITE, UH, UP INTO THE GREEN BELT.
WITH THAT, UM, I'LL SAY THAT OUR TEAM IS ALL HERE, UH, FOR QUESTIONS.
UH, WE HAVE OUR, UH, CIVIL ENGINEER, TRANSPORTATION ENGINEER, AND LAND USE ATTORNEY.
SO WE REALLY APPRECIATE EVERYBODY'S TIME AND THANK YOU.
WELL NOW HERE FROM MRS. JEAN WILKINS.
I'M MS. WILKINS HALL, UH, SPEAKER, BEGIN THE SPEAKERS IN OPPOSITION.
MS. WILKINS, YOU'LL HAVE FIVE MINUTES.
I WILL NOT TAKE UP THE ALL THAT MUCH TIME.
UM, THANK YOU FOR HAVING US HERE.
I REPRESENT BARTON VIEW NEIGHBORHOOD AND A COUPLE OF OTHER PEOPLE ARE HERE FROM THE NEIGHBORHOOD.
AND I BELIEVE Y'ALL RECEIVED A LETTER FROM THE NEIGHBORHOOD LAST WEEK, OR WHEN WE POSTPONED IT, ADDRESSING SOME OF THE CONCERNS.
I WAS EXTREMELY HAPPY TO HEAR THAT IT FLASHED UP THERE VERY QUICKLY.
BUT IT APPEARS THAT SOME OF THE CONCERNS THAT WE HAD THAT WERE ALSO SHARED BY THE, UM, ENVIRONMENTAL COMMISSION HAVE BEEN ADOPTED, UH, INCLUDING THE, UH, INTERNATIONAL DARK SKIES, WHICH I WAS PART OF THE ZOOM MEETINGS THAT WE HAD WITH THE DEVELOPERS.
AND THAT WAS SOMETHING THAT FROM THE VERY BEGINNING, I WAS REALLY PUSHING FOR THAT.
AND I BELIEVE ALSO THE NON-REFLECTIVE GLASS, AGAIN, THAT WAS, THAT WAS FLASHED UP THERE, UH, VERY QUICKLY.
UH, THE ENVIRONMENTAL COMMISSION, THE RECOMMENDATION INCLUDED THE HEIGHT REDUCTION USE OF INTERNATIONAL DARK SKIES FOR LIGHT POLLUTION AND BIRD STRIKE MITIGATION AND OTHER CONSIDERATIONS FOR BIRD FRIENDLY BUILDS, SUCH AS LOW REFLECTIVE, UH, GLASS.
PART OF THE BUILD AT 275 FEET IS JUST GONNA BE REALLY DIFFICULT TO MITIGATE WHEN IT'S THAT TALL.
[00:35:01]
SO MANY POSITIVES WITH THIS DEVELOPMENT.UM, THERE ARE NUMEROUS PROBLEMS THOUGH, INCLUDING ENVIRONMENTAL ISSUES, TRAFFIC, NEIGHBORHOOD COMPATIBILITY, ACCESSIBILITY TO THE SITE, UH, LIGHT POLLUTION STILL.
AND, UH, AGAIN, THE BURN STRIKES IN THE CANYON LIKE SETTING, EVEN THOUGH WE'RE GONNA MITIGATE FOR LIGHT.
AND WHAT I MEAN BY THAT IS OBVIOUSLY, I MEAN, THIS IS AN OLD DEVELOPMENT, YOU KNOW, I MEAN, AND NO, NOBODY IS GONNA ARGUE THAT WE NEED TO PRESERVE SOMETHING LIKE THAT, YOU KNOW, WITH ALL THAT PARKING.
SO IT'S GONNA GO ACROSS THE STREET WHERE TARGET IS, IT'S GONNA GO CENTRAL MARKET, PROBABLY AREA, YOU KNOW, EVENTUALLY IS GONNA GO.
BUT I THINK WE NEED TO BE VERY MINDFUL ABOUT THAT CANYON LIKE STRUCTURE THAT YOU CAN START PUTTING INTO PLACE FOR A NUMBER OF REASONS.
UH, HEAT, UM, AND, AND ALSO THE, THE, YOU KNOW, THE BIRD, UH, MEDICAL SITUATION OF, UM, THERE IS BIKE AND WALKING ACCESSIBILITY WITHIN THE BUILD, WHICH IS REALLY GREAT, BUT OUR NEIGHBORHOOD IS COMPLETELY INACCESSIBLE TO IT.
AND THE LETTER THAT Y'ALL RECEIVED, UM, OUR VICE CHAIR ACTUALLY WROTE THAT LETTER AND SHE GOES INTO GREAT DETAIL.
SO I WOULD JUST ASK THAT YOU READ OUR CONCERNS ABOUT OUR ACCESSIBILITY, UH, TO, TO THE SITE, WHICH WE VOICED WITH THE DEVELOPERS FROM THE, UH, VERY BEGINNING.
UM, ONE THING THAT I FOUND INTERESTING, UH, IT WAS NOT BROUGHT UP THIS EVENING, BUT, UH, IN OTHER MEETINGS THAT WE HAD, UH, IT WAS TALKING ABOUT THAT THIS BUILD WAS IN THE ACTIVITY CENTER FOR REDEVELOPMENT FOR ENVIRONMENTALLY SENSITIVE, UH, AREAS.
AND ACCORDING TO THE IMAGINE AUSTIN, IT CLEARLY LOOKS LIKE IT'S NEXT TO IT, NEAR IT, KIND OF ACROSS THE STREET FROM IT.
BUT THE GREEN CIRCLE IS NOT, I MEAN, FROM LOOKING AT THE IMAGINE AUSTIN, MATT, IT DOES NOT GO OVER IT.
AND ONE OF THE THINGS THAT I'M WONDERING IS, IS THAT PERHAPS BECAUSE AT THIS POINT THE RECOGNITION WHEN THIS WAS DEVELOPED WAS THAT IT WILL SIT ON TOP OF AIRMAN'S CAVE, WHICH IS VERY MUCH A CONCERN.
CAUSE ONE OF OUR NEIGHBORS WHO'S HERE THIS EVENING, UM, IS NOT SPEAKING.
SHE GAVE ME HER TIME, SO WE CAN LIKE SPEED THROUGH THIS.
UM, IS IS VERY, UH, INVOLVED IN THE SPLUNKING COMMUNITY AND HAS REAL CONCERNS, UH, ABOUT THE, THE CAVE.
UM, THE TRAFFIC, AND I'LL GO BACK TO THAT IN A SECOND.
THE TRAFFIC ANALYSIS RELIES VERY HEAVILY ON THE 8 0 3 BUS ROUTE, IS A MITIGATION, AND I UNDERSTAND THAT THAT IS GONNA BE, UH, IMPROVED.
BUT WE ARE VERY CONCERNED ABOUT THE, JUST THE TRAFFIC IMPACT IN OUR NEIGHBORHOOD IN, IN THAT AREA OF, OF SOUTH AUSTIN, UH, BARTON HILLS ZILKER.
AND IF THIS DEVELOPMENT CAN ACTUALLY BE SUPPORTED, UH, BY THE SOUTH LAMAR CORRIDOR, UM, WE STRONGLY FEEL THAT THE ISSUE OF THE SUBSTATION NEEDS TO BE DEALT WITH.
NOW, AUSTIN ENERGY WANTS IT ON SITE, BUT THE DEVELOPER PROPOSES PLACING IT AS FAR AWAY FROM BRODY LANE, UM, WHICH WAS BROUGHT UP AT THE ENVIRONMENTAL COMMITTEE, UM, THAT WOULD NECESSITATE HIGH VOLTAGE TRANSMISSION LINES OVER NEIGHBORHOODS, POSSIBLY OUR NEIGHBORHOOD, IF NOT OUR NEIGHBORHOOD, SOMEBODY'S NEIGHBORHOOD.
AND SO WE'RE CONS QUITE CONCERNED, EXTREMELY CONCERNED ABOUT THAT.
UM, AGAIN, AS I I MENTIONED, I'M KINDA SPEAKING FOR A COUPLE OF PEOPLE TO SPEED THINGS UP.
UM, THIS IS, UM, FROM INGRID MORTON, AND SHE'S EXTREMELY CONCERNED AND HAS SPENT A LOT OF TIME STUDYING THE MAP, UM, THAT AIRMAN'S CAVE.
UM, DEL R CLAY MIGHT NOT SUPPORT THE TWO, THE 275 FOOT STRUCTURE WITH 80 FOOT EVACUATION, I MEAN EXCAVATION TO GET DOWN THERE.
THANK YOU VERY MUCH FOR YOUR TIME.
ONE, I'LL HEAR FROM MR. PETER HESS.
MR. HESS, YOU'LL HAVE THREE MINUTES.
I'M WITH THE BARTON HILLS NEIGHBORHOOD ASSOCIATION.
UH, I YOU SAID THREE MINUTES, CORRECT? THREE MINUTES.
UM, I DON'T HAVE ENOUGH TIME TO COVER ALL THE POINTS.
LET ME JUST, UH, ESSENTIALLY TALK ABOUT THE ELEPHANT IN, IN THE ROOM, 275 FEET ON TOP OF THE BAR CREEK GREEN BELT.
THAT'S REALLY, THAT'S REALLY THE, THE BIG ISSUE I HAVE.
UH, UH, THERE'S A LOT TO LIKE, UH, ABOUT THIS PROJECT.
IT WAS, IF IT WAS AT, UH, AT MOPAC OR NO, IF IT'S AT, AT SOUTH HUT AND BEN WHITE, THAT'D BE A WONDERFUL PROJECT.
THIS LAND WAS ORIGINALLY SOLD IN THE EARLY NINETIES, EARLY EIGHTIES, AND THE
[00:40:01]
OWNERS KNOWING ABOUT THE SENSITIVITY OF THE, OF THE TRACT PUT A RESTRICTIVE COVENANT ON THE TRACT OF 35 FEET BECAUSE THEY WANTED TO PRESERVE, UM, UM, THE, THE, THE LANDSCAPE AND, AND THE, THE INTEGRITY OF THE GREEN BELT.WE ASKED THE CITY TO, UM, NOT TO APPLY THIS, THE VMU DESIGNATION ON THIS TRACK A DECADE AGO, AND THIS BODY APPROVED, AND THE CITY COUNCIL APPROVED THE IMAGINE AUSTIN COMPREHENSIVE PLAN LABELS THIS AREA AS AN ACTIVITY CENTER IN AN ENVIRONMENTAL SENSITIVE AREA.
UM, UH, I DON'T THINK I WAS PART OF THAT PROCESS, I DON'T THINK, UM, THAT WE THOUGHT OF A MINI DOWNTOWN, UH, OVER THE GREENBELT WHEN WE THOUGHT OF THAT DESIGNATION.
UM, WE THOUGHT OF A MUCH LOWER DENSITY DEVELOPMENT.
UM, THIS IS A USUALLY IMPORTANT TEST CASE.
IT'S THE FIRST OF SUCH, YOU KNOW, MINI CENTERS THAT'S GOING TO BE DEVELOPED.
IF YOU LET THIS GO, THEN, UH, THE APARTMENT COMPLEX NEXT DOOR IS GONNA GO AND BAR CREEK SQUARE IS GOING TO GO AND SO ON.
IT'S GONNA BE A, A, A, A LONG LIST OF, OF, OF TOWERS ON THE GREEN BELT.
UM, ANOTHER ISSUE WHY A 275 FOOT TOWER HOTEL? WHAT'S THE COMMUNITY BENEFIT OF A HOTEL ON THAT SITE THAT IS 2 75 FEET? LET ME, UH, ONE FINAL POINT, A PERSONAL POINT.
UM, I, UH, LISTENED DURING S I, UM, HEARINGS IN THE EARLY, UH, NINETIES.
I'LL LISTEN TO THE HEARINGS ON KG RADIO.
UM, AND DURING THOSE NIGHTS, I DECIDED TO BECOME A US CITIZEN.
I THOUGHT IT WAS A COOL COMMUNITY.
WE COULD PARTICIPATE THIS, A COMMUNITY WHO CARES ABOUT THE ENVIRONMENT, CARES ABOUT THE GREEN BELT, WHICH I'VE BEEN HIKING FOR 35 YEARS.
UM, IF WE NOW GIVE THIS AWAY, UH, WHAT CITY ARE WE, UM, ARE WE, ARE WE STILL CARING ABOUT OUR BASIC VALUES? ARE WE STILL CARING ABOUT THE GREEN BELT? UM, OR ARE WE GIVING AWAY A PRECIOUS RESOURCE WITHOUT GETTING, WITHOUT GETTING VERY MUCH IN RETURN? THANK YOU.
YOU'LL NOW HEAR FROM THE APPLICANT FOR A THREE MINUTE REBUTTAL.
SIGNED UP TO SPEED, BY THE WAY, AND I SIGNED UP REGISTRATION CLOSED AT FIVE O'CLOCK, AND I, UM, CHAIR AND I, UM, COMBED AFTER THAT TIME.
NO, I, I SIGNED UP AS SOON AS I GOT THE LINK AND FOR SOME REASON IT SHOWED ME, ONLY SIGNED UP FOR THE COMPATIBILITY ITEM.
MR. CHAIR, WE DON'T MIND IF THEY SPEAK.
UM, MR. RIVERA, COULD WE ALLOW TWO MINUTES PERHAPS FOR THE SPEAKER? OF COURSE.
WE'LL GIVE YOU TWO MINUTES IF YOU CAN.
UH, WE'VE GOT A PRETTY HEAVY AGENDA, SO I'M JUST TRYING TO KEEP THINGS GOING.
BUT, UH, GO AHEAD AND INTRODUCE YOURSELF AND, UH, WE'LL START THE CLOCK AND GIVE YOU TWO MINUTES.
BILL BCH, EXECUTIVE DIRECTOR, SAVE OUR SPRINGS ALLIANCE.
UH, I THINK YOU HAVE UNIQUE CIRCUMSTANCES HERE WITH THE SOS UH, AMENDMENT, WHICH WE SUPPORTED, UH, WITH PROPER CONDITIONS.
AND THE CONDITIONS INCLUDE BUYING MITIGATION LAND THAT WOULD REDUCE THE OVERALL IMPERVIOUS COVER.
IF YOU COMBINE THIS SITE WITH, UH, OFFSITE MITIGATION TO BELOW THE 15% SOS IMPERVIOUS COVER LIMIT, UM, I DON'T KNOW WHY STAFF IS RECOMMENDING AGAINST THAT.
UM, THIS CURRENT DEVELOPMENT IS 360,000 SQUARE FEET.
THE REQUEST IS TO GO TO 3.2 MILLION SQUARE FEET.
SO WE'RE TALKING ABOUT, UH, NOT A HUNDRED PERCENT OF PERVIOUS COVER OR DENSITY INCREASE, OR 500, BUT ALMOST A THOUSAND PERCENT INCREASE IN DENSITY.
UM, SOME SUBSTANTIAL AMOUNT IS ENOUGH, BUT WITH THE HEIGHT HERE, IT'S TOO MUCH.
STAFF IS ALSO RECOMMENDING AGAINST THE HEIGHT.
UM, THEY SAY THEY DON'T SUPPORT IT.
AND BECAUSE THE ENVIRONMENTAL COMMISSION REFERENCED THE CANYON EFFECT AND BIRD STRIKES THE REAL REASONS, AND THIS IS IN MY LETTER TO YOU THAT'S IN THE BACKUP, THAT WAS THROUGH THE ENVIRONMENTAL COMMISSION.
THIS VIOLATES THE CLIMATE EQUITY PLAN AND IT VIOLATES THE IMAGINE AUSTIN COMPREHENSIVE PLAN.
IT'S DOCUMENTED IN ATTACHMENT TO THE LETTER CITATIONS THROUGHOUT.
IMAGINE NEVER CONTEMPLATED SATELLITE DOWNTOWNS ANYWHERE IN AUSTIN, AND CERTAINLY NOT IN ACTIVITY CENTERS OVER THE EDWARDS AQUIFER.
UM, AND THE CLIMATE EQUITY PLAN CALLS FOR A CLIMATE EMERGENCY.
AND, UH, DESIGNING OUR, OUR BUILDING STRUCTURES TO FIT THAT SKYSCRAPERS ARE INCREDIBLY GREENHOUSE GAS EMISSION INTENSIVE.
UM, WE NEED MID-RISE DEVELOPMENT THAT,
[00:45:01]
UH, IS MUCH MORE CLIMATE FRIENDLY WHEN YOU LOOK AT THE OVERALL PICTURE.UM, AND, UH, IS ALSO HAPPENS TO BE CONSISTENT WITH, UH, UH, AUSTIN.
UH, IMAGINE AUSTIN, PLEASE LOOK AT THE HILL COUNTRY ROADWAY ORDINANCE ISSUES.
WE DIDN'T HAVE A CHANCE TO LOOK AT THOSE CAREFULLY.
WHERE ARE WE? WE HAVE TWO SPEAKERS THAT, I'M SORRY.
JUST, UH, POINT OF ORDER HERE.
UM, WERE YOU SIGNED UP? I'M JUST TRYING TO GIVE YOU I TRIED TO OKAY.
AND, AND DAVID JUST SAID HE REALLY THINKS Y'ALL NEED TO HEAR WHAT SIERRA CLUB HAS TO SAY.
I'M THE CONSERVATION CHAIR FOR THE AUSTIN REGIONAL GROUP, THIS SIERRA CLUB.
AND FIRST, WE APPRECIATE THE OUTREACH THAT HAS BEEN DONE ON THIS PROJECT AND THE, THE CONVERSATIONS AND ENGAGEMENT AND THAT IS APPRECIATED.
UM, SOS UH, ALLIANCE AND AUSTIN REGIONAL SIERRA BOTH HAVE SIGNED OFF ON THE, UH, REDUCTION OF THE IMPERVIOUS COVER AND THE VARIANCE TO THE SOS ORDINANCE.
THE PROBLEM IS, OUR UNDERSTANDING AT THAT TIME FOR SIERRA CLUB WAS THAT THERE WOULD BE MITIGATION LAND BOUGHT ELSEWHERE TO GO AHEAD AND MAKE UP THE DIFFERENCE.
AND THAT IS WHAT I THINK ENVIRONMENTALLY IS OUR MAIN HEARTBURN.
WE ARE CONCERNED ABOUT AIRMAN'S CAVE AND THAT IF DURING CONSTRUCTION THERE IS ANY KIND OF BREAKTHROUGH OR CRACK OR ANY KIND OF ENVIRONMENTAL, UH, RECHARGE FEATURE FOUND THAT CONSTRUCTION SHUT DOWN IMMEDIATELY, UH, UNTIL THAT CAN BE RESOLVED.
ALSO, WITH THE, THE LEVELING OF THE BACK, UH, WE'RE CONCERNED ABOUT RUNOFF FROM THE DEMOLITION.
UM, AND WE'RE GLAD THAT'S TAKING PLACE.
FIRST AND WATER QUALITY CONTROLS WILL BE PUT IN, BUT DURING THAT PROCESS, THERE'S ONLY ABOUT 15 FEET BEHIND THAT WALL THERE FOR THEM TO WORK.
WE WOULD WANT TO SEE A VARIANCE TO THE BCP, UH, TO ALLOW SILT, UH, CONTROLS, UH, INTO THE BCP, UH, TEMPORARY, BUT ALSO, BUT ALSO CRITICAL TO PROTECTING, UH, BARTON CREEK.
AND, AND, UM, WE WOULD LIKE TO SEE THAT.
WE'D HOPE THAT THE, THE DEVELOPER WOULD ASK FOR THAT ALSO.
BUT THE MAIN HEARTBURN FOR SIERRA CLUB IS THE, THE LACK OF OFFSITE MITIGATION.
YES, IT'S GOOD TO REDUCE THIS.
THERE ARE CONCERNS ABOUT THE HEIGHT AND THE EMBEDDED, UH, ENVIRONMENTAL IMPACT THAT THAT HAS.
UM, BUT AGAIN, IT IS, WE NEED THAT OFFSITE MITIGATION.
IT'S EXPENSIVE EVERYWHERE RIGHT NOW.
OKAY, CHAIR WILL PROCEED WITH THE APPLICANT REBUTTAL FOR THREE MINUTES.
MR. CHAIR, COMMISSION MEMBERS, MY NAME IS DAVID ARMREST REPRESENTING THE APPLICANT.
I'M GONNA SPEAK TO TWO ISSUES.
I COULD SPEAK TO ALL THE ISSUES, BUT I DON'T HAVE THAT MUCH TIME.
UH, FROM THE VERY FIRST DAY WE STARTED PLAYING THIS PROJECT, WE RECOGNIZED HOW SENSITIVE THIS SITE IS.
WE KNEW WE HAD TO COMPLY WITH SOS, WE KNEW WE HAD TO DO A GRAND JOB OF, UH, EVERYTHING ABOUT IT.
SO WE, WE NEEDED HEIGHT TO REDUCE THE IMPERVIOUS COVER, BALANCE IT OUT, COMPLY WITH SOS THE HEIGHT WE CONCENTRATED AT THE INTERSECTION OF 360 AND LAMAR A 275 TALL FOOT TALL BUILDING IS ROUGHLY 24 STORIES, AND I, I DON'T THINK I WOULD CONSIDER THAT HIGH RISE.
UH, THE HEIGHT STEPS DOWN FROM THERE.
WE INTENTIONALLY DID NOT CREATE A CANYON EFFECT.
UH, THE BIRD STRIKE IS AN ISSUE WITH RESPECT TO THE GLASS, WHERE WE, WE WILL ADDRESS THAT REALLY ANY HIGH RISE, ANY BUILDING OVER TWO STORIES PROBABLY HAS A BIRD STRIKE ISSUE IN THIS CITY.
BUT WE ARE, WE NEED THE HEIGHT TO MAKE THE ECONOMICS WORK TO MAKE THE COVER REDUCTION.
AND THEN WITH RESPECT TO THE MITIGATION LAND, WHEN WE STARTED THIS PROCESS, THERE IS AN ORDINANCE, THE BARTON SPRINGS, UH, ORDINANCE, THAT SOS ORDINANCE HAS ALREADY BEEN AMENDED ONCE FOR A BLANKET EXCEPTION CALLED THE BARTON SPRINGS REDEVELOPMENT EXCEPTION.
IT ALLOWS YOU TO KEEP THE SAME AMOUNT OF IMPERVIOUS COVER.
[00:50:01]
DO SOME SEDIMENTATION FILTRATION PONDS, AND THEN IT REQUIRES YOU TO BUY MITIGATION LAND OFF SITE.UH, ENVIRONMENTAL COMMITTEE SAID, DON'T DO THAT.
UH, POLITICALLY THAT LOOKS BAD.
IT'S JUST, WE DON'T LIKE THE ORDINANCE.
WE, IF YOU REALLY LIKE THIS PROJECT, YOU THINK THIS IS A GREAT PROJECT.
YOU NEED TO GO FORWARD AND CREATE A PROJECT WITH LOTS OF COMMUNITY BENEFITS AND AMEND THE SOS ORDINANCE FOR THIS PROJECT, WHICH IS WHAT WE'RE DOING.
UH, SO THAT'S THE PATH WE CAME DOWN.
WE ARE, WE ARE TREATING THE WATER TO SOS QUALITY.
WE WERE REDUCED IMPERVIOUS COVER.
THERE ARE MANY, MANY COM COMMUNITY BENEFITS.
AS ABBEY POINTED OUT, THE MITIGATION LAND IS PART OF THAT OTHER PROCESS THAT WE DID, NOT, WE, THAT'S WHERE WE WANTED TO BE, BUT, UH, WE'RE NOT THERE.
SO WE THINK IT'S NOT APPROPRIATE TO TAKE THAT PIECE FROM THERE AND PUT IT IN THIS PROCESS HERE WHEN WE NEED TO, UH, HAVE A THREE QUARTERS VOTE OF THE COUNCIL BECAUSE OF ALL THE THINGS WE'RE DOING.
THAT CONCLUDES THE SPEAKERS ON THIS ITEM.
UH, WE WILL, UM, STICK WITH OUR, JUST NEED TO GO CONCLUDE PUBLIC HEARING.
UH, COMMISSIONER ZAR SECOND BY VICE CHAIR HEMPLE.
UH, THAT'S ON THE DICE AND THOSE ON THE SCREEN.
UH, COMMISSIONER HOWARD, YOU SEE YOUR COLOR CARD? THANK YOU.
AND YEAH, WE'RE STILL AT NINE.
UH, LET'S GONNA START WITH QUESTIONS.
UM, YOU WANNA START US OFF? UH, VICE CHAIR? HE, YES, I HAVE A QUESTION.
I BELIEVE THIS WOULD BE FOR THE APPLICANT.
WE'RE HAVING A HARD TIME HEARING YOU.
UM, I THINK THIS IS A QUESTION FOR THE APPLICANT AND UM, MAYBE THE CITY AS WELL, BUT IT'S ABOUT IF, IF, IF THERE COULD BE A, A CLEAR EXPLANATION ABOUT THE OFFSITE MITIGATION.
LIKE IS THAT PURCHASING OF PROPERTY, HOW MUCH DOES IT HAVE TO BE WITHIN THE BARTON CREEK AREA? JUST MORE EXPLANATION AROUND THAT AND, AND WHY THAT SHOULD BE SEPARATED FROM THE, THE THREE CASES THAT WE'RE LOOKING AT TONIGHT.
HI, LESLIE LILLY WITH WATERSHED PROTECTION.
SO AS THE MITIGATION LAND OR THE MITIGATION FUNDS ARE REQUIRED, IT'S A PROCESS WITHIN THE BARTON SPRING ZONE REDEVELOPMENT EXCEPTION, WHERE A PROPERTY THAT IS GRANTED THE REDEVELOPMENT EXCEPTION HAS TO, UH, ACQUIRE LAND SUCH THAT THEY REDUCE THE OVERALL, UM, IMPERVIOUS COVER TO THE LIMITS THAT ARE SET FORTH IN THE BARTON SPRING ZONE.
SO IN THE RECHARGE ZONE, ACTUALLY, ACTUALLY, SORRY, IT'S ALL 20%.
IT HAS TO BE BELOW 20% FOR THE REDEVELOPMENT EXCEPTION.
AND FOR THIS PARTICULAR PROJECT, TO GET THIS PROJECT TO 20% IMPERVIOUS COVER, IT WOULD BE 64 ACRES OF LAND ACQUIRED TO GET IT DOWN TO THE 20%, UM, IMPERVIOUS COVER LIMIT AS IT'S DICTATED IN THE REDEVELOPMENT EXCEPTION.
DOES THAT ANSWER YOUR QUESTION? UM, THIS IS LIZ JOHNSTON, DEPUTY ENVIRONMENT OFFICER WITH WATERSHED.
ALSO, THE REDEVELOPMENT EXCEPTION IS SOMETHING THAT IS ASSOCIATED WITH SITE PLANS.
THE CODE SET HAS TO BE WITH A SITE PLAN, SO IT'S A LITTLE BIT ODD TO HAVE IT WITH A PUT, AND SO PREVIOUS STAFF SAID THAT, YOU KNOW, IT'S TOO LOW OF A BAR.
SO WE, WE WERE SAYING, YOU KNOW, THAT IS NOT THE BASELINE FOR BY WHICH STAFF DETERMINE WHETHER OR NOT THIS PROJECT IS SUPERIOR BECAUSE IT'S, IT'S TOO LOW A BAR, THE WATER QUALITY TREATMENT, IT IS AS ISN'T AS GOOD REDUCTION OF IMPERIOUS COVER IS NOT REQUIRED, UM, ET CETERA, ET CETERA.
HOWEVER, IT IS A PROCESS THAT IS OUTLINED IN THE CODE.
AND SO I THINK THAT THAT'S WHERE THIS REQUEST IS COMING FROM, FROM THE COMMUNITY AND THE, THE 64 ACRES THAT WOULD NEED TO BE PURCHASED, IS THAT ANYWHERE IN, IN AUSTIN OR WITHIN THE BARTON CREEK WATERSHED? IT WOULD BE SOMEWHERE WITHIN THE BARTON SPRING ZONE.
AND IS THERE THAT MUCH LAND AVAILABLE FOR PURCHASE? UM,
[00:55:01]
I, I CAN'T ANSWER THAT NECESSARILY.ONE OF THE OTHER CONDITIONS, UM, OF THE BARTON SPRING ZONE REDEVELOPMENT EXCEPTION, SO THERE'S TWO OPTIONS.
THERE'S PURCHASING LAND OR PAYING INTO A MITIGATION FUND.
SO THOSE ARE TWO DIFFERENT OPTIONS.
THE FUND GOES TO WATERSHED PROTECTION TO BUY LAND AS WELL.
THERE ARE CONDITIONS ASSOCIATED WITH THE MITIGATION LAND PURCHASE THERE, THERE'S A MINIMUM, UM, REQUIREMENT OF A HUNDRED ACRES UNLESS IT IS ADJACENT TO EXISTING MITIGATION LAND AS WELL.
SO IT, YOU KNOW, FOR IF, IF THIS WERE REDEVELOPMENT EXCEPTION, WE WOULD SAY IT NEEDED TO BE, YOU KNOW, EITHER ADJACENT TO MITIGATION LAND A MINIMUM OF, OR A MINIMUM OF A HUNDRED ACRES SOMEWHERE, OR PAY INTO THE FUND.
YOU COULD DO SOMETHING ELSE, BUT OUR PREFERENCE IS USUALLY LARGER TRACKS OF LAND, NOT, UM, NOT TRACKS OF LAND UNDER A HUNDRED ACRES.
AND COMMISSIONERS, ANY OTHER QUESTIONS? UH, COMMISSIONER ZAR? COMMISSIONER? OH, COMMISSIONER YTO.
I'LL COMMISSION DETO, GO AHEAD AND YOU GOT, YOU HAVE THE NEXT QUESTION.
I HAVE A FOLLOW UP TO VICE CHAIR, HE'S QUESTION, BUT, UM, WANTED TO SEE IF MR. BUNCH FROM SOS HAD A, A RESPONSE TO THAT OR MR. WILEY FROM SIERRA CLUB, IF EITHER OF YOU COULD COMMENT ON LAND AVAILABILITY AND THE FEASIBILITY OF BUYING MITIGATION LAND FOR A SITE LIKE THIS.
UH, THANK YOU COMMISSIONER BILL BUNCH.
YEAH, THERE'S, UH, TENS OF THOUSANDS OF ACRES IN THE UPPER BARTON CREEK WATERSHED THAT ARE STILL UNDEVELOPED, UM, AND, UH, ARE UP FOR GRABS TO BE PROTECTED OR DEVELOPED.
AND, UM, BUYING LAND IS ONE OPTION.
THE OTHER OPTION IS BUYING A CONSERVATION EASEMENT.
UM, AND THERE'S CERTAINLY LANDOWNERS OUT THERE THAT I THINK WOULD BE, UH, VERY OPEN TO EITHER ONE OF THOSE APPROACHES.
UM, AND I'M, YOU'VE GOT AUDIO FOR ME, SORRY, JUST DOUBLE CHECK.
UM, I HAVE A LOT OF QUESTIONS.
I WOULD LIKE TO KNOW, UH, WE HAVE LEGAL AVAILABLE.
WHAT IS THE STATUS OF THE MEMORANDUM OF UNDERSTANDING THAT THE APPLICANT AND BCP HAVE ASKED YOU FOR CHAIR COMMISSION? AVERA? UM, I DON'T BELIEVE THAT'S A LEGAL MATTER.
UH, STAFF WILL BE AVAILABLE TO, UM, DISCUSS THAT.
I WAS TOLD IT WAS HUNG UP WITH LEGAL.
UH, LIZ JOHNSTON WATERSHED AGAIN, UM, I HAVE HEARD THAT THE PAPERWORK HAS BEEN SENT TO LEGAL AND SO IT SHOULD BE A MATTER OF, UM, A MONTH OR TWO BEFORE IT'S, UM, TAKEN CARE OF.
CAN JUST FOR, UH, THE REST OF THE COMMISSION, CAN WE, WHAT IS IT WE'RE SPEAKING OF, OF THIS DOCUMENT? THERE IS A REQUEST FROM, UM, SCIENCE, UH, HYDROLOGY SCIENCE STAFF, UM, WITH THE BCP TO HAVE ACCESS TO AIRMAN'S CAVE IN PERPETUITY SO THAT THEY CAN HAVE AN ACCESS EASEMENT IN ORDER TO DO SCIENTIFIC EXPERIMENTS AND RESEARCH ASSOCIATED WITH THE CAVE.
AND SO THIS WOULD BE AN EASEMENT, UM, GRANTED TO STAFF TO, UM, ACCESS THE CAVE.
YEAH, I THINK, UM, SIERRA CLUB ALLUDED TO THIS A BIT THAT, UM, IN GENERAL THE THOUGHT IS THAT AIRMAN'S CAVE IS, IS, UM, NOT ENDANGERED BY THIS PROJECT, BUT THAT IS IN THEORY.
SO THERE ARE TWO THINGS AT PLAY.
ONE IS BCPS MISSION TO ACQUIRE EASEMENTS TO BE ABLE TO MONITOR AREAS THAT ARE AT RISK.
AND THIS IS ONE OF THOSE AREAS.
AND SO THE MEMORANDUM OF UNDERSTANDING AND THE APPLICANT IS AMENABLE TO THIS, UM, IS, UH, IS AN AGREEMENT BETWEEN THOSE TWO TO ALLOW ACCESS FOR BCP STAFF TO BE ABLE TO GO IN AND ASSESS.
THE OTHER PART COMES FROM ONGOING SURVEILLANCE OF AIRMAN'S CAVE, AND THAT WAS SOMETHING THAT SIERRA CLUB ALLUDED TO THAT, UH, IF THERE WAS, IF IT WAS DETERMINED THAT THERE ACTUALLY WAS AN INFRACTION OR ENDANGERMENT DURING CONSTRUCTION, THAT THERE WOULD BE A PROCESS IN PLACE
[01:00:01]
FOR OVERSEEING THIS.AND NONE OF THIS HAS BEEN COMPLETED AND NONE OF IT IS READY FOR US OR THE APPLICANT WHO IS AGREEABLE TO IT.
UM, IF MR. ARMREST WANTS TO COMMENT ON THAT, I'M, I'M HAPPY TO ALLOW THAT.
WE ARE AGREEABLE AND, UH, I'VE BEEN DEALING WITH NICO HOWARD AND UH, HE SENT ME SOME SAMPLE AGREEMENTS.
I DRAFTED A, AN AGREEMENT PROBABLY A MONTH AGO, SIX WEEKS AGO, AND SENT IT TO HIM AND HE WAS GONNA FORWARD CITY LEGAL.
BUT I THINK, UH, IN CONCEPT WE'RE IN TOTAL AGREEMENT.
I, I JUST HAVEN'T HAD ANY FEEDBACK FROM THE, THE WORDING THAT I DRAFTED, BUT IT IS TO MONITOR THE CAVE ON AN ONGOING BASIS.
UM, I WAS GONNA ASK A QUESTION OF, OF STAFF ON THE PROJECT.
IN THE OPENING SUMMARY PRESENTATION, THEY SAID THAT SOME OF THE ITEMS MEET SUPERIORITY, BUT NOT ALL.
SO I'M CONFUSED ON HOW WE GOT TO A SUPERIOR FOR THAT STAFF IS RECOMMENDING THIS GOES SUPERIOR IF WE HAVE NOT MET ALL OF THE ITEMS OF SUPERIORITY.
I DON'T UNDERSTAND THAT, UH, WENDY RHODES HOUSING AND PLANNING, UH, WE'RE, WE'RE BASING SUPERIORITY ON, ON AN OVERALL AND NOT WHETHER THEY, EVERY ITEM IS, IS SUPERIOR.
SO WE HAD, IF I, IF I HEARD CORRECTLY, YOU SAID THERE WERE 43 MODIFICATIONS THAT WERE MADE FOR THIS PUD YES.
AND SO, AND THAT ALSO INCLUDED BASICALLY WAIVING AND GUTTING THE HILL COUNTRY ORDINANCE, WHICH WAS DESIGNED TO PROTECT ENVIRONMENT AND ENSURE SOME OF THE CLIMATE EQUITY GOALS? UH, YES, THERE WAS ONE TO, UH, HILL COUNTRY ROADWAY ONE MODIFICATION.
I THINK THAT'S ALL MY QUESTIONS AT THIS TIME.
SO YEAH, ACTUALLY THAT'S FINE CUZ I ACTUALLY HAVE ANOTHER QUESTION FOR THE APPLICANT AS WELL.
SO I'LL, WELL, COMMISSIONER
UM, THERE WAS A, ON THE SLIDE DECK, THERE WAS A SLIDE OF THE ORGANIZATIONAL, UH, THE PRESENTATIONS THAT WERE DONE WITH COMMUNITY ENGAGEMENT AND LISTED OUT THE COMMUNITY ORGANIZATIONS THAT THEY HAD PRESENTED TO.
AND SO, UH, SO FAR I'M, I'M SEEING, UM, ONLY THREE ORGANIZATIONS COME OUT, UH, FROM THAT SAYING THAT, UM, THEY HAVE COMMENTS ON IT AND NONE OF THEM ARE IN FULL AGREEMENT WITH THE PUD.
SO DO WE HAVE ANY ORGANIZATIONS THAT ARE AGREEMENT WITH SUPERIORITY OF THIS PUT AT THIS TIME? UH, JUST REAL QUICK.
UM, AND WE MAY ALLOW MORE TIME LATER, COMMISSIONER MUSH TOLER, BUT FOR NOW THIS ONE WHO WOULD ANSWER THAT STAFF, UM, WHOEVER'S BEST SUITED TO ANSWER THE QUESTION, THEN WE'LL GO AHEAD AND, UH, TURN OVER TO ANOTHER COMMISSIONER FOR QUESTIONS AND WE CAN COME BACK IF YOU HAVE MORE.
UH, THE ORGANIZATIONS THAT I DID RECEIVE POSITIVE COMMENTS FROM WERE, UH, AUSTIN PARKS FOUNDATION AND THE HILL COUNTRY CONSERVANCY.
UH, WE MAY OPEN IT UP IF THERE'S CONTINUED INTEREST IN QUESTIONS, WE CAN EXTEND A FEW ABOUT WHO'S NEXT.
COMMISSIONERS COMMISSIONER ANDERSON.
I RECEIVED A COUPLE QUESTIONS ABOUT AFFORDABLE HOUSING AND I DO SEE MR. MONROE BACK THERE.
I'M CURIOUS IF I CAN ASK HIM OR, OR THE APPLICANT QUESTION.
BUT, UM, WE'VE BEEN ASKED HOW THIS MIGHT WORK WITH AFFORDABLE HOUSING AND I WAS JUST CURIOUS IF YOU CAN MAYBE SHARE YOUR THOUGHTS ON HOW YOU SEE THIS WORKING OUT FOR FOUNDATION COMMUNITIES EVENING.
I'M WALTER MORROW, THE DIRECTOR OF FOUNDATION COMMUNITIES.
UH, WE'RE SUPER EXCITED ABOUT THIS LOCATION.
WE'VE BEEN IN CONVERSATION WITH, UH, APPLICANT, UM, TO, TO BUILD A PURPOSE BUILT AFFORDABLE FAMILY COMMUNITY.
UH, WE'RE LOOKING AT A HUNDRED TO 130 UNITS, AT LEAST A HUNDRED UNITS.
UM, OUR FOCUS IS TO WORK ON TWO AND THREE BEDROOMS, SO REALLY WANT TO COUNT BEDROOMS, NOT UNITS.
UM, IT'S RARE TO FIND THE SITES THAT ARE LARGE ENOUGH THAT CAN MAKE THIS WORK, ESPECIALLY IN A CENTRAL LOCATION LIKE THIS.
UM, I BELIEVE THE MECHANICS WOULD BE, THE PUT APPROVAL WOULD BE PREDICATED ON THE DEVELOPER DELIVERING ONSITE AFFORDABLE HOUSING.
AND THEN WE ARE LOOKING FORWARD TO HAVING A, A, A WRITTEN MOU WITH A DEVELOPER TEAM, UM, TO
[01:05:01]
BE THEIR CHOSEN DEVELOPER TO WORK ON ON THE SITE.UM, ARE THERE ANY AUSTIN WATER PLANTS DOWNSTREAM FROM THIS SITE THAT'S COME UP A FEW TIMES? UH, JUST CURIOUS ABOUT THAT AND, AND IF SO AND IF NOT, UM, AND MAYBE THIS IS MAYBE FOR WATERSHED.
UM, COULD YOU SHARE MAYBE WHAT YOU EXPECT TO SEE THE DIFFERENCE BETWEEN THE WATER FLOWING OFF THIS SITE TODAY UNDER CURRENT CONDITIONS VERSUS AFTER REDEVELOPMENT? OKAY.
I, I, I, I DO NOT KNOW, UM, THE NEAREST WATER PLANTS.
UM, AND I THINK THE SECOND QUESTION IS, UH, WATERSHED IS, UH, STAFF IS APPROACHING HI LESLIE LILLY WITH WATERSHED PROTECTION.
UH, THERE ARE NO, UH, WATER TREATMENT FACILITIES DOWNSTREAM FROM THIS SITE.
AND IN TERMS OF THE WATER QUALITY, UM, FLOWING OFF THE SITE, THE, UM, WATER QUALITY CONTROLS THAT EXIST TODAY HAVE ALMOST NO TREATMENT OF THE WATER THAT IS FLOWING OFF THE IMPERVIOUS COVER, UH, INTO THE BARTON CREEK GREEN BELT.
AND ONE OF THE CONDITIONS OF APPROVAL OF THE BLOOD STAFF CONDITIONS WAS, UM, COMPLIANCE WITH THE SOS, UH, NONDEGRADATION WATER QUALITY REQUIREMENTS THAT WOULD REQUIRE THE WATER QUALITY, UH, INFRASTRUCTURE ON SITE TO TREAT THE WATER FLOWING OFF IMPERVIOUS SURFACES SUCH THAT IT DOES NOT INCREASE POLLUTION AND SEDIMENTATION FROM THE UNDEVELOPED CONDITION.
AND THAT CONDITION IS THE CONDITION WHEN THERE'S NO DEVELOPMENT, NO IMPERVIOUS COVER.
SO THE EXPECTATION OF THE DEVELOPED PROJECT AS PROPOSED IN THE POD WOULD HAVE WATER QUALITY THAT IS EQUAL TO THAT OF THE UNDEVELOPED CONDITION.
SO I WENT TO THIS SITE THIS PAST WEEKEND AND I NOTICED IT ALMOST LOOKED LIKE SOMEBODY JUST DUMPED OIL OUT ON THE PARKING LOT.
I MEAN, THERE WAS JUST A TON OF OIL IN THIS MONSTERS PARKING LOT.
SO WHAT OCCURS TO THAT WATER, TO THAT OIL TODAY? AND, YOU KNOW, THERE'LL BE PARKING GARAGE THERE IN THE FUTURE IF THERE WAS A SIMILAR SITUATION WITH OIL IN THE PARKING GARAGE.
SO, UM, UH, CURRENT TODAY THERE IS, UM, LOADING OF, YOU KNOW, BACTERIA AND POLLUTANTS THAT WE HAVE CRITERIA FOR UNDERSTANDING EXACTLY HOW MUCH IMPERVIOUS COVER RESULTS IN HOW MUCH POLLUTION PER, YOU KNOW, INCH OF WATER THAT FLOWS ACROSS THE IMPERVIOUS