[00:00:05]
AFTERNOON, EVERYBODY.[CALL TO ORDER]
1ST MOBILITY COMMITTEE MEETING, AND WE'RE GONNA CALL IT TO ORDER AT 1:03 PM.WE ARE HOSTING THE MEETING HERE IN CITY HALL CITY COUNCIL CHAMBERS.
WE HAVE ALL FOUR MEMBERS OF THE COMMITTEE PRESENT ON THE DAIS.
[Public Communication: General]
WILL START WITH PUBLIC COMMUNICATION.I BELIEVE THERE ARE ONLY THREE SPEAKERS.
YES, CHAIRWOMAN, THERE'S THREE SPEAKERS.
KATIE KAM, ADAM GREENFIELD, AND ANDREW CLEMENTS.
HI, I'M KATIE KAN SPEAKING IN OPPOSITION OF THE CURRENT PROPOSED DESIGN OF EAST 51ST STREET BY MUELLER BECAUSE IT DOES NOT COMPLY WITH THE AUSTIN MOBILITY PLAN BEST PRACTICES FOR THE SAFE SYSTEMS VISION ZERO DESIGN APPROACH OR THE VISION FOR CREATING A PEDESTRIAN ORIENTED CORRIDOR THAT BRINGS MUELLER AND WINDSOR PARK TOGETHER.
THE CITY'S PLAN FOR EAST 51ST STREET IS EXTREMELY DISAPPOINTING, AND THE DESIGN NEEDS TO CHANGE TO CREATE A BETTER, SAFER, MULTIMODAL STREET.
FOR BACKGROUND, I HAVE A MASTER'S AND PHD IN CIVIL ENGINEERING SPECIALIZING IN TRANSPORTATION AND ABOUT 30 YEARS OF EXPERIENCE IN PLANNING AND ENGINEERING, INCLUDING OVERSEEING ROADWAY, ROUNDABOUT AND TRAFFIC ANALYSIS PROJECTS.
FIRST, I WANT TO HIGHLIGHT THE FAILURES IN THE PROCESS.
DESPITE THE MUELLER NEIGHBORHOOD ASSOCIATION AND MUELLER PIAC REQUESTING AN OPPORTUNITY TO REVIEW THE DESIGN LAST YEAR BEFORE IT MADE IT TO 90%, THE TRANSPORTATION AND PUBLIC WORK STAFF REFUSED TO GO TO THE MUELLER PIAC OR NEIGHBOR ASSOCIATION TO PROVIDE AN UPDATE.
CITY STAFF PUSHED THROUGH THE 90% DESIGN DESPITE REQUESTS BY THE PUBLIC TO HAVE A SAY.
CITY STAFF PRESENTED 90% TO THE PUBLIC IN JUNE OF THIS YEAR AS INFORMATIONAL ONLY.
HERE'S WHAT IS WRONG WITH THE CITY'S PROPOSED REDESIGN.
IT CONTINUES BUSINESS AS USUAL FOR THE CORRIDOR.
TWO CAR LANES IN EACH DIRECTION SIGNALIZED INTERSECTIONS.
CRASHES AND SPEEDING OCCUR ALONG THIS ROAD AND IS NOT A PLEASANT PLACE TO WALK ALONG.
THE CURRENT PROPOSED ROADWAY DESIGN IS OUTDATED AND NOT COMPLIANCE WITH AUSTIN'S STRATEGIC MOBILITY PLAN, WHICH SEEKS TO INCREASE MODE SPLIT OF NON-CAR MODES TO 50% AND INTEGRATE MOBILITY MODES LIKE LOW SPEED ELECTRIC VEHICLES, WHICH IS ENCOURAGED ON PAGE 136 OF THE AUSTIN STRATEGIC MOBILITY PLAN.
THE ONLY CHANGE IS TO PROVIDE WIDER FACILITIES FOR WALKING AND BIKING TO PROHIBIT LEFT TURNS ALONG SOME PARTS OF THE CORRIDOR.
ADDITIONALLY, THE DESIGN WOULD REMOVE ESTABLISHED SHADE TREES THAT PROVIDE CONTINUOUS SHADE AND MUCH NEED RELIEF FROM THE HOT SUN.
THIS IS A PROJECT THAT WILL COST MILLIONS AND BE IN PLACE FOR DECADES.
WE HAVE TO GET THIS PROJECT RIGHT AND NOT RUSH INTO A POOR DESIGN.
HERE'S WHAT NEEDS TO CHANGE ABOUT THE EAST 51ST STREET REDESIGN.
ALL INTERSECTIONS SHOULD BE ONE LANE ROUNDABOUTS, NO EXCUSES.
ROUNDABOUTS SIGNIFICANTLY REDUCE CRASHES, INJURIES AND FATALITIES, SIGNIFICANTLY REDUCE ROADWAY OPERATIONS, MAINTENANCE, AND EMERGENCY RESPONSE COSTS, PROVIDE TRAFFIC CALMING, AND PROVIDE A SAFER ENVIRONMENT.
THEY'RE IDEAL FOR THIS CORRIDOR BECAUSE OF THE VISION FOR THIS CORRIDOR.
THE PREVIOUS TRAFFIC MODELING LOOKED AT TWO LANE ROUNDABOUTS, THAT IS NOT THE APPROPRIATE SIZE.
WHEN IT COMES TO TRAFFIC MODELING, THE POINT IS TO DETERMINE HOW TO GET TO THE VISION, NOT TO SUCCUMB TO DECADES OLD THINKING THAT WE MUST KEEP ACCOMMODATING AN UNSTOPPED GROWTH AND CONVENTIONAL CAR TRAVEL.
ADDITIONALLY, MORE PEOPLE, INCLUDING MYSELF AND OTHER RESIDENTS OF MUELLER AND ADJACENT NEIGHBORHOODS ARE USING LOW SPEED ELECTRIC VEHICLES, GOLF CARTS, AND E-TRUCKS TO GET AROUND.
THE REVISED EAST 51ST STREET CROSS SECTION SHOULD HAVE ONE CONVENTIONAL LANE IN EACH DIRECTION, SEPARATE OFF-STREET PATHS FOR BIKES AND LOW-SPEED VEHICLES AND WIDE SIDEWALKS WHILE ALSO MAINTAINING THE EXISTING SHADE TREES.
WHEN LOOKING AT THE COST OF REDESIGN, THOSE ARE QUICKLY RECOVERED BY DESIGNING A ROADWAY THAT'S SAFER AND MORE EFFICIENT.
THE GENTLEMEN ARE DEBATING WHO'S GONNA GO NEXT.
UH, ADAM GREENFIELD, SAFE STREET, NICE TO SEE YOU ALL COUNCIL MEMBERS.
UM, ALSO SPEAKING ABOUT 51ST STREET BETWEEN CAMERON AND BIRKMAN.
UM, UH, WE STRONGLY, UH, THANK, UH, STAFF FOR ALL THE WORK THAT'S BEEN DONE ON THIS PROJECT.
THIS IS A REALLY CRITICAL AREA OF TOWN AND IF DONE RIGHT, COULD REALLY HELP STITCH THESE COMMUNITIES TOGETHER, UM, IN A WAY THAT THE CURRENT, UH, ROADWAY CONFIGURATION DOES NOT.
UH, THE QUESTION REALLY WE THINK IS WHAT ARE WE SOLVING FOR? AND IN THE 2012 EAST 51ST STREET VISION PLAN, THE COMMUNITY WAS VERY CLEAR THAT THEY WOULD LIKE A MAIN STREET HERE.
UM, WHAT WE, WHAT WE'RE SEEING IN THE CURRENT DESIGNS IS MORE OF A HIGHWAY CONFIGURATION WITH, UH, YOU KNOW, FOUR LANES, UM, CERTAINLY AN IMPROVEMENT OVER WHAT WE
[00:05:01]
HAVE TODAY.UM, BUT WE DO THINK THAT WE, UH, NEED MORE TIME TO GET THIS RIGHT.
UH, EVEN WITH THE FOUR LANE CONFIGURATION WITH, UM, A MEDIAN AND, UH, IMPROVED BIKE LANES AND OTHER IMPROVEMENTS, WE STILL THINK THAT THIS ISN'T GONNA BE A PLACE THAT REALLY THE COMMUNITY WOULD EMBRACE AS MUCH AS THEY COULD.
UM, AND WE ARE SEEING A LOT OF SUPPORT FOR A MAIN STREET VISION.
IN FACT, SAFE STREETS AUSTIN HAS RECENTLY COLLECTED SUPPORT FROM ABOUT 20 LOCAL BUSINESSES AND ORGANIZATIONS FOR, UH, KIND OF A SLOWER, NARROWER, CALMER, MORE MAIN STREET, UH, APPROACH.
THIS HAS BEEN DONE BEFORE, OF COURSE.
BARTON SPRINGS ROAD, UM, YOU KNOW, SIMILAR TRAFFIC LEVELS.
WE CAN, YOU KNOW, PERHAPS SAY, "WELL, THIS IS DIFFERENT," BUT BARTON SPRINGS ROAD WAS, WAS MOVING THE NEEDLE FORWARD SIGNIFICANTLY.
CAMERON DESAR WAS MOVING THE NEEDLE FORWARD SIGNIFICANTLY.
UH, WE THINK THAT THIS WOULDN'T BE MOVING THE NEEDLE MORE, ANY MORE FORWARD THAN THOSE PROJECTS.
AND, AND WE WOULD REALLY BE HAVING A WONDERFUL OUTCOME AT THE END THAT WOULD, THE COMMUNITY WOULD REALLY EMBRACE.
SO, UM, EVEN IF IT TAKES LONGER TO, TO GET A GOOD DESIGN FOR 51ST STREET, THE COMMUNITY COULD BE WITH THIS, BUT THIS COULD BE WITH THE COMMUNITY FOR 80 YEARS, A CENTURY, UH, A CENTURY OF, OF, UH, IMPROVED SAFETY, UH, ECONOMIC DEVELOPMENT.
THIS IS, WE GOTTA THINK LONG-TERM HERE.
SO THANK YOU VERY MUCH AND LOOKING FORWARD TO THE DISCUSSION TODAY.
UM, I'M ACTUALLY COMMISSIONER, UM, COUNCIL MEMBER KADRI'S WRONG, WRONG ROOM, UH, APPOINTEE TO THE MUELLER COMMISSION.
UM, AND I AM PROBABLY THE MAIN VOICE THAT WAS ASKING FOR UPDATES FOR THE EAST 51ST PROJECT FOR PROBABLY A YEAR OR TWO AND NOT BEING RESPONDED TO UNTIL A PRESENTATION IN FEBRUARY THAT DIDN'T PRESENT THE DESIGN AND THE 90% DESIGN FINALLY BEING PRESENTED AT A JUNE 14TH PUBLIC HEARING.
UM, BUT EAST 51ST STREET BETWEEN I-35 AND BERKMAN, THIS PROJECT AREA IS A STRODE, UM, BOTH A STREET AND A ROAD NOT DOING EITHER PARTICULARLY WELL, BUT MAINLY A ROAD EMPHASIZING TRAFFIC THROUGH, THROUGHPUT AND MANEUVERABILITY.
THE 90% DESIGN THAT HAS BEEN PRESENTED SHOWS THIS REMAINING A STRODE WITH SOME NICE NEW FLOURISHES AND NODS TO OTHER MOBILITY NEEDS.
THE VISION OF THE PROJECT TO CALM TRAFFIC AND BRING TOGETHER THE WINDSOR PARK AND MUELLER NEIGHBORHOODS, OF WHICH I'M THE CHAIR OF THE NEIGHBORHOOD ASSOCIATION, ISN'T ACHIEVED IN THE 90% DESIGN PRESENTED, AND NEVER WILL WITH FOUR LANES OF TRAFFIC IN AN ARTERIAL SETTING.
I DRIVE THE STRETCH OF EAST, EAST 51ST OFTEN.
I SEE PEOPLE GOING 50, 60 MILES AN HOUR RACING EACH OTHER TO THE NEXT LIGHT BECAUSE THERE'S TWO LANES TO WEAVE IN AND OUT OF.
I SEE PEOPLE USING THE CENTER TURN LANE TO PASS TRAFFIC THAT THEY'RE UNHAPPY WITH THE SPEED OF.
NOW, GRANTED, UM, DIVIDING THE, WITH AN ISLAND WILL HELP SOLVE THAT PROBLEM.
UM, BUT I DON'T BELIEVE TWO LANES OF TRAFFIC IN EITHER DIRECTION IS GONNA CHANGE, UM, THE DRIVING HABITS.
THE CITY GOALS OF FIFTY FIFTY TRAVEL MODE SPLIT AND PROGRESS AGAINST CLIMATE CHANGE WON'T BE FURTHERED BY THE AUTOMOBILE FIRST PLANNING BASIS FOR THIS PROJECT.
REDUCING LANES AND INSTALLING ROUNDABOUTS WILL ACHIEVE THE ORIGINAL VISION.
ROAD DIETS HAVE BEEN SUCCESSFUL ALL AROUND AUSTIN WITH OUR NEW EMPHASIS AND UNDERSTANDING OF THEM.
BARTON SPRINGS WAS MENTIONED, BUT ALL AROUND THE PERIMETER OF MUELLER.
EAST 51ST STREET ITSELF, EAST OF BERKMAN AND WEST OF I-35 HAVE BEEN REDUCED.
SPRINGDALE ROAD HAS BEEN REDUCED, LANES TAKEN OUT.
I QUESTION WHY THAT WOULDN'T WORK HERE.
A THREE-YEAR DELAY TO GET IT RIGHT, AN ALTERED ROAD DESIGN THAT STAFF IS GONNA PRESENT TO YOU WITH THE BACKUP THAT'S PART OF THIS AGENDA ITEM IS THE RIGHT THING TO DO.
UM, A YEAR OR TWO CAN BE CHALKED UP TO NOT COMMUNICATING THE DESIGN PROJECT CHANGES AS REQUESTED, AND A ROAD DIET STRATEGY COULD ACTUALLY REDUCE CONSTRUCTION COSTS CONCEIVABLY AND THOSE COSTS COULD BE MOVED TO REDESIGN.
THANK YOU VERY MUCH FOR YOUR COMMENTS AND THANKS FOR BEING HERE TODAY.
[1. Approve the minutes for the September 3, 2026, Mobility Committee Meeting.]
OUR ITEM NUMBER ONE IS BEING WITHDRAWN JUST SO IT CAN BE REPOSTED.[00:10:05]
ONE IS THE APPROVED, THE LAST MEETING'S MINUTES.ITEM TWO IS THE, UH, CORRECTED MINUTES.
TWO DOESN'T HAVE MINUTES UPLOADED.
BUT IF THEY'RE WRONG AND YOU WANNA PULL THEM, CHAIR, THAT'S YOUR, UH, PREROGATIVE.
SO SEPTEMBER 3RD MEETING MINUTES ARE READY TO GO, BUT ITEM TWO WAS A DIFFERENT MEETING? YES, THAT'S CORRECT.
WELL, LET'S GET A MOTION ON THE TABLE FOR ITEM NUMBER ONE TO APPROVE THOSE.
VICE CHAIR CADRE MAKES THE MOTION SECONDED BY COUNCIL MEMBER LANE.
UNANIMOUS ON THE DIAS AND ITEM NUMBER TWO WILL BE WITHDRAWN AND WE'LL SEE THAT AT ANOTHER MEETING.
[3. Briefing regarding electric vertical take-off and landing aircraft, which use electric motors and rotors to take off and land vertically, hover, and fly horizontally, and their potential uses, including considerations for emergency medical response operation resources within Austin-Travis County Emergency Medical Services (ATCEMS). [Mike Rogers, Assistant City Manager - City Manager’s Office; Lewis Leff, Assistant Director - Transportation and Public Works; Christopher Lester, Division Chief - ATCEMS]]
REGARDING ELECTRIC VERTICAL TAKEOFF AND LANDING AIRCRAFT, WHICH USE ELECTRIC MOTORS AND ROTORS TO TAKE OFF AND LAND VERTICALLY HOVER AND FLY HORIZONTALLY AND THEIR POTENTIAL USES.I WILL POINT PEOPLE TO THE POST, THE FULL POSTING LANGUAGE BECAUSE THAT'S NOT EVEN HALF OF IT.
UM, BUT I'M SO EAGER TO GET TO TALK ABOUT THIS TOPIC.
AND SO WE'VE GOT, UM, A HANDFUL OF GREAT EXPERTS HERE TO COME AND BRIEF US ON THIS TODAY.
GOOD AFTERNOON, MADAM CHAIR, VICE CHAIR, COUNCIL MEMBERS.
I AM, UH, MIKE ROGERS, ASSISTANT CITY MANAGER, AND I HAVE HERE WITH US TODAY LOUIS LEFF, WHO'S ASSISTANT, UH, DIRECTOR FOR TRANSPORTATION AND PUBLIC WORKS.
AND WE HAVE CHRISTOPHER LESTER, WHO IS THE DIVISION CHIEF AT ATCEMS. IT'S A MOUTHFUL THERE.
WELL, WHAT I WANTED TO DO IS PROVIDE YOU WITH AN UPDATE AS I PRESENTED, UH, A HIGH LEVEL, UH, OVERVIEW OF ELECTRIC VERTICAL TAKEOFF AND LANDING OR EV TOLLS A FEW MONTHS BACK.
THERE'S BEEN A LOT OF PROGRESS THAT HAS HAPPENED IN THIS, IN THIS FIELD OVER THE LAST FEW MONTHS.
AND SO THAT'S WHERE I WANTED TO GO IS REALLY START TO TALK ABOUT WHAT HAS HAPPENED SINCE THE LAST TIME I WAS HERE SPEAKING ON THIS TOPIC.
THERE'S BEEN A LOT OF PROGRESS IN TEXAS.
UH, WE'RE GONNA TALK ABOUT THAT.
INFRASTRUCTURE DEVELOPMENTS, THE CURRENT BARRIERS, CHALLENGES, UM, UH, AIR FIRST PILOT PROJECT THAT WE'RE LOOKING AT, AND THEN WE WANNA SUMMARIZE AND, AND GIVE SOME OF THE NEXT STEPS THAT WE SEE.
THE LAST TIME I WAS HERE, BASICALLY WE HAD RENDERINGS OF WHAT THESE EV TOLLS MAY LOOK LIKE.
AND I JUST WANNA SAY EV TOLLS ARE SYNONYMOUS WITH ADVANCED AIR MOBILITY.
THEY'RE ALSO SOMETIMES CALLED AIR TAXIS.
AND SO WHAT YOU SEE BEFORE YOU IS ONE OF THEM THAT IS ACTUALLY IN, IN PRODUCTION.
AND IF YOU CAN SEE, IT HAS SAYS TEAM USA ON THERE.
AND THAT WAS, AND I MENTIONED THIS LAST TIME, UH, IN OUR LAST MEETING.
UH, THIS IS A PART OF ONE OF THE VEHICLES THAT WILL BE USED FOR THE OLYMPICS IN 2028, AS THE OLYMPICS HAS, UH, STRUCK A DEAL WITH EV TOLLS TO DELIVER ATHLETES AND OTHERS TO THEIR VENUES.
AS YOU, I- IF YOU'VE BEEN OUT IN, UH, THE LA AREA, YOU KNOW THE TRAFFIC IS HORRENDOUS, AND SO THEY'RE LOOKING AT ALTERNATIVE MEANS TO GET PEOPLE IN AND OUT OF, OF THOSE VENUES.
THERE ARE TRADITIONALLY FOUR MAJOR PLAYERS IN THIS, IN THIS INDUSTRY.
THERE'S OTHERS, BUT THE MAJOR ONES ARE JOBY, ARCHER, BETA AND WISK.
AND JUST TO LET YOU KNOW THAT THIS IS, THIS IS HAPPENING.
AND WHY I WANTED TO, TO, TO HAVE THIS PICTURE UP HERE IS BECAUSE AGREEMENTS HAVE ALREADY BEEN, BEEN MADE FOR 2028.
THERE'S ALSO AGREEMENTS THAT HAVE BEEN MADE, UH, WITH CERTAIN AIRPORTS ALREADY.
WE DON'T EVEN HAVE THESE VEHICLES CERTIFIED YET.
AND THAT IS WHY I WANTED TO PRESENT THIS, IS BECAUSE THERE IS A HUGE PUSH AT THE FEDERAL LEVEL TO GET THESE VEHICLES CERTIFIED AS QUICKLY AS POSSIBLE.
AND THAT'S WHERE LAST MEETING, I ALSO TALKED ABOUT THERE WAS A PILOT PROJECT THAT THE FEDERAL GOVERNMENT HAD PUT OUT.
UH, WE DID SUBMIT THERE, BUT LET ME, LET ME TALK A LITTLE BIT ABOUT THAT, THAT PILOT PROJECT.
AND THIS IS, UH, ADMINISTERED BY THE FEDERAL AVIATION ADMINISTRATION.
IT IS TO TEST AIR TAXIS, REALLY THE SHORT RANGE, UH, EV TOLLS AND, AND LOOKING AT, UM, SOME OF THE IMPACTS THAT THEY MAY HAVE, INCLUDING NOISE.
AND SO ALL OF THESE ARE, ARE TESTS TO HELP, WHETHER IT'S THE FEDERAL GOVERNMENT, STATE GOVERNMENT, LOCAL GOVERNMENTS, TO HELP US TO DEVELOP POL - FUTURE POLICIES
[00:15:01]
AROUND THESE TECHNOLOGIES.ALSO, WITHIN THIS PILOT PROJECT THAT THE FEDERAL GOVERNMENT PUT OUT, THEY'RE LOOKING AT LONG RANGE FIXED WING, UH, FLIGHTS, UM, JUST TRYING TO GET A LONGER RANGE OUT THERE WITH THE, THE, THE AIRCRAFT THAT ARE OUT THERE, CARGO, LOOKING AT CARGO, UH, AND THE DELIVERY OF GOODS, WHICH WE'LL TALK ABOUT A LITTLE BIT TODAY AS WELL.
THIS IS, UH, I'M GONNA FOCUS IN HERE AS THE MEDICAL TRANSPORT, AND YOU WILL HEAR MORE ABOUT THAT TODAY AS WE ARE LOOKING AT, UH, ENTERING INTO THAT PARTICULAR ARENA.
AND THEN FINALLY, THIS WHOLE PILOT PROJECT THAT THE FEDERAL GOVERNMENT IS DOING IS, IS LOOKING AT AUTOMATION.
AND I DO WANNA EMPHASIZE, UM, THAT WITH THESE FLYING TAXIS, THEY ARE GOING TO START WITH PILOTS, EVEN THOUGH THE TECHNOLOGY IS BEING TESTED AS, UH, AU - WITH AUTOMATION WITH, UH, AUTONOMOUSLY AS WELL.
SO AS A PART OF THIS, UH, PROGRAM, THIS PILOT PROJECT, EIGHT AREAS WERE AWARDED THE OPPORTUNITY TO BE A PART OF THE PILOT, AND OUR APPLICATION, UNFORTUNATELY, FROM THE CITY OF AUSTIN WAS NOT ACCEPTED, BUT TXDOT WAS.
SO TEXAS IS A PART OF THIS PROCESS.
AND WITH THAT, JUST WANTED TO GIVE YOU AN IDEA OF WHAT, YOU KNOW, THE FIRST FLIGHT LOOKED LIKE.
SEPTEMBER 10TH, WE HAD THE FIRST FLIGHT UNDER THIS NEW AGREEMENT IN THIS NEW PILOT.
WE JUST HAVE A, A LITTLE BIT OF VIDEO.
CAN WE PLAY THAT? AS HE'S TAXING RIGHT NOW, SEE HOW SMOOTHLY THE, UH, CONTROLS...
AND THIS IS, HE'S NOT TAXING WITH HIS FEET, AND, UH, UH, THOSE OF YOU WHO ARE PILOTS KNOW THAT ON THE GROUND YOU ACTUALLY MOVE THE FLIGHT CONTROLS WITH YOUR FEET.
IT'S ACTUALLY THE FLIGHT CONTROL SYSTEMS. AND AS HE TURNS, YOU'LL WATCH, WATCH, YOU'LL SEE ONE OF THE PROPULSION UNITS WILL START TO TILT TO HELP HIM MAKE THE TURN.
HE'S TAXING OUT HERE, HE'S GONNA TAX OUT, YOU CAN SEE WHERE THE PERSON THERE IS WITH THE VEST.
HE'S GONNA TAXI OVER IN THAT DIRECTION, AND THEN HE'S GONNA LIFT OFF IN A HOVER.
THIS IS THE LOUDEST YOU WILL HEAR.
NOW HE'S IN A HOVER TAXI, AND NOW HE'S PUTTING THE PEDAL TO THE METAL.
WELL, AND, AND I DIDN'T WANNA PLAY THE WHOLE THING, BUT JUST WANTED TO GIVE YOU AN IDEA HOW THESE MAY BE A LITTLE BIT DIFFERENT, YOU KNOW, FROM YOUR TRADITIONAL HELICOPTERS.
FIRST OF ALL, THE SOUND, THAT IS, THAT IS AT ALLIANCE AIRPORT IN, IN FORT WORTH.
THAT'S AN ACTIVE RUNWAY, ACTIVE AIRPORT, AND THAT WAS, UH, ABOUT AS LOUD AS, AS THESE VEHICLES ARE.
UH, ALSO, THE OTHER, UM, DIFFERENTIAL FROM THIS TO HELICOPTERS IS THESE ARE ELECTRIC.
SO, UM, IT'S A, IT'S A BIT DIFFERENT.
AND SO, ON SEPTEMBER 10TH, WHEN THIS INAUGURAL FLIGHT TOOK PLACE, UH, IT WAS A REALLY BIG DEAL, AND IT REMAINS A BIG DEAL AS WE HAVE THE SECRETARY OF TRANSPORTATION, YOU HAVE OUR US SENATOR, YOU HAVE TXDOT'S HEAD, YOU HAVE FAA'S, UH, LEADER, AND YOU HAVE ROSS PEROT FROM ALLIANCE.
THIS IS SOMETHING THAT IS TRANSFORMATIVE, AND THAT'S WHY I BELIEVE THIS IS SUCH AN IMPORTANT TOPIC FOR US TO REALLY START TO GET IN FRONT OF.
AND SO, FROM A STANDPOINT OF TEXAS, WHAT IS THIS PILOT DOING? IT'S GONNA BE DOING ALL THOSE THINGS I TALKED ABOUT EARLIER, BUT THEY'VE ACTUALLY LABELED THE PROJECT AS PROJECT NEXUS, AND IT'S BUILDING THE INTERSTATE SYSTEM FOR ADVANCED AIR MOBILITY.
AND I FIND THAT VERY, VERY INTERESTING, BECAUSE IF YOU, IF YOU MAY RECALL, IN MY LAST PRESENTATION, I TALKED ABOUT PARADIGM SHIFTS.
AND WHEN THE TRANSPORTATION NETWORK, WHEN THE NATIONAL HIGHWAY SYSTEM WAS INITIALLY BUILT, WE SAW A PARADIGM, AND WHERE THAT PARADIGM CAME WAS IN LAND USE.
AND SO NOW, HERE WE HAVE THE NEXT AND THE NEWEST THING AND TECHNOLOGY IN TRANSPORTATION.
WE WILL BE SEEING A NEW PARADIGM THAT IS OCCURRING.
SO, ONCE AGAIN, THIS WAS THE FIRST EVTOL FLIGHT AS A PART OF WHAT, UH, UH, THIS, UM, UH, UM, THIS PILOT PROJECT.
AND YOU WILL SEE, EVEN WITHIN THIS PICTURE, THESE EVTOLS ARE DIFFERENT.
THIS IS NOT THE SAME ONE THAT YOU SAW IN THE EARLIER PICTURE.
THIS IS A TWO-SEATER HERE, SO THEY
[00:20:01]
VARY IN, IN, IN SIZE.THIS IS ANOTHER MANUFACTURER HERE THAT IS DOING THIS PARTICULAR ITEM.
AND SO, I WANNA TALK A LITTLE BIT OR HAVE OUR TEAM TALK A LITTLE BIT ABOUT, YOU KNOW, WHAT IS, WHAT'S HAPPENING, WHAT WILL WE SEE? AND SO, I'M GONNA TURN THIS OVER RIGHT NOW TO OUR ASSISTANT DIRECTOR.
SO, LOUIS LEF, ASSISTANT DIRECTOR OF TRANSPORTATION PUBLIC WORKS, AND AS ACM ROGERS MENTIONED, YOU KNOW, PROJECT NEXUS REALLY IS TRYING TO CREATE A SYSTEM OF SYSTEMS. THEY'RE GONNA TRY TO INTEGRATE ADVANCED AIR MOBILITY INTO THAT NATIONAL AIRSPACE SYSTEM.
IT'S GONNA BE ACROSS TEXAS, OKLAHOMA, LOUISIANA, AND THE CHOCTAW NATION.
AND SO, THEY'RE REALLY TRYING WITH THE INITIATIVE TO, TO FOCUS ON VALIDATING IMMEDIATE USE CASES FOR ADVANCED AIR MOBILITY, INCLUDING MEDICAL, CARGO, AND REGIONAL TRANSPORT.
THEY WANNA HAVE THIS BE A SCALABLE TEMPLATE THAT CAN BE USED FOR INTERSTATE REGULATORY HARMONIZATION, SO THAT WE HAVE A KIND OF FEDERALIZED SYSTEM FOR REGULATION, AND THEY WANNA USE THESE PILOTS ACROSS THE NATION TO BETTER DEFINE WHAT THOSE RULES AND REGULATIONS MIGHT BE.
THIS WILL ALSO BE A PHASED OPERATIONAL STRATEGY.
THEY WANNA START BY USING EXISTING AIRPLANES, HELICOPTERS, MAKING TEST FLIGHTS ALONG SOME OF THOSE AIR TRAVEL ROUTES TO ENSURE THAT THOSE ARE VALID ROUTES BEFORE GETTING IN THE EVTOLS INTO THOSE SPACES.
AND THE SECOND PHASE WOULD BE MORE ABOUT TESTING MEDICAL AND CARGO TRANSPORTATION BETWEEN THE RURAL FACILITIES AND MEDICAL CENTERS IN THIS TEXAS TRIANGLE.
THE LAST PHASE WOULD BE MORE ABOUT THE EVTOL KINDA AIR TAXI FLIGHTS ACROSS THE ENTIRE TEXAS TRIANGLE.
SO, WHAT WE'VE LEARNED FROM TXDOT STAFF WHO ARE ENGAGED WITH PROJECT NEXUS AT THE FEDERAL LEVEL WITH THE EIPP IS THAT THEY REALLY WANT, ARE GONNA START IN THE HOUSTON SPACE, AND THEY'RE GONNA BE LOOKING AT THAT CONNECTION TO OTHER MEDICAL CENTERS, REGIONAL HUBS, AND THEN UN- UNDERSTANDING WHAT THAT CARGO IMPACT MIGHT LOOK LIKE AS WELL, AND THEN GETTING INTO THAT TRANSPORTATION ELEMENT IN THE LATER PHASE OF THIS PROJECT.
SO, WHAT DOES IT MEAN FOR AUSTIN MOVING FORWARD? UM, THERE IS THIS CONVERSATION THAT'S ALREADY BEEN HAPPENING, UH, AS ACM ROGERS MENTIONED, ONE OF THE APPLICATIONS THAT WAS NOT SELECTED AT THE FEDERAL LEVEL WAS WITH LYFT AIRCRAFT.
THEY'VE GOT A PRESENCE HERE IN AUSTIN OVER AT THE LONG CENTER, AND, UH, A TEAM FROM CITY OF AUSTIN WORKING WITH THEM.
AND SO, UH, CONCURRENTLY, AS THAT FEDERAL PILOT IS HAPPENING, I THINK THERE IS A DESIRE TO, TO HAVE AN AIR FIRST CONSORTIUM TEAM TO REALLY START TO DEFINE WHAT IT LOOKS LIKE HERE IN AUSTIN AS THE PROJECT NEXUS, YOU KNOW, TXDOT-LED PROJECT AND PILOT AT THAT FEDERAL LEVEL CONTINUES TO MOVE FORWARD AS WELL.
DO YOU WANNA - BUT BEFORE WE, BEFORE WE GET INTO A LITTLE BIT OF WHAT WE WANTED TO TEST THOUGH, I DO WANNA MENTION THAT, AND I, AND I SAID EARLIER, THE FIRST FLIGHT, IF WE CAN GO BACK HERE, THE FIRST FLIGHT WITHIN THIS TEST, WITHIN THIS PILOT, HAS TAKEN PLACE.
HOWEVER, FIRST FLIGHTS IN THIS CITY HAVE TAKEN PLACE LONG AGO, AND WE'RE GONNA TALK ABOUT, IF YOU LOOK AT THE BACKGROUND OF THIS, OF THIS SHOT RIGHT HERE, YOU KNOW WHERE THAT IS.
AND IF YOU CAN SEE THE VEHICLE IN THE BACKGROUND, THAT'S LYFT, WHICH HAS BEEN HERE AT SOUTH BY SOUTHWEST DOING FLIGHTS FOR MANY, MANY YEARS.
AND WE DO HAVE THE, THE REPRESENTATIVES FROM LYFT ARE HERE TODAY.
THIS IS AN AUSTIN COMPANY THAT WE ARE LOOKING AT BEING A PART OF THIS PILOT, AND THAT'S WHERE WE WANNA TALK ABOUT, UH, UH, NEXT.
UM, YOU WANNA GO AHEAD AND, AND TALK A LITTLE BIT ABOUT WHAT WE'RE ULTIMATELY TRYING TO DO? GOOD AFTERNOON.
CHRIS LESTER, DIVISION CHIEF WITH AUSTIN TRAVIS COUNTY EMS. UM, YOU KNOW, WE'VE BEEN TALKING WITH LYFT FOR SEVERAL YEARS NOW BEFORE EVEN THE EIPP STUFF HAD, UM, STARTED TO BECOME A THING THROUGHOUT THE COUNTRY AND THE NATION, JUST BECAUSE OF THIS UNIQUE AIRCRAFT AND ITS FOOTPRINT, UM, ALLOWS YOU TO GET TO PLACES VERY QUICKLY, BYPASSING THE TRAFFIC ISSUES THAT WE HAVE HERE IN AUSTIN.
UM, THIS, WE HAVE SOME IDEAS OF PARTICULAR CALLS WE MIGHT BE ABLE TO GO TO OR USE IT AT SPECIAL EVENTS AND WORKING THROUGH A, A PLAN OF WHERE, WHEN, WHERE CAN THIS BENEFIT US AS A CITY AND A DEPARTMENT SO WE CAN CONTINUE TO PROVIDE THE HIGH LEVEL OF CARE THAT WE'VE BEEN KNOWN TO PROVIDE IN THE CITY, UM, AS WE MOVE FORWARD.
AS, AS Y'ALL KNOW, NOT EVERY ANSWER TO A SOLUTION IS AN AMBULANCE, RIGHT? SO WE HAVE VERY SPECIALIZED TEAMS WITH CHIP AND INTEGRATED HEALTH THAT HELP NAVIGATE THE CITY FOR OUR MOST VULNERABLE PEOPLE.
UM, WE STILL HAVE THESE HIGH INCIDENT CASES OF CARDIAC ARREST, BLOOD ADMINS, SHOOTINGS, AND THINGS LIKE THAT.
UM, WE EVEN NOTICED IT THE OTHER DAY WHEN, UH, TEXAS AND OHIO STATE WERE PLAYING AND TEXAS WON WITH A GREAT COMEBACK.
DOWNTOWN WAS LOCKED DOWN AND A LOT OF 911 CALLS
[00:25:01]
CAME IN, AND EVEN OUR FOLKS ON UTVS COULD NOT GET TO THE PATIENTS.IF WE HAD VIDEO, YOU COULD SEE PEOPLE JUST DRAGGING STRETCHERS DOWN THE ROAD TO BE ABLE TO GET TO PATIENTS, RIGHT? UM, THAT'S ANOTHER CASE WHERE THIS MIGHT BE ABLE TO BE VERY BENEFICIAL FOR US GETTING A SKILLED PARAMEDIC WITH A PARTICULAR PIECE OF EQUIPMENT TO THAT SCENE AND BEGIN TO STABILIZE THE PATIENT BEFORE THE AMBULANCE GETS THERE OR A U- UTV, WHATEVER IT MAY BE THAT'S GONNA BE TRANSPORTING.
THIS IS NOT FOR TRANSPORT BY ANY MEANS.
UM, IT DOESN'T TAKE THE PLACE OF STAR FLIGHT.
IT DOESN'T TAKE THE PLACES OF AMBULANCES, RIGHT? IT'S A, IT'S AN ADJUNCT TO JUST LIKE WE HAVE MOTORCYCLES.
UM, SO WE'RE REALLY EXCITED ABOUT WHAT THIS COULD DO TO HELP AUGMENT OUR RESPONSE TO OUR 911 SYSTEM ALREADY AND, UH, ARE VERY, UH, VERY PLEASED WITH BEING THE FOREFRONT OF THIS AS, AS A CITY AND A STATE.
AND SO I THINK AS WE'VE GOTTEN TO THAT NEXT LEVEL OF DETAIL, UH, BEYOND JUST THE CONCEPTUAL AND, AND LOOKING AT WHAT'S ACTUALLY HAPPENING ON THE GROUND IN OTHER PLACES HERE IN TEXAS AND ACROSS THE NATION WITH THIS FEDERAL PILOT, WE'VE STARTED TO REALLY DIG DEEPER INTO WHAT TO CONSIDER AT THE LOCAL LEVEL.
WHAT DOES IT MEAN FOR AUSTIN MOVING FORWARD? UM, WE KNOW THAT ONCE WE GET INTO AIRSPACE, THERE'S DIFFERENT LEVELS OF CONTROL THAT WE HAVE UP TO CERTAIN, UM, ALTITUDES.
AND SO BEING ABLE TO UNDERSTAND WHAT THOSE REGULATORY POWERS AND AUTHORITY MIGHT LOOK LIKE AT THE LOCAL LEVEL, ALL OF THESE RELY ON SOME TYPE OF TAKEOFF AND LANDING LOCATION.
UH, VERTIPORTS ARE TYPICALLY WHAT THEY'RE CALLED, AND WHERE WILL THOSE BE LOCATED? WHAT DOES THAT LOOK LIKE FOR, UH, LAND USE AND ZONING, BUILDING CODE CHANGES THAT MIGHT BE NEEDED TO CONSIDER WHERE THESE FLIGHT CORRIDORS ARE GONNA BE ESTABLISHED, WHERE THEY'LL BE USED, AND WHAT KIND OF FACILITY IMPACTS THAT MIGHT LOOK LIKE ON EXISTING BUILDINGS OR LOOKING FORWARD INTO THE, THE NEW DEVELOPMENTS? UM, WE KNOW SIMILAR TO AUTONOMOUS VEHICLES, YOU KNOW, THESE ARE GONNA BE ALL ELECTRIC, SO WHAT DOES THE CHARGING INFRASTRUCTURE LOOK LIKE AND HOW, HOW WILL WE PERMIT THAT ACTIVITY? UH, UNDERSTANDING THAT WHILE THERE'S, UH, LIMITED AND, AND LESS NOISE IN- INVOLVED WITH THESE TYPES OF, UM, UH, OF EQUIPMENT RELATIVE TO EXISTING LIKE HELICOPTERS AND THINGS LIKE THAT, UH, THERE STILL WILL BE SOME NOISE ASSOCIATED WITH IT.
AND, AND HOW'S THAT GONNA IMPACT, YOU KNOW, LOCAL ORDINANCES THAT WE ALREADY HAVE TODAY? AND THEN JUST MAKING SURE THAT WE ARE CONSTANTLY COMMUNICATING OUT WITH THE COMMUNITY SO THAT THEY KNOW WHAT'S GOING ON WITH THE DEVELOPMENT OF THIS TECHNOLOGY, UH, WHAT'S GOING ON WITH AUSTIN'S ROLE IN THAT, AND WHAT DOES THAT LOOK LIKE MOVING FORWARD FOR OUR COMMUNITY? YOU KNOW, IN, IN SUMMARY, I THINK THIS IS A, A, AN, AN OPPORTUNITY FOR US TO EITHER UTILIZE SOME OF OUR COMMITTEES THAT WE DO HAVE, SUCH AS OUR UTC OR DEVELOP A, ANOTHER SPECIAL COMMITTEE OF SOME SORT TO REALLY START TO, TO LOOK AT AND HAVE THESE CONVERSATIONS TO HELP US TO DEVELOP THESE, THESE FUTURE POLICIES ALONGSIDE WITH THESE TESTS, WHETHER IT'S AT THE FEDERAL LEVEL OR WHETHER IT'S THE LOCAL LEVEL WITH THESE, THESE PILOT PROJECTS THAT ARE, THAT ARE TAKING PLACE.
UH, W- W- WE'RE GONNA NEED TO GET AHEAD OF THIS.
THIS ISN'T SOMETHING THAT IS COMING, THIS IS SOMETHING THAT IS HERE.
AND WE ARE, AND I HATE TO SAY THIS, BUT WE'RE A BIT BEHIND, AND WE NEED TO ENSURE THAT WE HAVE THE DISCUSSION WITH OUR COMMUNITY AND START WITH THE DEVELOPMENT ALONGSIDE WITH THESE PILOTS THAT ARE TAKING PLACE, THE DEVELOPMENT OF THE POLICY THAT WILL HELP US TO HAVE A SUSTAINABLE COMMUNITY FOR, UM, UH, IN PERPETUITY.
SO WITH THAT, I WANT TO, UH, LEAVE IT AT THAT AND WELCOME ANY TYPE OF QUESTIONS THAT YOU ALL MAY HAVE.
I HAVE ONE VERY HIGH LEVEL QUESTION BEFORE I KICK IT OVER TO THE REST OF THE COMMITTEE MEMBERS.
WHAT KIND OF SPEEDS ARE WE TALKING ABOUT HERE? 'CAUSE I WAS THINKING IT WOULD BE PERFECT FOR, YOU KNOW, MEDICAL TRANSPORT, YOU KNOW, BETWEEN CITIES, DEPENDING ON NEED.
UM, BUT IT SOUNDS LIKE THAT'S NOT REALLY THE, THE NEED RIGHT NOW AT THE TIME TO REPLACE STARFLIGHT OR ANYTHING LIKE THAT.
HOW FAST DO THESE THINGS GO, AND IS THERE A FUTURE WHERE THEY WOULD BE USED FOR MEDICAL TRANSPORT? THAT PARTICULAR AIRCRAFT THAT WE WERE, WE'VE BEEN DISCUSSING ABOUT, UM, MAX SPEED IS 60 MILES AN HOUR AND CRUISING SPEED IS 50.
UM, SINCE IT'S DESIGNED TO NOT, IT'S OBVIOUSLY NOT A FIXED WING, UM, IT'S NOT MADE FOR THE SUPER LONG DISTANCE, RIGHT, BECAUSE EVERYTHING'S RUNNING OFF OF BATTERIES.
UM, IT'S MORE FOR THE, YOU HAVE A PLACE TO GO AND GET BACK FROM AND GET SOMETHING THERE AND BACK VERY QUICKLY.
I SEE VICE CHAIR CADRE HAS HIS HAND UP.
WHY DON'T YOU GET IT STARTED? SURE.
WELL, I APPRECIATE THE PRESENTATION.
I, I KEPT THINKING OF THE JETSONS DURING THIS PRESENTATION.
UM, SHOW CAME OUT WAY BEFORE I WAS BORN, BUT I, I'VE SEEN IT.
ARE YOU CALLING US OLD? NO, NO.
I, I WAS LOOKING IT UP JUST NOW.
UM, UM, BUT I, I, I DID HAVE SOME QUESTIONS AND I'M JUST GONNA ASK THEM AS I WAS KINDA JOTTING THEM DOWN.
I MEAN, ONE OF THE QUESTIONS CHAIR ELLIS ASKED IS, WAS ABOUT SPEED, BUT MY QUESTION WAS HOW, HOW HIGH WOULD THEY BE, RIGHT? LIKE WHERE WOULD THEY BE
[00:30:01]
IN, IN RELATION TO LIKE A HELICOPTER VERSUS THIS VERSUS, YOU KNOW, LIKE PASSENGER AIRCRAFT? AND, AND THO- THOSE ARE, THOSE ARE THE THINGS THAT WHEN WE TALK ABOUT, UH, FAA, THOSE ARE THE, THE TYPES OF THINGS THAT THE FAA WILL BE REGULATING.AND THERE WILL BE CERTAIN STRATA FOR, UM, YOUR, YOUR DRONES THAT PEOPLE ARE JUST, YOU KNOW, CAN PURCHASE OFF, OFF A RETAILER.
THERE'LL BE, OR THERE ALREADY ARE DIFFERENT STRATAS FOR HELICOPTERS, AND THEN YOU HAVE YOUR GENERAL AVIATION AND COMMERCIAL.
BUT THOSE WILL BE ITEMS THAT, UH, ALONG WITH THESE TESTS IS FAA WILL DEVELOP ALL OF THE, THE, THE, THE RULES THAT ARE ASSOCIATED WITH THAT.
AND THAT'S WHERE WE WANTED TO HIT UPON THE, THOSE CORRIDORS.
EVEN THOUGH THEY WILL HAVE THAT FINAL SAY IN WHAT STRATA THEY'RE GOING TO HAVE, I THINK WE HAVE TO THEN START TO FOCUS ON THE CORRIDORS THAT COME DOWN TO WHEREVER THOSE VERTEPORTS MAY BE AND LOOK AT, UM, ANY TYPE OF POLICY OR STRATEGY ZONING THAT'S ASSOCIATED WITH THE LAND USE THAT'S ASSOCIATED WITH THAT.
BUT, UM, YEAH, THE SPECIFICS, I CAN GET YOU THAT FROM THE FAA.
I DON'T HAVE THAT WITH ME RIGHT NOW THOUGH.
AND THEN I WAS GONNA, I MEAN, IT'S, WE SAW THE EXAMPLE, I GUESS AT SOUTH BY AND SAW THE VIDEO, BUT WHERE WOULD TAKE OFF AND LANDING NORMALLY TAKE PLACE? I, I MEAN, I ASSUME IF I ASKED FOR ONE, AND, AND THAT'S ANOTHER QUESTION I HAVE IS HOW WOULD A PERSON, LIKE, WOULD IT BE, IS IT SIMILAR TO WHEN YOU GET AN, UH, A WAYMO, YOU DOWNLOAD AN APP, YOU REQUEST IT, PICKS YOU UP, DROPS YOU OFF, BUT I ASSUME IT DOESN'T PICK ME UP RIGHT IN FRONT OF CITY HALL AND DROPS ME IN FRONT OF MY FRONT DOOR.
AND, AND THERE'S DIFFERENT LEVELS HERE.
SO WITH, AND I WANNA DIFFERENTIATE WITH WHAT WE'RE LOOKING AT AS A PILOT, UH, THAT'LL WORK WITH EMS IS DIFFERENT.
EVEN THOUGH THEY, IT FLIES, IT HAS, IT, IT OPERATES OFF OF DIFFERENT RULES AND REGULATIONS.
AND YOU HEARD, UH, 60 MILES AN HOUR.
THESE AIR TAXIS, THE, THE BIGGER ONES THAT YOU SAW, DIFFERENT SPEEDS, SPEEDS THAT CAN GO UP TO 200 MILES AN HOUR AND THEY HAVE RANGES UP TO 200 MILES.
SO THOSE ARE GONNA BE VERY DIFFERENT.
BUT WHEN YOU'RE STARTING TO TALK ABOUT IN THAT CATEGORY RIGHT THERE, THE AIR TAXIS, THAT'S WHERE WE WANNA GET...
YOU, YOU JUST HIT UPON THE QUESTIONS THAT WE NEED TO START ANSWERING.
AND THIS IS WHERE THE LOCATION OF VERTIPORTS IS GONNA BE EXTREMELY IMPORTANT BECAUSE WE WANT TO ENSURE THAT THERE'S MULTIMODAL FACILITIES THAT ARE THERE.
WE ALSO, AND THEN JUST TALKING WITH THE INDUSTRY, OBVIOUSLY THEY, THEY START AT AIRPORTS.
AND MATTER OF FACT, SOME OF THEM ARE EVEN OWNED BY THE AIRLINES.
SO IT'S, THEY DON'T CONSIDER IT COMPETITION WITH THE AIRLINES.
BUT ONCE YOU LAND OFF A PLANE, THEN YOU POTENTIALLY GET ON ONE OF THESE.
AND WHERE DO THEY WANNA COME? DOWNTOWNS.
THEY'VE ALSO MENTIONED LIKE UT, MAJOR GENERATORS, MAYBE THE DOMAIN.
THEY MENTIONED, UH, CIRCUS OF AMERICA, AREAS LIKE THAT.
AND SO, UM, EVEN THOUGH THEY HAVE THE ABILITY TO LAND ANYWHERE, UH, THAT'S WHERE WE NEED TO GET IN FRONT OF THAT, KNOWING WHERE THE INDUSTRY WANTS TO BE AND ENSURING THAT THAT WORKS FOR THE CITIES AS WELL.
AND ENSURING THAT WE HAVE, SAY FOR INSTANCE, IF THEY LAND ON, LAND ON TOP OF A, A HIGH-RISE BUILDING, THEN WE NEED TO ENSURE THAT THERE'S GOING TO BE SOME TYPE OF MULTIMODAL AT THE BASE OF THAT BUILDING TO HAVE PEOPLE COMPLETE THEIR, THEIR JOURNEYS.
SO THOSE ARE SOME OF THE THINGS THAT WE NEED TO BE ABLE TO, TO, TO REALLY HAVE SOME, SOME REALLY DIS - UH, HARD DISCUSSIONS, OR THEY MAY NOT BE HARD, BUT WE JUST NEED TO HAVE THOSE DISCUSSIONS AS WE START TO MOVE FORWARD.
AND THAT'S WHERE WORKING WITH THE INDUSTRY, UNDERSTANDING WHAT THEY WANNA DO, SEEING DOES THAT ALIGN WITH WHERE WE WANNA BE AS A CITY AS WELL? YEAH.
THREE MORE QUESTIONS ON THIS AND IT'LL BE PRETTY QUICK.
UM, WITH, WITH WAYMO AND A LOT OF THE OTHER AVS, WHEN THEY FIRST CAME INTO TOWN, THEY WERE KINDA GEO-FENCED IN THE, IN THE DOWNTOWN AREA.
HOW WOULD IT WORK FOR, FOR, FOR SOMETHING LIKE THIS? IT'S VERY SIMILAR.
VERY SIMILAR BECAUSE THESE, THESE ARE ALSO GONNA BE WORKING THROUGH FAA RULES AS WELL.
SO, YOU KNOW, WE'RE TALKING AIR TRAFFIC CONTROL AS WELL, THAT, THAT WOULD BE ASSOCIATED WITH MANY OF THESE, THESE ITEMS AS WELL.
THIS, THIS IS A NEW, NEW GAME HERE.
UM, THE FIRST ONE, THE FIRST ONE DOESN'T REALLY HAVE TO DO WITH, UM, WITH THIS PER SE, BUT THERE, THERE'S SOMETHING THAT I SAW CALLED ZIPLINE.
I DON'T KNOW IF YOU'RE FAMILIAR WITH ZIPLINE.
I, WE'RE HAPPY TO TALK ABOUT THAT AS WELL.
AND SO WHEN IT COMES TO ADVANCED AIR MOBILITY,
[00:35:01]
THERE'S A LOT OF THINGS THAT ARE HAPPENING IN, IN THIS ARENA RIGHT NOW.SO WE'VE BEEN TALKING ABOUT THE DIFFERENT...
WE'RE, UH, WHEN YOU'RE TALKING ABOUT AIR TAXIS OR YOU'RE TALKING ABOUT, UM, WHAT WE'RE LOOKING AT, UH, TRYING TO DEVELOP A MOU FOR, FOR, UH, MEDICAL TRANSPORT, THESE ARE SEPARATE CATEGORIES.
ZIPLINE IS ALSO IN THE CATEGORY FOR THOSE WHO DON'T KNOW WHAT A ZIP LINE IS.
UH, PRIMEAIR IS ALSO IN THIS ARENA AS WELL.
THESE ARE SMALLER DRONES THAT WILL BE DELIVERING GOODS TO PEOPLE.
SO WE SAW A CATEGORY OF LIKE CARGO.
SO WHAT THESE DRONES DO IS THEY WILL PICK UP...
I'LL JUST USE MEDICINE AS AN EXAMPLE.
THEY PICK UP MEDICINE, WHETHER IT'S AT THE PHARMACY AND THEY WILL END UP DELIVERING IT TO YOUR HOUSE.
AND WHAT, HOW THEY OPERATE IS THERE'S A TETHER THAT COMES FROM THE DRONE THAT DROPS DOWN INTO WHEREVER IT'S TRYING TO BE DELIVERED, AND THAT'S HOW YOU WOULD RECEIVE YOUR, YOUR, YOUR GOODS OR YOUR CARGO, WHATEVER THAT MAY BE.
THAT TECHNOLOGY, WHEN I SAID IT'S HERE, IT IS HERE.
WE HAVE THOSE COMPANIES ARE IN FOR PERMITS RIGHT NOW.
AND SO WE REALLY DO NEED TO HAVE CONVERSATIONS ABOUT THIS AND BECAUSE WE'RE GONNA SEE, WE'RE GONNA SEE DELIVERIES OF, OF GOODS, WHICH THAT'S GONNA BE THE FIRST THING, AND A, A FEW OTHER THINGS.
BUT WE HAVEN'T REALLY HAD THE, THE REALLY IN-DEPTH CONVERSATION.
THE TECHNOLOGY HAS JUST COME SO FAST THAT WE NEED TO TAKE OUR TIME.
AND THAT'S WHY WE REALLY WANTED TO CONTINUE TO BE HERE BECAUSE THESE...
W- W- WE HAVE TO START UNDERSTANDING HOW THIS TECHNOLOGY IS GOING TO WORK SO WE, WE DON'T GET CA- CAUGHT FLAT-FOOTED.
AND WHAT TO DO IF, IF ONE, IF ONE WERE TO FALL OUT OF THE SKY, WHAT DO WE DO? WHO DO WE CALL? HOW DOES EMS GET INVOLVED? HOW DOES, UH, PUBLIC SAFETY GET INVOLVED? WE DON'T HAVE ANSWERS TO THAT.
I MEAN, IF ONE FALLS OUT OF THE SKY, PEOPLE ARE PROBABLY DEAD.
AND IF ONE FALLS OUT OF THE SKY AND, AND HITS A RESIDENTIAL BUILDING OR - FOR THE DELIVERY DRONES, THEY'RE VERY LIGHT.
I'M TALKING ABOUT, I'M TALKING ABOUT THE, THE, THE, THE LARGER, UM, THE, WHATEVER THE - AND, AND, AND I WAS TALKING ABOUT JUST THE DELIVERY.
JUST THE DEL - THE DELIVERY DRONES ARE EXTREMELY LIGHT.
I MEAN, I, I THINK MY BIG CONCERN, AND I'M, I'M THANKFUL WE'RE HAVING THIS CONVERSATION.
I LOOK FORWARD TO MANY CONVERSATIONS.
SAME, IT'S THE SAME CONCERN I'VE HAD WITH, UH, YOU KNOW, THE AVS IS THE LACK OF REGULATION THAT WE, THE, YOU KNOW, LACK OF AUTHORITY WE HAVE AS A CITY GOVERNMENT.
SO I, I'M HOPING WE'RE, WE'RE, WE'RE GONNA BE AHEAD OF MANY OF THOSE CONVERSATIONS, UM, WITH THESE COMPANIES AS THEY COME, COME INTO TOWN.
UM, I'M HOPING WE'RE GONNA BE ABLE TO TALK TO FOLKS AT THE STATE AND THE FEDERAL LEVEL, WORK WITH, YOU KNOW, YOU KNOW, OUR ALLIES OVER THERE, UH, BECAUSE, YOU KNOW, ULTIMATELY, I, I WANNA MAKE SURE PEOPLE ARE SAFE AND I WANNA MAKE SURE THAT THE HICCUPS THAT WE'VE SEEN, UH, WITH THESE AVS IN AUSTIN ON OUR ROADS, UM, WE DON'T SEE THINGS LIKE THAT HAPPEN WITH THESE, YOU KNOW, F- FLYING TAXIS.
TO, TO ADD TO THAT, SIR, UM, THE ZIP LINE IN PARTICULAR, THAT WHEN WE, WE HAVE SPOKEN WITH THEM SINCE THEY'RE WORKING IN GETTING IT IN AUSTIN AND THEY ARE EQUIPPED WITH A PARACHUTE.
UM, SO IF IT DOES HAVE A MALFUNCTION, A PARACHUTE DEPLOYS, UM, AND SO DOES THE EVTOL THAT WE CAME TO SPEAK TO YOU ABOUT.
IT ALSO HAS A PARACHUTE THAT DEPLOYS, UM, SO THAT THOSE CONCERNS ARE, ARE LIMITED MUCH LESS.
YEAH, LIKE I SAID, MY MAIN CONCERN IS JUST HUMAN SAFETY, BUT I APPRECIATE, UH, THE PRESENTATION AND, UH, TAKING ALL MY QUESTIONS.
I'LL JUMP IN HERE BEFORE TAKING QUESTIONS FROM OTHER FOLKS, BECAUSE I'M SURE THERE ARE SOME.
ON HIS POINT ABOUT THE GEOFENCING, YOU KNOW, HAVING NEW TECHNOLOGIES COME INTO DOWNTOWN AUSTIN AND TO WORK WITH A LIMITED FOOTPRINT BEFORE THEY EVER GET ON A HIGHWAY, I'M CURIOUS ABOUT GEOFENCING OR FAA REGULATIONS AROUND HEIGHT.
I KNOW THAT MOST PEOPLE WHO OPERATE A DRONE FOR CAMERA FOOTAGE OR WHATNOT, UM, THEY'VE GOT A CERTAIN HEIGHT THEY NEED TO STAY UNDER.
WHAT DOES IT LOOK LIKE WHEN YOU'RE DEALING WITH THIS MIDDLE GROUND OF YOU'RE GONNA HAVE CAMERA DRONES AT ONE LEVEL, YOU'RE GONNA HAVE PEOPLE IN DRONES AT ANOTHER LEVEL, AND THEN YOU'RE GONNA HAVE YOUR MAJOR AIRCRAFT CARRIERS? WHAT DOES THAT LOOK LIKE? I MEAN, I KNOW THAT DRONES ARE REGULATED BY THE FAA, SO I, I THINK THOSE...
I HAVE CONFIDENCE SOMEWHAT THAT THOSE RULES WILL BE HANDLED APPROPRIATELY, BUT I'M CURIOUS ABOUT, LIKE, THE REGULATORY ASPECT, ESPECIALLY IF AIR TRAFFIC CONTROLLERS ARE A PART OF THIS CONVERSATION, BECAUSE WE KNOW THERE'S NOT ENOUGH AIR TRAFFIC CONTROLLERS ACROSS THIS COUNTRY.
UH, WHAT KIND OF GUARDRAILS ALREADY EXIST IN PLACE FOR THAT, THAT MID-LEVEL OF STAY OUT OF THE PLANES WAY AND ALSO STAY OUT OF THE LOWER, THE LOWER LEVEL CAMERA FOOTAGE DRONES? UH, I THINK THE GEOFENCING IS, IS THE,
[00:40:01]
THE ONE GUARDRAIL THAT'S OUT THERE WHERE THERE'S CERTAIN AREAS THAT, UM, CERTAIN DRONES CANNOT FLY WITHIN THEIR, WITHIN THOSE PARTICULAR AREAS, LIKE AIRPORTS, UM, DIFFERENT STADIUM AND THING OF THAT, THINGS OF THAT NATURE.BUT TH- THIS IS WHY, AND IT'S WHY IT'S IMPORTANT TO UNDERSTAND THAT NOT ALL OF THOSE ANSWERS HAVE, HAVE BEEN DETERMINED YET, AND THAT'S WHY THE FEDERAL GOVERNMENT, THE STATE ARE REALLY IN THIS PILOT, IN THESE PILOTS THROUGHOUT THE COUNTRY, IS TO BE ABLE TO START ANSWERING MANY OF THOSE QUESTIONS THAT, THAT I'M SURE EVERYBODY ACROSS THIS COUNTRY HAS AT THIS PARTICULAR TIME, AND HOW IS IT ALL GONNA BE REGULATED? BECAUSE MO- MOST OF IT, UM, ESPECIALLY IN THE AIR, IS NOT GONNA BE REGULATED BY LOCAL GOVERNMENT.
IT'S GONNA BE FAA OR, OR THE, AND/OR THE STATES THAT ARE GONNA BE INVOLVED WITH THAT.
SO THAT'S WHY I BELIEVE IT IS EXTREMELY IMPORTANT FOR US AS A CITY TO UTILIZE OUR COMMITTEE STRUCTURE OR DEVELOP OTHER, UH, MEANS IN WHICH WE CAN START TO ASK THOSE QUESTIONS TO THE APPROPRIATE PEOPLE WHO ARE CONDUCTING THESE PILOT PROJECTS RIGHT NOW, UH, WITH FAA OR, UH, TXDOT.
SO, UM, YEAH, IT'S UNFORTUNATE THAT I CAN'T ANSWER ALL OF THOSE QUESTIONS AT THIS PARTICULAR TIME, BUT THAT'S WHAT A LOT OF THE PILOTS ARE HERE TO DO, TO LOOK AT, TO EVALUATE, TO ASSESS WHAT'S GOING, WHAT, WHAT CAN TAKE PLACE, WHAT CAN'T TAKE PLACE, HOW, WHAT KIND OF REGULATION DO WE NEED? AND THAT'S WHY WE, AS A CITY, WANNA BE AND NEED TO BE INVOLVED IN THESE DISCUSSIONS THAT ARE GONNA BE HAPPENING AT THE FEDERAL AND STATE LEVEL, BECAUSE WE CAN, AT THE LOCAL LEVEL, AND WITHIN THIS PROCESS, YOU KNOW, THEY'VE TALKED ABOUT, AND, AND LEWIS TALKED ABOUT AUSTIN, SAN ANTONIO, UH, HOUSTON, AND, AND FORT WORTH, WE ALL NEED TO BE AT THAT TABLE BECAUSE THIS IS GONNA HAVE SUCH AN IMPACT, A MAIN, MAIN IMPACT IN OUR CITIES ACROSS, ACROSS THE NATION.
I'M GLAD WE ARE A PART OF THIS, BUT WE NEED TO CONTINUE TO BE A PART OF IT, AND IT NEEDS TO, TO GROW TO, UH, HAVE BIGGER CONVERSATIONS WITH BIGGER GROUPS WITHIN OUR CITIES.
I FEEL LIKE IT'S PROBABLY GONNA LEND ITSELF TO A CONVERSATION WHERE THE STATE WILL NOW FIND ITSELF FEELING LIKE WHAT THE CITY OF AUSTIN FEELS LIKE, WHERE WE'RE ALWAYS SAYING, "WE'VE GOT NEW TECHNOLOGY.
IT'S FINE IF YOU WANNA BE THE ONE TO REGULATE IT, WE JUST NEED SOME CONSISTENCY ACROSS THE STATE." AND NOW THEY'RE GONNA BE IN A POSITION TO SAY, YOU KNOW, WHAT TEXAS THINKS THEY NEED OUT OF THEIR AIRSPACE MIGHT BE VERY DIFFERENT THAN WHAT OTHER STATES FEEL.
UM, SO I THINK THAT CONVERSATION'S GONNA BE VERY INTERESTING MOVING FORWARD.
I'LL KICK IT OVER TO COUNCIL MEMBER LANE.
UM, SO YEAH, YOU'VE BULLET POINTED OUT AT, UH, ALL THE AREAS THAT MY QUESTIONS WERE IN, UM, WHICH IS GREAT.
UM, BUT I, I WANNA ZERO IN ON AS FAST AS THIS TECHNOLOGY IS MOVING, AS QUICKLY AS IT SOUNDS LIKE THE TIMELINE WILL BE TO GET TO AGREEMENTS AND REGULATION ONCE, ONCE WE KNOW MORE, UM, OUR LAND DEVELOPMENT CODE IS NOT EXACTLY KNOWN FOR MOVING AT THE, AT LIGHT SPEED, AT, AT LIGHTNING SPEEDS.
SO, UM, I KNOW THAT'LL BE A CHALLENGE.
AND I ALSO THINK WHILE THE FAA REGULATES FLIGHT, UM, IT'S ALSO NOT QUITE SUCH A SIMPLE DIVISION BECAUSE BUILDINGS GO QUITE HIGH AND WE REGULATE THAT AIRSPACE THROUGH, YOU KNOW, OUR HEIGHT RESTRICTIONS.
AND I CAN REALLY SEE HOW, UM, THE LANDING, WHERE PEOPLE CAN LAND, UM, ROOFTOPS BEING AN OBVIOUS SOLUTION FOR PEOPLE TO BE EXPLORING.
UM, I JUST KINDA WANNA RAISE THAT ISSUE OF AIR RIGHTS AND IT'S MAYBE NOT ENTIRELY A LAND DEVELOPMENT CODE AT THIS POINT BECAUSE WE'RE, WE'RE GONNA NEED TO BE ABLE TO MOVE QUICKLY AND THERE IS REGULATORY SPACE FOR US IN THERE.
SO THAT'S GONNA BE A CHALLENGE FOR US, IT SEEMS. THERE'S NO QUESTION THERE UNLESS YOU JUST WANNA COMMENT.
THEY'RE VERY FAMILIAR WITH FAA REGULATIONS.
THEY CAN KINDA NAVIGATE THROUGH SOME OF THAT.
WE'VE GOT OUR PUBLIC SAFETY FOLKS AT THE TABLE, TRANSPORTATION FOLKS.
SO IT'S GONNA BE ONE OF THOSE AREAS WHERE IT'S GONNA TAKE A LOT OF DIFFERENT KINDA LENSES TO, AND PERSPECTIVES TO THE CHALLENGES THAT WE'RE FACING WITH THIS NEW TECHNOLOGY COMING AROUND, WHICH, AGAIN, IS AN EXCITING TIME TO BE AROUND FOR THIS, AT THIS POINT.
CAN I ADD ON WHAT THEY WERE SAYING, MA'AM? THEY, UM, THE FAA IS,
[00:45:01]
THEY'RE TRYING TO BUILD, YOU KNOW, IN, IN OTHER WORDS, A HIGHWAY, HIGHWAY SYSTEM IN THE SKIES, RIGHT? SO WHAT, WHAT OPERATES IN WHAT SECTIONS, LIKE, FROM ZERO TO 400 WITH 500 TO 1,000 FEET.AND THEY'RE TRYING TO, YOU KNOW, BUILD THAT OUT.
THERE'S NOT GONNA BE ROADS, OBVIOUSLY, BUT, UH, CONCEPTUALLY, THAT'S WHAT THEY'RE TRYING TO DO.
AND AS Y'ALL HAVE BROUGHT UP, YOU KNOW, THOSE DIFFERENT ELEVATIONS WORK DIFFERENTLY IN SOME CITIES THAN OTHERS.
WE HAVE PRETTY TALL BUILDINGS HERE IN AUSTIN, AND, UH, YOU KNOW, SOMETHING THAT 400 FEET IN AUSTIN'S A LOT DIFFERENT THAN 400 FEET IN ROUND ROCK.
I THINK THAT'S A BIG CHALLENGE THAT THE FAA'S WORKING WITH AND WORKING THROUGH, AND THAT'S KIND OF WHERE WE COME IN AS WELL AND HELPED GIVE GUIDANCE FOR THIS PARTICULAR CITY AND WHAT WORKS BEST FOR US HERE.
THE OTHER QUESTION THAT I HAVE IS JUST NOISE LEVEL OF THESE VERSUS, SAY, HELICOPTERS.
AND ITS IMPACT, OF COURSE, WILL DEPEND ON WHAT FLIGHT, WHAT HEIGHT IT'S FLYING AT, BUT I'M JUST CURIOUS, GROSS.
WE HAVE AN EXPERT THAT'S, THAT'S SITTING RIGHT OVER THERE THAT ACTUALLY MANUFACTURES THESE.
SO, UM, AS YOU HEARD IN THAT VIDEO, UH, IT WASN'T LOUD.
UM, AND THAT'S SOMETHING THAT, UM, I THINK PEOPLE WILL SEE, EVEN WITH THE, THE, THE SMALL UNITS THAT, THAT HAVE BEEN, UH, OUT HERE AT, AT, UM, PALMER CONVENTION CENTER FOR THE LAST FEW YEARS.
I THINK, AND A LOT OF PEOPLE HAVE TAKEN TEST FLIGHTS ALREADY, THEY CAN ATTEST.
THEY'VE, THEY'VE ACTUALLY GONE UP IN ONE.
THEY'VE HEARD IT, AND IT'S, IT'S NOT THAT LOUD, BUT I WOULD...
I HAVE NEVER BEEN IN ONE, SO, UM, BUT IT DIDN'T SOUND VERY LOUD TO ME.
ANY FURTHER QUESTIONS? IT DOES NOT APPEAR SO.
UH, LET'S KEEP THE CONVERSATION GOING.
SOUNDS LIKE THERE'S STILL A LOT TO TALK ABOUT, UM, BUT CERTAINLY WANNA, YOU KNOW, APPRECIATE SOMETIMES THERE'S NEW TECHNOLOGY AND WE HAVE TO ADAPT AND, AND FIGURE OUT WHAT OUR GAME PLAN'S GONNA BE TO HELP MAKE SURE THAT THE, THE GENERAL PUBLIC IS SAFE AS WE SEE THESE OUT, OUT THERE IN THE WORLD.
THANK YOU FOR YOUR TIME TODAY.
AND WE'LL, WE'LL PROVIDE, UH, GENERAL UPDATES AS, AS WE MOVE FORWARD WITH OUR PILOT PROJECT AND WE DEVELOP THE MOU AND, AND START LOOKING AT THIS FROM AN EMERGENCY RESPONSE STANDPOINT.
AND I DO WANNA EMPHASIZE, I THINK IT'S IMPORTANT THAT WE LOOK AT THIS FROM A STANDPOINT OF HOW CAN WE DO THE MOST GOOD WITH THIS TECHNOLOGY? AND IF WE CAN START LOOKING AT WAYS IN WHICH WE CAN GET TO VICTIMS OF, OF HEART ATTACKS, CAR CRASHES, OR WHATEVER INCIDENT THAT MUCH QUICKER, WHERE THEN WE CAN HAVE OUR FIRST RESPONDERS BE THERE, UM, DO THE INITIAL DEFIBRILLATION OR WHATEVER IT MAY BE, WE CAN START TO POTENTIALLY SAVE LIVES WITH THE POTENTIAL TECHNOLOGY AND HAVE ALL THE TOOLS NECESSARY FOR OUR EMS. SO THANK YOU SO MUCH FOR TAKING THE TIME AND WE WILL BE BACK WITH FURTHER UPDATES.
[4. Updates on the East 51st Street Mobility Project, which improves safety for pedestrians, cyclists, and drivers on the section of East 51st Street from Berkman Drive to Cameron Road. [Richard Mendoza, Director - Austin Transportation and Public Works]]
I'LL CALL UP WILL BE ITEM NUMBER FOUR, UPDATES ON THE EAST 51ST STREET MOBILITY PROJECT, WHICH IMPROVES SAFETY FOR PEDESTRIANS, CYCLISTS AND DRIVERS ON THE SECTION OF EAST 51ST STREET FROM BIRKMAN DRIVE TO CAMERON ROAD.AND I BELIEVE WE HAVE DIRECTOR MENDOZA HERE - YES.
AND, UH, NOW FOR A MORE GROUNDED CONVERSATION.
I'M JOINED BY ASSISTANT DIRECTOR OVER TRANSPORTATION ENGINEERING, MS. ANNA MARTIN.
I WANNA THANK THE COMMITTEE FOR THE OPPORTUNITY TO COME PROVIDE A, UH, SHORT UPDATE ON THE EAST 51ST STREET, UH, REVITALIZATION, UH, PROJECT.
ALL RIGHT, SO AGAIN, I'M HERE TODAY TO PROVIDE AN UPDATE ON THE EAST 51ST STREET REBIL - REVITALIZATION PROJECT.
THIS PROJECT HAS A LONG HISTORY, BUT I WILL COVER SOME OF THE BACKGROUND, CURRENT STATUS, AND OUR NEXT STEPS.
THE IMPROVEMENTS FOR THE EAST 51ST STREET CORRIDOR DATE BACK TO 2012 AS THE MUELLER REDEVELOPMENT WAS UNDERWAY.
A VISION PLAN WAS DEVELOPED THAT CALLED FOR A COORDINATED MULTIMODAL CORRIDOR THAT CALMS TRAFFIC, SUPPORTS WALKING AND BIKING AND STRENGTHENS CONNECTIONS BETWEEN WINDSOR PARK, MUELLER, AND NEARBY PARKS AND TRAILS.
OH, IS THAT IT? I CAN DO THAT.
[00:50:03]
GREEN ONE THERE.SO AS I MENTIONED, THIS PROJECT IS A LONG TIME COMING.
THE VISION PLAN WAS COMPLETED IN 2012.
AN EARLY REVIEW OF ROUNDABOUT CONCEPTS THAT WERE PREVIOUSLY MENTIONED BY, UH, PUBLIC SPEAKERS WERE COMPLETED THAT SAME YEAR, AND VOTERS APPROVED PARTIAL CONSTRUCTION FUNDING VIA A 2012, UH, BOND.
THE PRELIMINARY ENGINEERING WAS COMPLETED IN 2015, AND THAT WAS FOLLOWED BY INITIATION OF DESIGN IN 2017.
AND SO WE ADMITTEDLY HAVE BEEN THROUGH SOME CHALLENGES IN THAT DESIGN, AND WE'VE HAD A SIGNIFICANT CHANGE IN FLOODPLAIN REQUIREMENTS WITH THE ATLAS 14, UH, FLOODPLAIN, UH, REVISIONS.
THAT PROMPTED REDESIGN AND LED TO SOME OF THE EXTENSION OF THE TIMELINE AND THE DESIGN PHASE.
WE ALSO HAD SOME CHALLENGES WITH THE DESIGN CONSULTANT, AND WE ONBOARDED A NEW DESIGN CONSULTANT IN LATE 2024.
AND NOW, OUR TEAM IS WORKING VERY HARD TO DELIVER THIS PROJECT, A MUCH ANTICIPATED PROJECT TO OUR COMMUNITY TO GET TO CONSTRUCTION IN 2027.
SO AS THIS PROJECT HAS A LONG HISTORY, I WANNA DISCUSS HOW THE CURRENT DESIGN HAS EVOLVED TO MEET THE NEW CITY OF AUSTIN CRITERIA WHILE STILL MEETING THE INTENT OF THE 2012 VISION PLAN.
THE VISION PLAN RECOMMENDED THAT THE CITY EXPLORE THE FEASIBILITY OF ROUNDABOUTS.
THIS ANALYSIS WAS COMPLETED BACK IN 2012, AND ROUNDABOUTS WERE NOT RECOMMENDED AT THAT TIME, THEREFORE IT WAS NOT ADVANCED IN THE CURRENT DESIGN.
THE CURRENT DESIGN DOES INCLUDE, HOWEVER, LANDSCAPE MEDIANS CONSISTENT WITH THE VISION PLAN.
THE VISION PLAN ALSO RECOMMENDED ON-STREET PARKING BAYS, WHICH WERE NOT ULTIMATELY INCLUDED DUE TO THE INCREASE IN IMPERVIOUS COVER AND THE AFOREMENTIONED ATLAS 14, UH, FLOODPLAIN REQUIREMENTS.
THE VISION PLAN RECOMMENDED TREE LINE SIDEWALKS, AND THIS HAS BEEN INCLUDED WHEREVER FEASIBLE ALONG THE CURRENT DESIGN.
THAT INCREASE IN IMPERVIOUS COVER WE DISCOVERED DURING THE DESIGN PHASE WOULD TRIGGER ADDITIONAL DRAINAGE AND WATER QUALITY MITIGATION THAT WERE IN EXCESS AND BEYOND THE CURRENT PROJECT FUNDING AND SCOPE.
ON SLIDE FIVE, ON THE RIGHT SIDE IS A SCREEN CLIP OF THE PROPOSED PROTECTED INTERSECTION AT EAST 51ST AND BERKMAN.
EAST 51ST AND BIRKMAN WAS AN INTERSECTION THAT WAS ORIGINALLY CALLED OUT TO EVALUATE THE POTENTIAL FOR A ROUNDABOUT.
AND DON'T GET ME WRONG, I, UH, AM NOT AGAINST ROUNDABOUTS.
THE ONE ON 51ST STREET, CLOSE TO, UH, I-35, I NAVIGATE ALL THE TIME.
HOWEVER, IN AN ALREADY BUILT URBAN ENVIRONMENT, THEY CAN BE CHALLENGING WITH EXISTING UTILITIES, RIGHT-OF-WAY CONSTRAINTS, AND NOW THE NEW, UH, IMPOSED, UH, ATLAS 14 DRAINAGE, UH, REQUIREMENTS.
SO YOU MAY NOTE ON, UH, ON THE RIGHT SIDE THAT THIS IS A FULLY SIGNALIZED INTERSECTION WITH PROTECTED PHASES FOR BIKE CYCLISTS.
SEPARATED BIKE AND PEDESTRIAN FACILITIES ARE WITHIN OUR EXISTING RIGHT OF WAY, AND THERE'S DECREASED PEDESTRIAN CROSSING DISTANCES DUE TO TIGHTER CURB RADII AND A RELOCATION OF THE BIKE PATH, UH, BEHIND THE CURB.
SO A LITTLE BIT MORE HISTORY ABOUT THE ROUNDABOUT, AND WE DID HEAR SOME ADDITIONAL COMMENTARY AT THE, AT THE RECENT JUNE, UH, OPEN HOUSE, UH, REGARDING OUR FINAL DESIGN FOR THE PROJECT, AND ASSISTANT DIRECTOR, UH, MARTIN WILL SHARE THAT WITH YOU MOMENTARILY.
BUT I FIRST WANTED TO, UM, UH, EXPLAIN, UH, THE TRAFFIC ANALYSIS FOR THIS INTERSECTION CALLED FOR A TWO-LANE ROUNDABOUT BASED ON THE, THE EXISTING TRA - AND EXPECTED TRAVEL VOLUMES.
SO THE VISION PLAN CALLED FOR THE CITY TO EXPLORE THIS VISIBILITY.
THE CONSULTANT EVALUATED, AND AGAIN, RECOMMENDED TWO LANE.
THE DESIGN WOULD HAVE REQUIRED RIGHT-OF-WAY ACQUISITION, INCLUDING PARKLAND IMPACTS, AND AS WE ALL KNOW, THAT WOULD TRIGGER CHAPTER 26, UH, MITIGATION COSTS AND REVIEWS.
SO WE'VE RECENTLY ANALYZED AND WE CONCUR WITH THAT PR- PRIOR PREVIOUS ASSESSMENT AND THE PROTECTED INTERSECTION PROPOSED AS A REPLACEMENT,
[00:55:01]
UH, FOR THAT ROUNDABOUT THAT I SHOWED ON THE PRIOR SLIDE.SO TO INCLUDE THE ROUNDABOUT AT THIS STAGE, I THINK I STATED ALREADY SOME OF THE, UH, THE CHALLENGES WITH THAT.
WE WOULD ANTICIPATE THE FOLLOWING.
THE RIGHT OF WAY IMPACTS WOULD POTENTIALLY REQUIRE THE ACQUISITION OF ON AT LEAST NO LESS THAN FOUR PARCELS, POTENTIAL IMPACTS TO EXISTING ACCESS FOR SOME OF THOSE BUSINESSES, POTENTIAL IMPACTS TO PARKLAND, AND AN ACQUISITION IF WE HAD TO GO TO CONDEMNATION OF A MINIMUM OF TWO ADDITIONAL YEARS.
ALSO, THERE'S AUSTIN ENERGY DISTRIBUTION LINE RELOCATIONS THAT WOULD BE TRIGGERED, AND OF COURSE THE AFOREMENTIONED INCREASE IN IMPERVIOUS COVER, WHICH WOULD TRIGGER MAJOR DRAINAGE IMPROVEMENT REQUIREMENTS AND MITIGATION OF WATER QUALITY.
WE DID HEAR, UH, AS I STATED DURING THE SUMMER, UH, SOME FEEDBACK, UH, REGARDING OUR CURRENT, UH, 100% DESIGN.
I'M GONNA ASK ASSISTANT DIRECTOR MARTIN TO SHARE, UH, THE CONTENT OF WHAT WE HEARD.
WE HELD A PUBLIC OPEN HOUSE AT THE AUSTIN ENERGY FACILITY BACK IN JUNE, HAD ABOUT, I DON'T KNOW, 60 TO 70 ATTENDEES, GOT SOME REALLY DETAILED FEEDBACK.
YOU COULD TELL, UM, THE FOLKS THAT CAME THAT DAY ARE REALLY INVESTED NEIGHBORS, TRAVELED THROUGH THERE A LOT AND HAD SOME NUANCED FEEDBACK FOR US.
UH, WE HEARD A LOT ABOUT, UM, THE REQUEST FOR, TO RE-LOOK AT ROUNDABOUTS.
I THINK RICHARD, UH, DIRECTOR MENDOZA HAS COVERED, UM, THAT IN HIS TALKING POINTS.
WE ALSO GOT SOME VERY DETAILED FEEDBACK ABOUT THE PROPOSED BIKE PED PATHS, UM, AS PROPOSED AT 51ST AND BIRKMAN.
UM, OUR PREVIOUS 90% PLAN HAD SOME, UM, MAYBE SOME INIDEAL BIKE PED PATHS THROUGH THE INTERSECTION, AND LOOKING AT THAT FEEDBACK, WE'D BE ABLE TO STRAIGHTEN THOSE OUT AND REALLY, UM, FOCUS IN ON VISIBILITY OF PEDESTRIAN AND CYCLISTS AS THEY'RE WAITING AT THAT TRAFFIC SIGNAL.
WE ALSO HEARD FEEDBACK, UM, ABOUT DESIRES FOR AN ADDITIONAL TRAFFIC SIGNAL AT LANCASTER.
UM, AS PART OF THIS PROJECT, WE'RE GONNA BE INSTALLING ALL THE UNDERGROUND CONDUIT SO THAT WHEN THE DEVELOPMENT COMES IN AT THAT CORNER, THAT SIGNAL CAN BE INSTALLED EFFICIENTLY.
UM, WE ALSO GOT SOME COMMENTS ABOUT THE DESIRE FOR A PHB, UM, PEDESTRIAN HYBRID BEACON AT TILLY.
SO TILLY IS JUST OUTSIDE OUR PROJECT BOUNDARIES, BUT A REALLY IMPORTANT CONNECTION FOR THE KIDS THAT GO TO SCHOOL, UM, IN MUELLER.
UM, WELL, NOT PART OF THIS PROJECT, WE WERE ABLE TO IDENTIFY ADDITIONAL FUNDING, SO WE'RE GONNA BE ADVANCING THAT PEDESTRIAN CROSSING SEPARATELY.
MARTIN? SO FINALLY, OUR SCHEDULE, OUR CURRENT DESIGN SCHEDULE HAS US ON TRACK TO MAKE OUR FINAL RESUBMITTAL FOR PERMITTING IN EARLY 2027.
WE WOULD ADVERTISE FOR BID EARLY NEXT YEAR AFTER RECEIVING THAT CONSTRUCTION PERMIT, AND I EXPECT CONSTRUCTION WHICH BEGAN IN LATE 2027 AFTER GOING THROUGH THE, UH, BIDDING LETTING PHASE.
AND CONSTRUCTION WOULD TAKE ABOUT TWO YEARS.
UM, AGAIN, I JUST WANNA CLOSE, AND I DO APPRECIATE THE COMMUNITY FEEDBACK ON THE PROJECT.
ALSO INCLUDED ON THIS SIGN IS, UH, THE IMPACTS AND DELAY IF WE WERE TO, UH, HAVE TO REVISIT, UH, THE DESIGN FOR SOME OF THOSE, UH, INTERSECTIONS AS STATED.
SO WITH THAT, UH, THAT'S OUR PRESENTATION.
WE'RE OPEN FOR ANY QUESTIONS YOU MIGHT HAVE.
QUESTIONS FROM THE COMMITTEE MEMBERS? LET'S START WITH VICE CHAIR CADRE OR...
OH, YOU WANT ME TO START? GO FOR IT.
UH, THANK YOU FOR THE PRESENTATION.
AGAIN, THIS IS A PROJECT I'VE BEEN FOLLOWING FOR A LONG, LONG, UH, TIME.
UH, LET ME START WITH A VERY KIND OF PRACTICAL QUESTION.
UH, 2000, THIS IS A 2012 BOND-FUNDED PROJECT.
UH, UH, THERE'S A LOT OF OLDER BOND-FUNDED PROJECTS THAT ARE, UH, SCRAPING FOR DOLLARS TO ACTUALLY ACHIEVE WHAT THE, UH, OR- ORIGINAL BOND INTENDED TO ACHIEVE.
HOW MUCH WIGGLE ROOM DO WE HAVE IN TERMS OF FINANCIAL WIGGLE ROOM, UH, LEFT FOR THE- THE...
IN TERMS OF THE BOND MONEY? COUNCIL MEMBER, THAT'S A VERY FAIR QUESTION.
UH, THIS PROJECT DID SIT IDLE FOR A NUMBER OF YEARS WHEN I ASSUME MY PRESENT POSITION IN TRANSPORTATION, UM, SEEKING ADDITIONAL CONSTRUCTION FUNDING.
IT WAS ONLY PARTIALLY FUNDED IN 2012 AS THE DESIGN PROGRESSED AND, UH, COST ESCALATIONS INCURRED, ESPECIALLY POST-PANDEMIC.
UM, WE ACTUALLY HAD A FUNDING GAP THAT WE WERE, UM, SEARCHING THE CUSHIONS, FOR LACK OF A BETTER TERM, TO FIND.
[01:00:01]
IT, IT'S REALLY A TIGHT BUDGET AT THIS POINT.WELL, UH, AND I, I, I APPRECIATE THAT.
UH, AND MY, AND, AND I'M, I'M AN OPTIMIST.
I, I, I, YOU KNOW, WANNA ALWAYS KINDA EMPHASIZE AS A POSITIVE, BUT LET ME KIND OF CHANGE GEARS HERE A LITTLE BIT AND START WITH MY FEARS.
UH, UH, ONE IS THAT REDESIGN, YOU KNOW, A- ADDITIONAL, UH, CHANGES ARE GONNA RAISE THE COST AND THEN WE DON'T ULTIMATELY HAVE A FUNDED PROJECT TO MOVE FORWARD.
IN OTHER WORDS, I'D RATHER HAVE, TAKE HALF A LOAF THAN A FULL LOAF, AND, YOU KNOW, I'LL TAKE IT EVERY SINGLE TIME.
UH, RIGHT NOW, IT'S NOT A GOOD STREET IN, IN TERMS OF THE, THE, THERE'S A LOT OF, UH, HIGH SPEEDS.
UH, THE PEDESTRIAN EXPERIENCE IS NOT VERY GOOD.
UM, THE, YOU KNOW, BICYCLE, UH, THERE ARE BICYCLE PATHS, BUT THEY'RE NOT PROTECTED AND THEY'RE, THEY'RE, YOU KNOW, A LOT OF PEOPLE WOULD NOT FEEL COMFORTABLE, UH, UH, RIDING ON THEM.
AND THEN, UH, YOU KNOW, MY OTHER FEAR, AND AGAIN, THINKING ABOUT THE, UH, THE, THE, UH, GOING FROM, UH, FOUR LANES DOWN TO THE TWO LANE, UH, WITH, UH, THE, THE TURNING LANE, UM, UH, NO, AND, AND ACTUALLY I SAW, UH, UH, UH, MR. UH, TUCKER FERGUSON, UH, UH, HERE.
UH, TXDOT IS ABOUT TO REDO THE, UH, WAY I-35 ACCESS ROAD KIND OF FEEDS INTO THIS ENTIRE PART OF TOWN.
UH, AND MY CONCERN, AND, AND I'LL, THIS IS THE CONCERN THAT HAS BEEN CONVEYED TO ME FROM A LOT OF PEOPLE, UH, PARTICULARLY IN WINDSOR PARK, UH, IS THAT THEY DON'T WANT TRAFFIC, THEY WANT TRAFFIC STAYING ON 51ST AND NOT CUTTING THROUGH EAST-WEST TRAFFIC, CUTTING THROUGH THE, UH, THE WINDSOR PARK.
SO THAT, I HAVE TO PUT THAT OUT THERE ALSO AS, AS I WANNA BE VERY KIND OF CAUTIOUS ABOUT THE REDESIGN GIVEN FUTURE MAJOR CHANGES THAT ARE GONNA BE, UH, UH, COMING, UH, DOWN THE ROAD.
UM, WITH THAT, UH, AND AGAIN, I APPRECIATE STAFF HAS BEEN VERY AGGRESSIVE ON THE ROAD DIETS.
UH, CAMERON, I THINK THAT WAS A GREAT PROJECT.
WE'RE, WE'RE GETTING NEAR THE END OF, UH, CAMERON.
AND, AND AGAIN, THAT, THAT I THINK IT'S JUST A TREMENDOUS PROJECT.
WE HAVE NOT SEEN ADDITIONAL TRAFFIC DELAYS.
I THINK ABOUT MARTIN SPRINGS, UH, I THINK ABOUT NORTH LOOP, UH, MULTIPLE, UH, STREETS IN DISTRICT FOUR THAT I CAN THINK OF WHERE WE'VE BEEN ABLE TO DO THAT ROAD DIDE AND IT'S BEEN TREMENDOUSLY, UH, SUCCESSFUL.
UM, GIVEN STAFF'S HISTORY AND BEING AGGRESSIVE IN, IN TERMS OF GOING AFTER THESE PROJECTS AND, AND COMMITTING TO THOSE, UH, ROAD DIETS, UH, IT GIVES ME PAUSE THAT Y'ALL DON'T WANNA DO THE, THE, YOU KNOW, GO FROM FOUR TO, TO, YOU KNOW, TWO LANES AND A TURNING LANE HERE.
WH- WHAT IS THE THINKING THERE IN TERMS OF, YOU KNOW, HOW, HOW BUSY DOES THE STREET HAVE TO BE THE TRAFFIC COUNTS WHERE WE'RE GONNA SAY, LIKE, "THIS IS NOT APPROPRIATE FOR A TWO LANE?" COUNCIL MEMBER, I'M GONNA ASK ASSISTANT DIRECTOR MARTIN TO ADDRESS THE, UH, THE TRAFFIC MODELING.
BUT BEFORE THAT, I DO WANNA SPEAK TO YOUR HALF LOAF VERSUS FULL LOAF
UH, OUR STAFF FEELS VERY CONFIDENT THAT THIS DESIGN WILL AFFECT THE DESIRED IMPROVEMENTS IN TERMS OF, UH, MULTIMODAL, UH, SAFETY FOR OUR COMMUNITY.
WOULD A ROUNDABOUT BEEN NICE? YES, IT WOULD'VE BEEN VERY NICE.
HOWEVER, IT'S NOT, THAT'S NOT THE ONLY, UM, UM, YOU KNOW, WAY TO AFFECT THESE MUCH NEEDED SAFETY IMPROVEMENTS.
AND, UH, WE DO, WHEN WE DO EVALUATE ROADWAYS, WE DO THE RE- REQUISITE, UH, TRAFFIC MODELING AND, UH, TO ENSURE WE MAINTAIN A BALANCE ACROSS ALL MODES OF TRANSPORTATION TO INCLUDE VEHICULAR MODES.
UH, BUT WITH THAT, ANNA, IF YOU WANT.
AND, AND A REAL QUICK COMMENT ON THE, THE ROUNDABOUT AT 51ST AND BERKMAN IN PARTICULAR, UH, I'M ALSO A FAN OF THAT WE'VE GOT THE PARKFIELD IN RUTLAND, A ROUNDABOUT THAT JUST WENT OUT.
NO, IT'S ON THIS COMING AGENDA, RIGHT? YEAH.
UH, AND AGAIN, I THINK THAT'S GONNA BE A SOLID DESIGN.
I, I WILL SAY FROM MY PERSONAL EXPERIENCE AND FROM WHAT, UH, UH, BICYCLISTS IN PARTICULAR HAVE COMMUNICATED TO ME ABOUT THE 51ST AND I-35 ROUNDABOUT, A LITTLE TRICKY.
I THINK IT WORKS FOR VEHICLES VERY WELL.
A LITTLE TRICKY FOR, I THINK, BICYCLISTS IN PARTICULAR.
UH, THAT ALSO GIVES ME PAUSE ABOUT A 51ST AT BERKMAN BECAUSE THAT'S A VERY BUSY INTERSECTION WITH A LOT OF TRAFFIC FLOWING IN A, IN A LOT OF DIFFERENT, UH, DIRECTIONS.
AND AGAIN, I THINK ABOUT THE PEDESTRIAN EXPERIENCE.
I'M NOT SURE, UH, HOW THAT PLAYS IF, IF WE WERE TO GO TO A ROUNDABOUT THERE.
I'LL, I'LL SPEAK QUICKLY TO THE LANE CONVERSION QUESTION.
WE ARE, UH, CITY OF AUSTIN IS A LEADER IN, UM, REPURPOSING LANES FOR, TO SERVE ALL MODES AND TO DO SO SAFELY.
WE ARE ALSO INCREDIBLY CAREFUL BECAUSE WE KNOW THAT ONE PROJECT THAT DOESN'T WORK AND HAS IMPACTS ON THE COMMUNITY WILL, MIGHT BE OUR LAST FOR A WHILE.
SO THIS ONE REALLY GAVE US PAUSE, A LOT TO DO WITH, UM, WHAT'S HAPPENING AT I-35.
AND WE'VE SEEN THE HISTORY OF TRAFFIC VOLUMES IN THAT AREA APPROACHING, YOU KNOW, 30,000 TO 35,000, WHICH IS VERY HIGH.
UM, YOU PROBABLY KNOW THAT EAST OF BIRKMAN,
[01:05:01]
UM, TRAFFIC VOLUMES SIGNIFICANTLY DIE DOWN AND WE HAVE SUCCESSFULLY CONVERTED THAT TO A TWO-LANE SECTION.SO, UM, W- WE, WE HAVE VERY SMART TRAFFIC ENGINEERS.
WE'RE VERY CAREFUL ABOUT WHERE WE USE THAT TOOL.
AND, UM, WE FEEL LIKE WE CAN MEET OUR CITY GOALS WITH THE PLAN WE HAVE FOR 51ST STREET.
IT SAFELY ACCOMMODATES ALL MODES.
AND DO YOU HAVE A SENSE OF WHAT, WHAT'S THAT MAXIMUM NUMBER OF TRAFFIC VOLUME WHERE YOU FEEL COMFORTABLE GOING FROM A FOUR TO, YOU KNOW, TWO LANE PLUS A TURNING LANE? AND, AND, AND WHERE ARE YOU UNCOMFORTABLE? YEAH, I DON'T WANNA NECESSARILY STATE A MAXIMUM NUMBER.
IT REALLY DEPENDS ON THE NUMBER OF, UM, INTERSECTIONS YOU HAVE IN THE MIDDLE, THE NUMBER OF TRAFFIC SIGNALS, WHAT THE TURNING MOVEMENTS LOOK LIKE.
UM, IF I HAD TO GIVE A RANGE, I WOULD SAY IN THE 20 TO 25,000 RANGE IS THE, THE HIGHEST THAT WE'VE DONE HISTORICALLY.
AND THE OTHER THING THAT, THAT I THINK ABOUT AND THAT KIND OF CONCERNS ME IS THAT WE HAVE A, A HUGE BLOCK, UH, THAT IS RIGHT NOW EMPTY - UH-HUH.
ON 51ST AND CAMERON, UH, BETWEEN, UH, 51ST AND 52ND AND CAMERON AND LANCASTER.
UH, AND THAT'S PROBABLY GONNA HAVE, I MEAN, HOPEFULLY LIKE 1500 UNITS AND, YOU KNOW, EVENTUALLY THERE WILL BE A LARGE MIXED USE PROJECT THERE WITH A GROCERY STORE.
SO AGAIN, WHEN, AS WE KINDA THINK ABOUT, UH, TRAFFIC VOLUMES, I, I KNOW THAT THAT'S GONNA CHANGE AT THAT CORNER THERE OF, UH, OF 51ST AND, AND, AND CAMERON, UH, UH, QUITE A BIT.
UM, A- A- AGAIN, I APPRECIATE ALL OF THE, THE, THE, THE WORK THAT HAS GONE INTO IT.
UH, I, I WOULD SAY, AGAIN, GIVEN, I KNOW A LOT OF FOLKS ARE VERY MUCH, UH, PUSHING FOR THAT, THAT, YOU KNOW, TWO LANE, UH, THAT FOUR LANE TO TWO LANE CONVERSION.
UH, AGAIN, I, I, THERE IS SOME URGENCY, OBVIOUSLY WE WANNA MOVE FORWARD ON THE PROJECT, BUT IT WOULD, IT WOULD BE GREAT TO KIND OF JUST, UH, UH, REALLY UNDERSTAND THAT A- A- AND AGAIN, I DON'T WANNA UNNECESSARILY DELAY ANYTHING BY ANY MEANS, BUT, UH, UH, UH, PERHAPS A MEMO, YOU KNOW, SOMETHING LIKE THAT, UH, UH, THAT COULD, UH, UH, DISCUSS MAYBE SOME OF THOSE, UH, UH, THEMES FOR, FOR BOTH FOR COUNCIL AND FOR THE, THE GENERAL PUBLIC.
UH, AND, UH, I'LL LEAVE IT THERE.
I WANNA THANK Y'ALL FOR THE PRESENTATION.
ALSO WANNA THANK, UM, ALL THE D9ERS WHO CAME OUT IN THIS WEATHER.
I DON'T KNOW IF IT'S STILL RAINING ON ALL MY GLASSES, BUT IT'S, IT'S RAINING A LOT THE NEXT FEW DAYS, SO THANK Y'ALL FOR COMING ON OUT.
UM, YOU KNOW, I'VE BEEN HEARING ABOUT THIS BOTH AS A, BOTH AS A COUNCIL MEMBER, BUT ALSO A RESIDENT, UM, NEAR THE AREA, LIVING IN THE ILLER NEIGHBORHOOD.
UM, SO VERY MUCH WANNA GET AS MANY ANSWERS AS, AS POSSIBLE AND GET CLARITY, UH, FROM THE COMMUNITY.
UH, BUT ONE OF THE GOALS STATED IN THE PRESENTATION IS PARALLEL PARKING OPTIONS ON THE STREET.
AND I KNOW OUR GOALS ARE ALWAYS TO HAVE SAFER STREETS AND CALMER TRAFFIC.
SO MY FIRST QUESTION IS, CAN YOU TELL US MORE ABOUT THE EXPECTATIONS OF THE CRASH REDUCTIONS, SPEED REDUCTIONS, ET CETERA, EXPECTED AS A RESULT OF THE STREET DESIGN? AND THEN COULD YOU TELL US MORE ABOUT THE METRICS THAT WE SHOULD EXPECT? FOR THIS PARTICULAR DESIGN CON - UH, COUNCIL MEMBER, UM, I CAN ONLY SHARE THAT OUR EXPERIENCE ON, UM, SIMILAR INTERSECTION SAFETY IMPROVEMENTS OF WHICH THIS PROJECT WILL PROVIDE.
UH, WITH OUR VISION ZERO PROGRAM, UH, WE'VE, WE'VE DONE, UM, QUITE A FEW INTERSECTION IMPROVEMENT PROJECTS AROUND THE CITY.
AND AT THOSE INTERSECTIONS WITH SIMILAR TYPE TREATMENTS, WE'RE SEEING BETWEEN 30 AND 37% REDUCTION IN FATALITIES AND SERIOUS INJURIES.
AND, UH, WE DO TRACK OUR VISION ZERO, UH, METRICS ON A MONTHLY BASIS.
UH, AND WE'RE CONTINUING TO SEE IMPROVEMENT IN THOSE ON THE DECLINE THAT I FEEL IT'S A PRODUCT, NOT JUST OF THE INFRASTRUCTURE IMPROVEMENTS WE'RE MAKING, BUT ALSO IN JUST THE, UH, ATTITUDES OF OUR, OUR PUBLIC, THE EDUCATION THAT WE'RE DOING, THE CAMPAIGNING TO BE, UH, MORE AWARE OF VULNERABLE USES OF OUR RIGHT OF WAY.
UH, SO I WOULD NOT, UH, EXPECT ANYTHING DIFFERENT, UH, RESULTS FROM THIS IMPROVEMENT PROJECT.
AND THEN WHAT WAS, WAS A CONVERTIBLE OUTSIDE LANE EXPLORED AS PART OF NON-PEAK OPERATIONS TO HAVE PARALLEL PARKING ON THE STREET AND REDUCED SPEEDING? IT HAS NOT BEEN EXPLORED TO DATE.
THAT'S SOMETHING WE COULD CERTAINLY KEEP IN MIND IN THE FUTURE.
I'D SAY RIGHT NOW, THERE'S NOT NECESSARILY THE, UM, FRONT-FACING RETAIL THAT REALLY DRIVES THAT ON-STREET PARKING DEMAND, BUT IF THAT CHANGES IN THE FUTURE, THAT'S SOMETHING THAT COULD BE LOOKED AT.
AND THEN THE COMMUNITY HAS CONCERNS ABOUT THE NEED FOR TWO LANES IN EACH DIRECTION.
I THINK WE'VE HEARD THAT, UM, YOU KNOW, TODAY AND, AND HAVE HEARD THAT THROUGHOUT.
ACCORDING TO, TO SAFE STREETS, THE LAST RECORDED, UH, AVERAGE DAILY TRAFFIC COUNT, WHICH IS FROM 2015 ON BARTON SPRINGS ROAD BEFORE THAT STREET WAS CONVERTED
[01:10:01]
FROM FOUR TO TWO LANES WAS JUST OVER 24,000.THE 20, 25 ANNUAL TRAFFIC ON 51ST STREET WAS JUST UNDER 25,000.
SO IF WE, SO IF WE COULD GO FROM FOUR TO TWO LANES ON BARTON SPRINGS ROAD, WHY NOT ON 51ST STREET? YEAH, THAT'S A, THAT'S A FAIR QUESTION, AND I DON'T HAVE ALL THE DETAILED TRAFFIC ANALYSIS IN FRONT OF ME, BUT I WAS SAYING IT'S NOT A ONE SIZE FITS ALL.
A 4-2 CONVERSION IS NOT A ONE-SIZE-FITS-ALL APPROACH.
IT REALLY DEPENDS ON, UM, THE TURNING MOVEMENTS ON AND OFF THE STREET, UH, HOW MANY OF THE INTERSECTIONS THERE ARE, UH, HOW MUCH RIGHT OF WAY YOU HAVE, AND IF THAT, UM, THE BARTON SPRINGS PILOT WAS IN RESPONSE TO A, A TERRIBLE CRASH, RIGHT? AND WE DIDN'T HAVE ANOTHER WAY TO CALM THE STREET.
WE DIDN'T HAVE ANOTHER WAY TO PROVIDE PROTECTED BIKE LANES FOR A REALLY HIGH USE AREA.
THIS IS A LONG-TERM CIP PROJECT, UM, THAT IS CONSISTENT WITH THE ASMP.
UH, WE'RE ABLE TO PROVIDE PROTECTED BIKE AND, AND PEDESTRIAN PATHS ON BOTH SIDES OF THE S- STREET, ACCESS MANAGEMENT, ALL THE ELEMENTS THAT WE WANNA SEE IN AN IDEAL CORRIDOR.
SO I WOULD SAY IT'S NOT A ONE SIZE FITS ALL APPROACH, UM, BUT THIS WILL BE A VAST IMPROVEMENT FOR 51ST STREET.
AND THEN ONE QUESTION, IT'S, IT'S MORE OUT OF CURIOSITY.
IT'S NOT A, IT'S NOT A TECHNICAL QUESTION, IT'S NOT A POLICY QUESTION, BUT COULD YOU SPEAK ON WHY THIS HAS TAKEN SO LONG? AND I, I, I'VE DONE SOME DIGGING ON MY OWN.
UM, I, I'VE REQUESTED, UM, SOME INFORMATION AND IT SEEMS LIKE THERE'S, THERE'S BEEN, YOU KNOW, POOR CONSULTANT PERFORMANCE.
IT SEEMS LIKE THERE'S BEEN MISMANAGEMENT OF THE, OF, OF THE, OF THE PROJECT TO A DEGREE BY, BY FORMER SUPERVISORS WHO ARE NO LONGER WITH THE CITY OF AUSTIN WHO HAVE, WHO HAVE BEEN FIRED.
UM, COULD, COULD YOU ELABORATE WHY, W- WHAT THE MESS IS? OKAY.
COUNCIL MEMBER, I'LL TAKE THAT.
I WAS ORIGINALLY HIRED, UM, AU - IN AUSTIN AS THE PUBLIC WORKS DIRECTOR IN 2017.
UH, AT THAT TIME, I WAS OVER THE CAPITAL DELIVERY DIVISION, WHICH, UM, HAD THE PROJECT MANAGER OVER THIS PROJECT.
UM, YOU KNOW, THIS PROJECT IS, IS NOT UNLIKE, UH, SOME OF THE OTHER CORRIDOR PROJECTS WE'VE HAD CHALLENGES WITH, NAMELY, AND WE'VE TAKEN LESSONS LEARNED.
UH, NAMELY, WE FUNDED IT ONLY F - PARTIALLY FOR CONSTRUCTION WITHOUT A MORALLY FULLY BAKED, UH, PRELIMINARY ENGINEERING REPORT TO UNDERSTAND WHAT ARE, WERE GOING TO BE ALL THE CONSTRAINTS THAT WE WERE GONNA ENCOUNTER ONCE WE MOVED INTO FINAL DESIGN AND CONSTRUCTION.
UM, YOU KNOW, THIS WAS AN ALREADY VERY BUSY, UH, ROADWAY.
IF WE HAD TO LOOK BACK, UM, WE LIKELY WOULD HAVE NOT FUNDED THE CONSTRUCTION AT SOME POINT AND SET EXPECTATIONS UNTIL WE HAD A CLEAR PICTURE OF WHAT ALL OF THE OBSTACLES WE WERE GONNA ENCOUNTER FOR THIS MUCH NEEDED IMPROVEMENT PROJECT, NAMELY IN RIGHT OF WAY, UH, DRAINAGE, UH, UTILITIES.
UM, IN, YOU KNOW, IN RETROSPECT, COULD WE HAVE DONE BETTER? OF COURSE, WE COMMIT TO DOING BETTER GOING FORWARD.
UM, WHEN I DID SWITCH ROLES INTO THE TRANSPORTATION, UH, DIRECTOR, THE PROJECT WAS DORMANT.
IN SEEKING ADDITIONAL FUNDING, I WAS ABLE TO LOCATE SOME, UH, CAPITAL, UH, FUND ACCOUNTS THAT WERE, THAT WERE NOT, UH, ENCUMBERED.
MS. MARTIN, HER TEAM HAS, HAVE TAKEN THAT BATON AND, UH, A- AND MOVED FORWARD, UH, WITH, WITH HASTE ON THE PROJECT.
GOT A QUESTION ABOUT STREET TREES.
SOME FOLKS HAVE BEEN TALKING ABOUT JUST SOME OF THE CONFLICTS WITH UTILITIES AND, AND OTHER THINGS THAT EXIST IN THE RIGHT OF WAY.
CAN YOU TALK US THROUGH WHAT THE EXPECTATIONS ARE, WHAT THE PLAN IS TO, UM, IN THEORY, HAVE A CORRIDOR THAT LOOKS THE SAME ON BOTH SIDES THAT WOULD BE WELCOMING? YEAH, GREAT QUESTION.
UM, WE RECEIVE THAT COMMENT A LOT FROM THE COMMUNITY.
UM, OUR PLAN TODAY INCLUDES A LOT OF NEW STREET TREES ON THE SOUTH SIDE OF 51ST STREET, AS WELL AS IN THE MEDIAN.
UM, ON THE NORTH SIDE, THERE'S EXISTING AUSTIN ENERGY LINES AS WELL AS SOME UNDERGROUND UTILITIES THAT MAKE IT CHALLENGING TO HAVE, UM, THE SAME AMOUNT OF TREES ON THE NORTH AS WE SEE ON THE SOUTH.
SO WE'RE PLANTING, UM, WHAT WE CALL UTILITY COMPATIBLE TREES WHEREVER WE'RE ABLE TO ON THE NORTH SIDE AS WELL.
ANY IDEA, ROUGHLY, IS IT LIKE A TWICE AS MANY ON THE SOUTH END AS ON THE NORTH END? I COULD NOT SAY, BUT HAPPY TO FOLLOW UP.
ADDITIONALLY, COUNCIL MEMBER, UH, YOU'RE AWARE WITH, UH, THE GREEN INFRASTRUCTURE INITIATIVE, WE'VE BEEN WORKING VERY CLOSELY, UH,
[01:15:01]
WITH OUR UTILITY PARTNERS TO GAIN, UH, ALLOWANCES, IF YOU WILL, CLEARANCE ALLOWANCES, UH, TO AFFECT MORE PUBLIC STREET TREES.AND, UH, THEY'VE BEEN VERY COOPERATIVE AND WE LOOK FORWARD TO CONTINUING THAT PARTNERSHIP GOING FORWARD.
I APPRECIATE THAT, UH, HEARING THAT.
IS THE INFRASTRUCTURE RIGHT NOW, ARE THE ENERGY LINES ABOVE GROUND OR ARE THEY BURIED? THEY'RE ABOVE GROUND? YES, THEY'RE ABOVE GROUND.
AND THEY'RE BURIED ON THE OTHER SIDE? UH - OR ARE THEY ALL ABOVE GROUND? YEAH, WE ALSO HAVE BELOW GROUND UTILITIES ON THE NORTH SIDE AS WELL.
SO SQUEEZING TREES IN BETWEEN THE ABOVE GROUND AND THE BELOW GROUND WAS VERY CHALLENGING.
IF OUR, UH, REQUIREMENTS OR SEPARATION REQUIREMENTS CHANGE IN THE FUTURE, IT'S SOMETHING WE COULD REVISIT.
I KNOW WE'VE HAD A WHOLE LOT OF CONVERSATIONS IN DIFFERENT PARTS OF TOWN, JUST WHAT IT LOOKS LIKE TO BE ABLE TO DO STREET TREES AND PERMITTING AND NOT INTERFERE WITH UTILITIES AS THE ROOTS GROW OR HAVING TO HAVE MORE TREE TRIMMING FOR VEGETATIVE REASONS WITH AUSTIN ENERGY LINES.
DID YOU HAVE OTHER QUESTIONS? ALL RIGHT.
WE WILL, IN A COUPLE MINUTES, NEED TO MOVE TO THE OTHER ITEM, BUT I WANNA MAKE SURE THAT WE'RE GETTING ALL OUR QUESTIONS HEARD.
SO HOW ABOUT COUNCIL MEMBER LANE AND THEN MAYOR POTEMBELA WILL CLOSE US OUT? OKAY, GREAT.
UM, SO THERE'S SOME PRETTY SIGNIFICANT COST DRIVERS THAT ARE, YOU KNOW, THAT HAVE INCREASED SIGNIFICANTLY.
AND, AND WE HAVE HEARD FROM EVEN HERE THE COMMUNITY TALKING ABOUT HOW MUCH ARE WE MOVING THE NEEDLE THROUGH THIS PROJECT VERSUS SOME OF THE OTHER PROJECTS.
UM, WHICH LEADS ME TO ASK, I MEAN, FROM 2012 TO NOW, PLUS ADD ON WATERSHED AND DRAINAGE AND ALL OF THIS, IT LEADS ME TO ASK IF WE WEREN'T TRYING TO SEARCH UNDER THE COUCH CUSHIONS AND FIND THE MONEY AND, AND DELIVER SOMETHING, WHICH I VERY MUCH APPRECIATE THE EFFORTS TO DO THAT, BUT IF WE WEREN'T TRYING TO DO THAT, WHAT WOULD BE LIKE THE NEXT THING THAT WOULD GET ADDED BACK THAT IS A COMMUNITY PRIORITY OR THE NEXT COUPLE OF THINGS? CAN YOU CLAR - DO YOU MEAN - YES.
ADDITIONS TO THIS PROJECT OR OTHER CITY PRIORITIES? SO YES, I CAN CLARIFY.
SO, UM, WE'VE KEPT THIS PROJECT WHERE WE CAN AFFORD IT, RIGHT? AND WE'RE MAKING SIGNIFICANT IMPROVEMENTS IN A WAY THAT'S AFFORDABLE.
WE'RE NOT ACQUIRING RIGHT OF WAY.
I MEAN, THERE HAVE BEEN A LOT OF DIFFERENT...
WE'RE NOT DOING VAR- VARIOUS THINGS, BUT WE'VE ALSO HEARD FROM OUR COMMUNITY THAT THEY'RE NOT AS HAPPY WITH HOW FAR, HOW MUCH OF AN IMPROVEMENT WE'RE MAKING.
AND SO I'M WONDERING, LIKE, HOW MUCH DID THE NEED TO COST, KEEP COSTS DOWN, IMPACT THE SOLUTION? WERE THERE OTHER THINGS THAT WE MIGHT BE SEEING IF THERE WERE MORE FUNDS AVAILABLE? YEAH, I THINK I UNDERSTAND YOUR QUESTION NOW.
UM, WE'RE, WE'RE PROPOSING A PROJECT THAT IS FULLY COMPLIANT WITH THE TRANSPORTATION CRITERIA MANUAL, A PROJECT THAT I'M REALLY EXCITED OF, EXCITED ABOUT AND PROUD OF THAT REALLY IS A MODEL FOR OTHER CORRIDORS.
SO I DON'T THINK ANYTHING HAS BEEN CUT FROM THE SCOPE THAT IS NECESSARY TO, UM, ADVANCE OUR GOALS ON THIS CORRIDOR.
AND THEN ONE MORE FOLLOW-UP ON THE, ON THE STREET TREES.
I KNOW THAT IS A MORE NEW INITIATIVE, AND IS THERE, IS THERE PERHAPS ANY SPACE WHERE VARIANCES COULD HELP ACCOMPLISH A LITTLE BIT MORE OF WHAT THE COMMUNITY'S LOOKING FOR? I CAN GO BACK TO THE TEAM WITH THAT.
I THINK WE'VE BEEN REALLY AGGRESSIVE IN GETTING A TREE EVERYWHERE WE CAN, AND WE'RE, WE CONTINUE TO PUSH THE NEEDLE THERE.
UM, AND WE'LL TALK AGAIN TO THE TEAM.
ALL RIGHT, MAYOR PROTEL, GO FOR IT.
UH, THE QUICK COMMENT, I'M SORRY, UH, UH, ASSISTANT CITY MAYOR RICHARDS, I KNOW YOU, YOU JOINED US AND...
YEAH, TH- TH- THANK YOU SO MUCH, AND, AND THANK YOU FOR ALLOWING ME THE OPPORTUNITY TO JUST JUMP IN.
AND THERE'S BEEN A COUPLE OF, OF QUESTIONS RELATED TO BOND PROJECTS AND BEING THAT, YOU KNOW, THIS WAS A, A 12 PROJECT, AND WE ALL KNOW THERE'S STILL 16 PROJECTS THAT ARE OUT THERE.
AND I WANTED TO JUMP IN BECAUSE WE, WE HAVE TO ACKNOWLEDGE, AND WE DO AS CITY STAFF, THAT THERE WERE MISTAKES THAT WERE DONE AT THAT PARTICULAR TIME.
BUT I THINK IT'S IMPORTANT TO UNDERSTAND THAT WE HAVE, UM, ASSESSED AND REASSESSED AND LOOKED AT ALL OF THOSE ISSUES THAT WE'VE HAD IN THE PAST.
AND I, I DO TRULY BELIEVE WITH THE, THE CREATION OF CAPITAL DELIVERY SERVICES THROUGH THE, UM, WORK THAT HAS BEEN DONE TO, UM, UH, LOOK AT PROJECTS IN THE INITIAL PHASE NOW, UM, UNDERSTANDING THE TRUE COST AND, AND WORKING WITH OUR, OUR BOND ADVISORY COMMITTEE, WE HAVE ADDRESSED MANY OF THOSE ISSUES THAT WE HAD, AND THAT'S WHY YOU ARE NOW SEEING A LOT OF THESE PROJECTS THAT HAVE BEEN STALLED FOR A LONG TIME ACTUALLY COMING TO FRUITION, AND MANY OF THESE PROJECTS THAT WE'VE GOTTEN BACK ON SCHEDULE ARE COMING
[01:20:01]
IN ON TIME AND ON BUDGET.SO I DO WANNA ACKNOWLEDGE THAT THERE WERE, THERE WERE ISSUES THEN, AND WE HAVE REALLY TAKEN A LOT OF TIME AND EFFORT AND HEARD OUR COMMUNITY TO TRY TO ADDRESS THOSE ISSUES TO GET THESE PROJECTS DELIVERED AS QUICKLY AS POSSIBLE NOW.
UH, THANK YOU, UH, UH, ASSISTANT CITY MAYOR RO- ROGERS.
UH, I, YOU KNOW, WHEN I CAME IN IN 22, THERE WERE A BUNCH OF THINGS STALLED.
UH, I DON'T WANNA SAY ALL OF THEM.
I, I CAN'T, YOU KNOW, BUT VIRTUALLY ALL OF THEM THAT I CAN THINK OF WHEN I THINK ABOUT IN MY HEAD OF THE, THE STALLED TRANSPORTATION PROJECTS FROM A DISTRICT FOUR PERSPECTIVE ARE EITHER BEING EXECUTED OR ABOUT TO BE EXECUTED.
AND, AND AGAIN, I, I, UH, APPRECIATE THAT, UH, VERY MUCH.
UM, COUPLE OF QUICK, THAT ENTIRE BLOCK, UH, AGAIN, BETWEEN LANCASTER AND CAMERON, UH, I KNOW THAT THERE'S UTILITIES, UH, UNDERNEATH THE, THE SIDEWALK UNDER THE STREET RIGHT THERE, AND, BUT THERE ARE...
AND WE'LL LET THEM GET TO SITE PLAN AND ALL THAT KIND OF STUFF, BUT THERE'S AN OPPORTUNITY TO PLANT TREES ON PRIVATE PROPERTY THERE, UH, TOO, THAT, THAT WOULD EFFECTIVELY GROW UP AND OVER THE, UH, THE BIKE LANE.
AND SO I JUST WANTED TO, TO PUT THAT OUT THERE AS, UH, AS THAT PROPERTY STARTS TO, TO GET READY TO GO THROUGH THE DEVELOPMENT PROCESS.
I THINK, UH, THERE'S SOME, SOME, UH, POSSIBILITIES THERE.
UM, UH, FINALLY, LAST QUESTION, UH, THE, THE GOLF CARTS WAS, WAS MENTIONED, AND I'VE SEEN THEM NOT NECESSARILY IN, IN MY DISTRICT SO MUCH, BUT I'VE SEEN THEM A LOT, UH, UH, JUST SOUTH OF 51ST THERE IN THE, IN THE, UH, UH, MUELLER, UH, NEIGHBORHOOD.
UH, LEGAL, WHAT, WHAT, YOU KNOW, WHAT, WHAT ARE THE ROLE OF, OF, OF GOLF CARTS THERE? YOU KNOW, W- WHAT'S GOING ON WITH, UH, THE, THE GOLF CART SITUATION?
SO WE CAN PROBABLY FIND THAT ANSWER OFFLINE.
IF THERE ARE NO OTHER QUESTIONS, LET'S MOVE
[5. Updates on the Equitable Transit-Oriented Development Implementation, a planning approach that places jobs, housing, goods, and services within walking and biking distance of transit stops to help communities reduce car use while providing them with more transportation options. [Warner Cook, Principal Planner - Austin Planning]]
ON TO ITEM NUMBER FIVE, UPDATES ON THE EQUITABLE, EQUITABLE TRANSIT-ORIENTED DEVELOPMENT IMPLEMENTATION, OR ETOD.AND THANK YOU FOR NOT PRINTING THE ENTIRE POSTING LANGUAGE ON YOUR FIRST SLIDE, BECAUSE IT WOULD'VE BEEN REALLY TINY FONT.
GOOD AFTERNOON, CHAIR AND MOBILITY COMMITTEE MEMBERS, AND YES, IT'S QUITE A MOUTHFUL, EQUITABLE TRANSIT-ORIENTED DEVELOPMENT OR ETOD.
UM, WE SOMETIMES RUN INTO CHARACTER LIMITS,
I'M A PRINCIPAL PLANNER WITH AUSTIN PLANNING, AND I LEAD OUR SYSTEM-WIDE ETOD WORK PROGRAM.
UH, WE COORDINATE WITH FOLKS IN DEPARTMENTS AND AGENCIES ACROSS THE COMMUNITY TO REACH THE ETOD GOALS, SO I AM BY NO MEANS THE ONLY PERSON THAT WORKS ON THIS, JUST HERE TO GIVE YOU AN OVERVIEW TODAY.
SO FOR FOLKS THAT MAY BE NEWER TO OUR COMMUNITY, I WANTED TO GO THROUGH WHAT ETOD IS.
IT BUILDS UPON TRADITIONAL TRANSIT-ORIENTED DEVELOPMENT, WHICH FOCUSES ON PLACING JOBS, HOUSING, UH, AND OPPORTUNITIES WITHIN WALKING AND BIKING DISTANCE OF TRANSIT.
THE PRIMARY OBJECTIVE OF ETOD, HOWEVER, IS TO GO BEYOND THAT SO THAT MEMBERS OF OUR COMMUNITY WHO COULD MOST BENEFIT FROM THESE NEW TRANSIT INVESTMENTS ARE ABLE TO REMAIN IN THEIR COMMUNITIES AND TAKE FULL ADVANTAGE OF THAT NEW OPPORTUNITY AFFORDED TO THEM.
WE'RE LOOKING BEYOND JUST SIMPLE DISPLACEMENT PREVENTION, WHICH ITSELF IS ALREADY A DIFFICULT THING TO ACHIEVE, UM, BUT REALLY TRYING TO CREATE THOSE ADDITIONAL OPPORTUNITIES AND BRING NEW PEOPLE OR PEOPLE WHO MAY HAVE MOVED OUT OF THE NEIGHBORHOOD BACK SO THAT THEY CAN ENJOY OUR PROJECT CONNECT INVESTMENT.
UH, MULTIPLE PARTNERS AT THE CITY OF AUSTIN AND CAP METRO, OUR TRANSIT AUTHORITY, AS WELL AS AUSTIN TRANSIT PARTNERSHIP, THE LIGHT RAIL IMPLEMENTER, ARE WORKING ALL ALIGNED AND MAKING DECISIONS TOWARDS REACHING THIS ETOD GOAL.
UM, OUR SHARED FRAMEWORK IS DOCUMENTED IN THE POLICY PLAN THAT COUNCIL ACCEPTED IN MARCH OF 2023.
SO I'M HERE TODAY THR - A LITTLE BIT OVER THREE YEARS LATER TO KIND OF SHARE WHAT SIGNIFICANT PROGRESS WE'VE ALREADY MADE TOWARDS THESE GOALS.
IT'S KIND OF VERY SILLY TO PUT ALL OF THESE THINGS THAT WERE EACH THEIR OWN MASSIVE
[01:25:01]
EFFORT, UH, ON ONE SLIDE.UM, SINCE 2023, WE'VE ELIMINATED PARKING MINIMUMS AND WE'RE STILL THE LARGEST COMMUNITY TO DATE TO HAVE DONE SO CITYWIDE, UH, IN THE UNITED STATES.
WE'VE UPDATED OUR LAND DEVELOPMENT CODE IN MULTIPLE AREAS TO INCREASE HOUSING OPTIONS AND INCREASE DENSITY AND AFFORDABILITY NEAR OUR TRANSIT CORRIDORS.
WE'VE ALSO DONE PARKING REFORM DOWNTOWN, UM, CREATED MULTIPLE STATIONARY VISION PLANS NEAR OUR CAP METRO TRANSIT CENTERS.
AND ON THE PROGRAMMATIC SIDE, WE'VE ALSO WORKED TO IMPLEMENT OUR $300 MILLION OF ANTI-DISPLACEMENT FUNDING THAT WAS APPROVED BY THE VOTERS WITH PROJECT CONNECT THROUGH PROJECTS LIKE COMMUNITY INITIATED SOLUTIONS, AS WELL AS LAND ACQUISITIONS AND DEVELOPMENT ASSISTANCE THAT OUR HOUSING DEPARTMENT MANAGES.
OUR PUBLIC HEALTH AND ECONOMIC DEVELOPMENT STAFF HAVE BEEN HARD AT WORK TO INCREASE SMALL BUSINESS OPPORTUNITIES THROUGH THINGS LIKE THE PLACE-BASED ENHANCEMENT PROGRAM AND SUPPORT OUR WORKERS WITH TOOLS LIKE THE INFRASTRUCTURE ACADEMY AS WELL AS CHILDCARE GRANTS.
SO THAT'S THREE YEARS IN LESS THAN THREE MINUTES.
EVEN WITH ALL OF THIS SUCCESS, WE KNOW THERE'S MUCH MORE WORK TO DO TO REACH OUR ETOD GOALS, AND WE'RE CONTINUING WITH THE MOMENTUM.
A NUMBER OF IMPACTFUL PROJECTS ARE ALREADY UNDERWAY OR COMING IN THE FUTURE, UM, ACROSS MANY PARTNER AGENCIES AND DEPARTMENTS.
SO THE MEMO THAT WE PUBLISHED IN JULY GOES INTO MUCH GREATER DETAIL ON ALL OF THE THINGS UNDERWAY AND IN PROGRESS.
UM, SO I'M JUST GONNA FOCUS TODAY ON WHAT AUSTIN PLANNING IS LEADING OR COORDINATING ON.
UM, BUT AGAIN, THIS IS ONLY A SNAPSHOT.
AT OUR BIGGEST SCALE FROM A PLANNING PERSPECTIVE, WE HAVE OUR COMPREHENSIVE PLAN, IMAGINE AUSTIN.
IT'S CURRENTLY UNDERGOING AN UPDATE.
UH, ONE OF THE FOCUSES THERE IS TO UNDERSTAND WHAT OUR FUTURE GROWTH SHOULD LOOK LIKE AROUND TRANSIT AND TO INTEGRATE THE STATIONARY CONTENT, CONCEPT INTO A NEW PLACE TYPES MAP.
I WANTED TO HIGHLIGHT THAT WE HAVE A SERIES OF OPEN HOUSES COMING UP AT THE END OF THIS MONTH, UH, FOR IN-PERSON AND A VIRTUAL ONE WHERE OUR COMMUNITY CAN LEARN MORE ABOUT THESE KIND OF FUTURE LAND USE AND PLACE TYPE OPTIONS THAT WE'RE THINKING ABOUT.
UH, RIGHT NOW WE'RE CONSIDERING COUNCIL ADOPTION IN EARLY 2028, AND WE'VE KICKED OFF THE COMMUNITY WORKING GROUP AS WELL AS TECHNICAL ADVISORY GROUP.
WE ALSO, UH, JUST EARLIER TODAY PUBLISHED A MEMO ON THE TRANSFER OF DEVELOPMENT RIGHTS PROGRAM.
THIS IS A STUDY THAT OUR HISTORIC PRESERVATION OFFICE HAS BEEN LEADING.
UH, TRANSFER OF DEVELOPMENT RIGHTS OR TDR ARE A MARKET-BASED TOOL WHERE YOU BASICALLY CAN SELL THE AIR RIGHTS TO A PROPERTY NEXT DOOR, SO KIND OF THE OPPOSITE OF SOME OF THE E- EVTOLS STUFF WE WERE TALKING ABOUT EARLIER.
THIS WOULD REMAIN FOR HISTORIC PROPERTIES TO KIND OF KEEP THEIR SCALE, UM, WHILE STILL OFFERING AN INCENTIVE FOR THAT PROPERTY OWNER TO WANT TO PRESERVE THE BUILDING BECAUSE THEY WOULD HAVE NEW ACCESS TO REHABILITATION FUNDING AS WELL AS POTENTIAL TAX ABATEMENTS AND OTHER TOOLS.
IT'S PART OF A COMPREHENSIVE HISTORIC INCENTIVE PACKAGE UPDATE THAT WE'RE WORKING ON, AND WE'LL BE DEVELOPING THAT IN 2027.
EARLIER THIS YEAR, OUR TEAMS PUBLISHED A MIXED USE AND MISSING MIDDLE ZONING STUDY REPORT, AND SHORTLY AFTER, COUNCIL INITIATED CODE AMENDMENTS TO CREATE THESE NEW TRANSIT SUPPORTIVE BASE ZONES.
UM, THEY COMPLIMENT OTHER RECENT REGULATORY REFORMS SUCH AS HOME AND SITE PLAN LIGHT, AS WELL AS SINGLE STAIR REFORM.
AND, UM, THESE NEW ZONES WOULD ALLOW FOR MORE OPPORTUNITIES FOR FOLKS TO LIVE IN MORE TYPES OF HOUSING NEAR TRANSIT.
SO RIGHT NOW, WE'RE ANTICIPATING THOSE PRE - FIRST SET OF PROPOSED MIXED USE ZONES WOULD BE FOR COUNCIL CONSIDERATION IN EARLY 2027.
UM, POTENTIALLY MOST OF RELEVANT RIGHT NOW TO THE MOBILITY COMMITTEE IS SEVERAL PARKING STUDIES THAT ARE UNDERWAY.
COUNCIL, UH, ASKED STAFF TO LOOK AT TWO DIFFERENT PARKING TOPICS TO CONSIDER BACK IN MARCH, AND SO AUSTIN PLANNING IS LEADING ONE OF THOSE STUDIES WHERE WE'RE LOOKING AT SOFT PARKING MAXIMUMS, BASICALLY, UM, AN AMOUNT OF LIMITED OFF-STREET PARKING.
RIGHT NOW FOLKS CAN BUILD AS MUCH AS FITS ON THEIR SITE AND MEETS THEIR IMPERVIOUS COVER REQUIREMENTS, ET CETERA.
SO THIS WOULD BE A POTENTIAL LOOK AT SOFT CAPS OUTSIDE OF DOWNTOWN.
THAT'S THE ONLY PLACE THAT THEY CURRENTLY EXIST.
UM, THERE WOULD STILL BE EXCEPTIONS FOR PROJECTS TO EXCEED THOSE PARKING MAXIMUMS WITH SPECIFIC CRITERIA.
[01:30:01]
CALL THEM A HARD CAP.WE'RE ALSO WORKING REALLY CLOSELY WITH STAFF IN AUSTIN TRANSPORTATION AND PUBLIC WORKS WHO ARE STUDYING AND LEADING ON PARKING UNBUNDLING CONSIDERATION.
THEY'RE WORKING WITH THE LOCAL URBAN LAND INSTITUTE TO HOST A TECHNICAL ADVISORY PANEL HERE COMING UP AT THE END OF THIS MONTH AS WELL.
AND UNBUNDLING IS A PRACTICE OF REQUIRING THAT LEASED, UM, LEASES ARE SEPARATED FROM THE COST OF PARKING SO THAT TENANTS HAVE THE CHOICE OF WHETHER THEY WOULD LIKE TO PURCHASE PARKING OR NOT.
UH, WE'RE EXPECTING THOSE TO BE COMPLETED IN DECEMBER OF THIS YEAR AT THIS POINT.
THEY WOULD JUST BE RECOMMENDATIONS AND WE WOULD BE DOING ADDITIONAL OUTREACH, UM, WITH THE COMMUNITY IF WE DECIDED TO MOVE FORWARD WITH EITHER, EITHER SOFT PARKING CAPS OR UNBUNDLING IN LARGER AREAS.
WE'RE ALSO WORKING ON STATION AREA AND DISTRICT PLANNING.
OUR NORTHEAST DISTRICT PLAN HAS, UM, JUST KIND OF FINISHED SOLICITING MEMBERS FOR THE COMMUNITY ADVISORY COMMITTEE.
AND THOSE APPLICATIONS ARE GOING TO BE CONSIDERED BY THE WORKING GROUP.
THIS IS IN PARTNERSHIP WITH TRAVIS COUNTY AND COVERS JURISDICTION FOR BOTH ENTITIES.
UH, THERE ARE MULTIPLE GREEN LINE STATIONS AS WELL AS RAPID BUS STATIONS, UM, INCLUDING THE EXPO LINE THAT IS, UH, ALREADY A PROJECT CONNECT PROJECT THAT HAS BEEN IMPLEMENTED BY CAP METRO.
AND THIS COMMUNITY ADVISORY COMMITTEE WILL KICK OFF BY THE END OF THE YEAR TO REALLY SHAPE THE VISION FOR THE NORTHEAST DISTRICT.
WE'RE ALSO WORKING ON THE EAST RIVERSIDE CORRIDOR PLANNING INITIATIVE ALONG EAST RIVERSIDE CORRIDOR.
THIS AREA HAS BOTH A VISION PLAN AND A REGULATING PLAN, BUT THOSE WERE CREATED PRIOR TO OUR CURRENT PHASE ONE LIGHT RAIL PROJECT GOING THROUGH ITS DESIGN PROCESS.
UM, WE'VE ALREADY HOSTED TWO SUCCESSFUL ROUNDS OF COMMUNITY ENGAGEMENT.
UH, THE LAST ONE AT THE END OF AUGUST, WE'VE BEEN PARTNERING ON THAT AS WELL WITH, UH, AUSTIN FINANCIAL SERVICES ON THE GROVE RIVERSIDE SITE REDEVELOPMENT, THE FORMER TOKYO ELECTRON SITE THAT THE CITY PURCHASED.
UM, WE WILL HAVE ANOTHER ROUND OF ENGAGEMENT ON EAST RIVERSIDE, UH, LATER THIS FALL, AND WE'RE ANTICIPATING COUNCIL ADOPTION CONSIDERATION IN SPRING OF NEXT YEAR.
AND THEN LAST ONE,
WE'RE WORKING ON THE CENTRAL CITY DISTRICT PLAN, WHICH IS A DISTRICT PLAN FOR THE DOWNTOWN AREA, THE SOUTH CENTRAL WATERFRONT AREA, AND THE UNIVERSITY AREA NEAR THE UNIVERSITY OF TEXAS.
THIS WILL BE SETTING THE VISION FOR THE SHORT AND MEDIUM TERM, KIND OF THE NEXT 10 YEARS OF GROWTH IN THIS URBAN CORE.
UM, THE TEAM JUST HOSTED A SUCCESSFUL SERIES OF OPEN HOUSES IN MID-SEPTEMBER FOR THE CENTRAL CITY PLANNING EFFORT.
UM, AND WE'RE CURRENTLY UPDATING TWO OF THE MAJOR IMPLEMENTATION TOOLS IN OUR URBAN CORE.
ONE OF THEM IS THE DOWNTOWN DENSITY BONUS PROGRAM, WHICH ALLOWS ADDITIONAL HEIGHT DOWNTOWN IN EXCHANGE FOR AFFORDABLE HOUSING AND OTHER URBAN DESIGN AND COMMUNITY BENEFITS.
AND THEN THE LAST ONE IS THE GREAT STREETS PLAN UPDATE AND STANDARDS WORK THAT OUR URBAN DESIGN TEAM IS WORKING ON, WHICH WILL ULTIMATELY FEED INTO A TRANSPORTATION CRITERIA MANUAL UPDATE.
AND ALL OF THESE PROJECTS ARE ONGOING AS WELL.
AS YOU SAW, THAT'S A LOT OF STUFF THAT'S GOING ON IN THE NEXT ONE AND A HALF YEARS OR SO.
SO THE QUESTION IS MAYBE WHAT COMES NEXT.
UM, STAFF WOULD BE LAUNCHING NEW STATION AREA OR DISTRICT PLANS IN ADDITIONAL TRANSIT CORRIDORS.
WE HAVE A PRIORITIZATION FRAMEWORK IN THE POLICY PLAN THAT HELPS US, YOU KNOW, LOOK AT WHICH AREAS MAY BE NEXT.
WE HAVE ALREADY BEEN DIRECTED BY COUNCIL TO UPDATE THE EXISTING THREE TOD PLANS THAT ARE ALONG OUR EXISTING RED LINE.
AND WE WILL ALSO CONTINUE WORKING ON COORDINATING AND, UM, PROVIDING UPDATES ON THE VARIOUS POLICY TOOLS IN THE TOOLKIT.
SO LIKE I SAID, I APPRECIATE IT.
MANY FOLKS IN THIS ROOM HAVE CONTRIBUTED TO THIS WORK.
AND, UM, WITH THAT, I'M HAPPY TO ANSWER ANY QUESTIONS.
DO WE HAVE QUESTIONS FROM THE COMMITTEE MEMBERS? LET'S GO WITH CRYSTAL LANE.
YOU WANNA GO LAST? I'LL, I'LL MAKE A QUICK...
MAYOR PRO TEM, YOU KICK IT OFF.
LOVE TO SEE THE MENTION OF, UH, SINGLE STAIR IN THERE.
THAT ALWAYS SO WARMS MY HEART.
I'M SO EXCITED TO SEE THE FIRST EVER, UH, SINGLE STAIR BUILDING IN AUSTIN, BUT WE'LL, WE'LL GET THERE, UH, HOPEFULLY SOONER THAN LATER.
AND I ALSO JUST WANTED TO GIVE A SHOUT OUT.
WE'VE GOT A LOT OF TRANSPORTATION, UH, ROYALTY IN THE, IN THE, UH,
RUDY MATEO IS HERE, THE, THE CHAIRMAN OF THE, UH, CAPITAL AREA, UH, MPO, UH, ALONG WITH, UH, TUCKER FERGUSON AND HEATHER FROM, UH, TXDOT.
[01:35:01]
SO, UH, EVERYBODY COMES AND WATCHES THE AUSTIN, UH, TRANSPORTATION COMMITTEE APPARENTLY.AND THEY'RE ALL DYING TO GET ON THE MICROPHONE, I CAN TELL.
LET'S GO WITH COUNCIL MEMBER LANE.
UM, SO FIRST OF ALL, THANK YOU FOR THIS GREAT...
NO PRESSURE HAVING, UH, COUNCILMEMBER MATEER IN THE AUDIENCE AT ALL.
THANK YOU, FIRST OF ALL, FOR THIS GREAT OVERVIEW.
UM, I JUST HAVE A COUPLE QUESTIONS.
SO LAST YEAR, OUR OFFICE MET WITH CAP METRO TO DISCUSS IMPROVED COORDINATION WITH PRIVATE LANDOWNERS, BUILDERS, DEVELOPERS, AND SUCH, UM, THAT CAN SUPPORT TRANSIT FACILITIES SPECIFICALLY AT THESE RED LINE STATIONS THAT ARE EXISTING.
UM, I'M JUST WONDERING TO WHAT EXTENT THE CITY HAS ALREADY BEEN INVOLVED WITH THIS EFFORT OR IS BECOMING INVOLVED NOW? YEAH.
OUR PARTNERS AT CAP METRO HAVE BEEN WORKING ON A PROJECT THAT THEY CALL THEIR TRANSIT DEVELOPMENT GUIDELINES.
UM, UP TO THIS POINT, THEY'VE REALLY WORKED ON KIND OF A ONE-OFF BASIS WITH VARIOUS DEVELOPERS, UM, WHO ARE INTERESTED IN INTEGRATING TRANSIT INFRASTRUCTURE LIKE BIKE SHARE OR ADDITIONAL, UM, KIND OF BUS BAYS AND THINGS INTO THEIR PROJECT.
UM, BUT THEY DIDN'T HAVE A STANDARD SET OF KNOWING WHAT THEY NEEDED TO ASK FOR NECESSARILY.
SO THEY'VE WORKED A LOT INTERNALLY TO FIGURE OUT WHAT KIND OF DIMENSIONS THAT THEY'RE LOOKING FOR, WHAT THE COSTS OF THAT KIND OF TEND TO BE.
AND THEN ON THE CITY SIDE, WE'VE BEEN HELPING THEM UNDERSTAND WHERE THAT'S POSSIBLE TO FIT INTO OUR DEVELOPMENT REVIEW PROCESS OR OUR BONUS PROGRAMS, UM, TO TRY TO SEE WHERE WE CAN FIND ALIGNMENT THERE.
UM, I ALSO WANNA THANK YOU, UM, AS IT RELATES TO THE ETOD COMMUNITY ENGAGEMENT.
SO HAPPY TO SEE DEER PARK MIDDLE SCHOOL, UH, IN WILLIAMSON COUNTY WHERE IT CAN BE TOUGH TO ACCESS THAT TRANSIT.
SO REALLY APPRECIATE THE ABILITY OF THOSE COMMUNITY MEMBERS TO ENGAGE AND AS YOU WORK THROUGH SOME OF THOSE ETOD CONSIDERATIONS.
UM, ONE THING THAT HAS STRUCK ME IN THE ETOD, UM, WORK, AND YOU'VE PROBABLY HEARD ME SAY IT BEFORE PERHAPS, BUT, YOU KNOW, THERE'S...
WE, WE PRIORITIZE AREAS THAT HAVE A HIGH DISPLACEMENT RISK, BUT INADVERTENTLY THAT DEPRIORITIZES TRANSIT OPPORTUNITIES THAT HAVE A LOT OF VACANT LAND BECAUSE THERE'S ZERO DISPLACEMENT RISK.
AND SO I WONDER IF YOU'RE LOOKING INTO HOW, WHAT YOUR THOUGHTS ARE ON THAT AND THE EXTENT TO WHICH THAT TYPE OF CONSIDERATION MIGHT BE CONSIDERED IN THIS TYPOLOGY UPDATE THAT YOU'RE WORKING ON.
I'D HAVE TO GO BACK AND LOOK AT THE, THE EXACT PRIORITIZATION METHOD, BUT ONE OF THE THINGS WE DID CONSIDER IS THE AMOUNT OF VACANT OR UNDERUTILIZED LAND, THE LIKELIHOOD THAT LAND WOULD BE REDEVELOPING AND KIND OF WHAT THAT ACREAGE WAS IN VARIOUS STATION AREAS.
WE ALSO LOOKED AT THE AMOUNT OF PUBLICLY OWNED LAND, EVEN IF IT WASN'T THE CITY OF AUSTIN'S LAND, BUT ONE OF OUR SCHOOL DISTRICTS OR, UH, COUNTY, THE STATE, JUST TRYING TO UNDERSTAND BECAUSE A LOT OF THAT CAN BE REPOSITIONED INTO TRANSIT SUPPORTIVE MIXED USE NEIGHBORHOODS.
UM, SO THAT'S DEFINITELY SOMETHING THAT WE LOOKED AT IN THE INITIAL TYPOLOGIES AND PRIORITIZATION, BUT OUR INTENT IS TO UPDATE THAT ROUGHLY EVERY FIVE YEARS OR SO BECAUSE OBVIOUSLY, UM, LAND IS REDEVELOPING OR NOT ALL AROUND US.
THINGS ARE AGING AND LOOKING TO, TO REDEVELOP AS WELL.
IT'S HARD TO KEEP UP WITH THE POPULATION SHIFTS.
UM, SO I, I ALSO THINK THIS IS A GREAT MOMENT FOR THAT, JUSTIN, JUST FOR THE OPPORTUNITY TO WORK WITH MORE STAKEHOLDERS AND THROUGH THE WORK THAT OUR ECONOMIC DEVELOPMENT TEAM HAS BEEN DOING AS WELL.
UM, IN ADDITION, WANNA ACKNOWLEDGE ACM ROGERS', UH, COMMENTS ON THE REFORMS TO THE WAY THAT PROJECTS ARE BEING DELIVERED.
ALL OF THAT TOGETHER IS A GREAT OPPORTUNITY, AND SO I LOVE TO SEE THAT, UH, ALL HAPPENING ALONG WITH THIS ETOD UPDATE.
I FEEL LIKE I MIGHT HAVE ONE MORE QUE...
OH, YES, THIS IS A GOOD ONE AND THEN I'LL STOP.
I AM A LITTLE BIT NERDING OUT OVER HERE BY MYSELF.
YOU GUYS MIGHT NEED TO BRING ME CLOSER TO YOU NEXT TIME.
OKAY, SO, UM, I'M WONDERING...
THIS IS THE FORMER APPRAISER IN ME.
DO YOU ANTICIPATE ETOD STATION AREAS MAY ALLOW SOME OF THE HIGHEST INTENSITY ZONING SO THAT NO FUTURE UPZONING NEAR TRANSIT, YOU KNOW, WILL BE NECESSARY OR MAY END UP BEING INCONSISTENT WITH THE COMPREHENSIVE PLAN? LIKE, HOW DO THOSE PIECES OF THE PUZZLE FIT TOGETHER? YEAH.
SO OUR COMPREHENSIVE PLAN DOESN'T DIRECTLY IMPACT SPECIFIC ZONING DECISIONS, BUT IT PROVIDES KIND OF THE FRAMEWORK FOR WHICH ZONES MIGHT BE APPROPRIATE IN DIFFERENT AREAS.
AND THAT'S REALLY WHAT THE PLACE TYPES MAP WILL START TO FORM UP IN THE NEXT YEAR OR SO AS IMAGINE AUSTIN CONTINUES UPDATING.
UM, AS FAR AS FROM A STATIONARY KIND OF SPECIFIC PERSPECTIVE, WHAT WE'VE BEEN EXPECTING IS AFTER A VISION PLAN MIGHT BE ADOPTED, LIKE THE NORTH LAMAR TRANSIT CENTER OR SOUTH CONGRESS TRANSIT CENTER PLANS, AN ADDITIONAL NEXT STEP
[01:40:01]
THAT THE CITY COULD UNDERTAKE IS TO INITIATE REZONING INTO SUPPORTIVE BASE ZONES, YOU KNOW, UM, SO THAT ONE THING THAT WE HAVE BEEN HOLDING FOR IS THOSE NEW MIXED USE AND MISSING MIDDLE BASED ZONES.HOWEVER, WE WOULD REALLY LIKE THOSE TO BE OPTIONS IN OUR TOOLBOX BEFORE WE GO OUT AND TRY TO TALK TO THE COMMUNITY ABOUT WHAT REZONING MAY BE APPROPRIATE NEAR THEIR STATION AREA.
BUT WE WOULDN'T WANT THE REZONING TO GET AHEAD OF SOME OF THE FOCUSED GEOGRAPHIC WORK WITH THE COMMUNITY.
I'M JUST GONNA THROW ONE MORE LITTLE TIDBIT OUT THERE, WHICH IS, YOU KNOW, WHEN THE RED LINE STOPS ARE INITIALLY OPENED, A LOT OF PUDS CAME INTO EXISTENCE AROUND THEM AND, YOU KNOW, THERE'S AN OPPORTUNITY TO WORK IN COLLABORATION IN A, IN A NEW WAY, UH, TO RESTRUCTURE SOME OF THE PUDS AND THE PRELIMINARY ZONING THAT WAS PUT INTO PLACE, UM, SO THAT IT REFLECTS ALL THESE LESSONS LEARNED.
AND I, I GUESS I JUST LOOK FORWARD TO WORKING ON THAT, I GUESS, WITH YOU.
I KNOW YOUR PLATE'S PRETTY FULL, BUT, UM, THANK YOU.
UM, I'M THINKING ABOUT THE TIMELINES THAT YOU'D PRESENTED, PARTICULARLY AROUND THE MIXED USE DISTRICTS AND HOPING WE CAN GET THOSE BACK EARLIER.
UM, SO MAYBE WE CAN JUST CHAT OFFLINE, BECAUSE I KNOW THAT AS WE'VE TALKED ABOUT SOME OF THE LAND USE PLANNING IN, IN THE OTHER COMMITTEE, UM, LOOKING AT SOME SORT OF GANTT CHART OF, LIKE, WHAT IS YOUR TEAM TASKED WITH AND WHAT IS A REALISTIC EXPECTATION FOR GETTING THESE DONE? BUT I'VE, I'VE HAD FOLKS THAT, YOU KNOW, WORK IN LAND USE ON THE OUTSIDE SAYING, HOW CAN THEY BE HELPFUL IN GETTING THIS PARTICULAR INITIATIVE WRAPPED UP BEFORE THE END OF THE YEAR? SO I'D LOVE TO...
IF YOU HAVE THOUGHTS NOW, YOU CAN SHARE THEM OR WE CAN CONNECT ANOTHER TIME.
OH, I BELIEVE THE HOUSING AND PLANNING COMMITTEE MEETING IS COMING UP MAYBE NEXT WEEK EVEN, AND THE GANTT CHART, UH, HAS BEEN UPDATED.
SO ALL, ALL OF THOSE THINGS WE'RE WORKING ON, BUT WE'RE ALSO WORKING ON THINGS LIKE DATA CENTERS AND, YOU KNOW, THERE'S OTHER THINGS ON, UM, KIND OF AUSTIN PLANNING'S PLATE.
SO WE'RE WORKING WITH OUR COMMISSIONERS AND KIND OF COUNCIL SCHEDULING, LOOKING AT NEXT YEAR TO S - AND THE REST OF THIS YEAR TO SEE - PERFECT.
SEE HOW THAT TIMING COULD WORK OUT.
AND THEN I WAS JUST REMINDED ABOUT WE WERE TRYING TO BUILD SOME SORT OF IMPROVED DEVELOPMENT AROUND RYAN DRIVE, WHICH IS ON THE RED LINE.
AND SO JUST TRYING TO UNDERSTAND, IS THAT ONE STILL IN THE MIX OR DO WE NEED TO START FROM SQUARE ONE? 'CAUSE I'M FAILING ON THE DETAILS OF WHY THAT ONE DIDN'T WORK OUT, BUT I THINK IT JUST, YOU KNOW, EITHER DIDN'T GET THROUGH THE BID PHASE OR DIDN'T GET THROUGH A SIGNED, YOU KNOW, PLAN MOVING FORWARD WITH A PARTNER OR SOMETHING LIKE THAT.
UH, AUSTIN HOUSING FINANCE CORPORATION HAS A DEVELOPMENT PARTNER ON BOARD.
THEY'VE BEEN GOING THROUGH THE SITE PLAN PROCESS, I THINK, CURRENTLY.
SO THERE IS A DEVELOPMENT ON THE WAY.
UH, I'VE SEEN SOME PRELIMINARY DISCUSSIONS AND THEY'RE WORKING WITH THE PUBLIC PROJECTS TEAM AND DEVELOPMENT SERVICES ON THAT.
MAYOR PRO TEM BAILEY, DO YOU HAVE ONE MORE THOUGHT? JUST, UH, I, I APPRECIATE THE COMMENT ABOUT THE NEW MU, UH, AND, AND ROLLING THAT INTO THE MIX BEFORE WE GO TO THE PUBLIC AND ASKING...
I, I, I THINK THAT IT'S AN INTERESTING NEW ZONING.
I, I THINK THERE'S A LOT OF OPPORTUNITY THERE ANYWAY.
I JUST, I, I THINK THAT'S A GREAT SUGGESTION.
IF THERE'S NO OTHER QUESTIONS ON THIS ITEM, WE WILL MOVE TO
[6. Report by Austin Transportation and Public Works related to ongoing mobility programs and projects in the Central Texas region, including construction and service updates of departments that oversee critical infrastructure projects. [Richard Mendoza, Director - Austin Transportation Public Works]]
ITEM NUMBER SIX, WHICH I COLLOQUIAL REFER TO AS THE DIRECTOR'S REPORT.ALL RIGHT, SO THE OCTOBER 2026 CITY OF AUSTIN MOBILITY DIRECTORS REPORT, UM, INCLUDES, UH, THE HIGHLIGHTS.
UM, FIRST IS TO ANNOUNCE THE LAUNCH OF CTX GO.
AND, UM, THERE'S SOME ACTIVITY GOING ON IN THE FOYER HERE IN ABOUT, OH, I DON'T KNOW, 15 MINUTES, WE'RE GONNA FORMALLY ANNOUNCE THE MUCH ANTICIPATED LAUNCH OF THE CTX GO APP.
AND JUST REAL QUICKLY, THE CTX GO APP IS A COLLABORATIVE EFFORT FROM MULTIPLE AGENCIES ACROSS OUR AUSTIN REGION TO SHARE CONSTRUCTION PROJECT INFORMATION AND SO THAT WE CAN COLLECT THAT IN ONE CONVENIENT PLACE FOR OUR TRAVELING PUBLIC TO ACCESS AND THEN APPROPRIATELY PLAN THEIR COMMUTE, UH, FOR THAT DAY OR IN THE NEXT WEEK OR SO ON.
AND EVEN PLAN ALTERNATIVE MODES, MOST IMPORTANTLY, OF TRAVEL TO, UH, MITIGATE, UH, THE IMPACTS OF WHAT WE ALL KNOW IS AN UPCOMING CONSTRUCTION ARMAGEDDON FOR OUR REGION.
WE'VE GOT THE I-35 CONSTRUCTION PROJECT, WE'VE GOT, UH, PROJECT CONNECT, ATP RAIL LINE, GOT THE CONVENTION CENTER EXPANSION, CTRMA HAS CONSTRUCTION PROJECTS IN THE PLANNING PHASES.
THIS HAS BEEN A LONG-TERM, UH, EFFORT FOR US TO COLLABORATE TOGETHER MULTI-AGENCY.
ALSO INCLUDED IN THE REPORT, AS
[01:45:01]
ACM ROGERS ALLUDED TO, YOU'RE SEEING A LOT OF ACTIVITY AND, UH, PRIOR BOND MOBILITY FUNDED PROJECTS COME TO COMPLETION.WE'RE EXCITED TO ANNOUNCE THREE RIBBON CUTTINGS ON ACTIVE MOBILITY PROJECTS LAST MONTH, THE FIRST BEING BURRELL DRIVE, ALSO MCNEIL DRIVE, AND THEN F- FINALLY THE SHOAL CREEK TRAIL.
AND, UH, THERE'S GONNA BE MORE TO COME BETWEEN HERE AND NEXT YEAR.
UH, ADDITIONALLY, UH, WE'RE ANNOUNCING APPLICATIONS FOR THE LIVING STREETS PROGRAM.
THIS IS THE PROGRAM THAT THIS COMMITTEE WAS VERY SUPPORTIVE OF, AND WE'RE ABLE TO IMPLEMENT ACROSS OUR COMMUNITY TO MAKE SOME OF OUR LOCAL RESIDENTIAL LOW VOLUME STREETS, UH, MORE ACCESSIBLE SAFELY FOR THE COMMUNITY TO CONNECT AND ENJOY FOR PURPOSES OTHER THAN JUST DRIVING, DRIVING ON.
AND THEN IN CLOSING, UH, OUR AUSTIN AIRPORT CONTINUES TO BE BUSTLING.
WE EXPERIENCED TWO RECORD-BREAKING MONTHS IN TERMS OF BOARDINGS AND UNBOARDINGS IN THE MONTHS OF THIS PAST JUNE AND JULY, OVER 2.1 MILLION IN EACH ONE OF THOSE MONTHS.
THEY'RE ABLE TO DO THIS WHILE STILL MAINTAINING HIGH LEVELS OF CUSTOMER SATISFACTION RATINGS AND, UH, ALSO MITIGATING THE ONGOING EXPANSION CONSTRUCTION FOR, UH, AUSTIN AIRPORT.
ADDITIONALLY, THEY'RE PLANNING IN EARLY NOVEMBER TWO OPEN HOUSE EVENTS FOR INFORMATION ON HOW NEW CONCESSIONAIRES, UH, CAN OPERATE OUT OF OUR AIRPORT, AS WELL AS ANNOUNCING A NEW AIRLINE LOUNGE FOR SOUTHWEST AIRLINES.
SO OUR AIRPORT'S DEFINITELY CLIMBING UP THERE AND, AND COMPETING WITH THE BIG BOYS IN THE INDUSTRY.
ANY COMMENTS OR QUESTIONS ON THIS ONE? ALL RIGHT.
MAYOR PRO TEM? JU - I SAW THE BURL DRIVE, UH, BIKE LANE.
I, I GOTTA, I GOTTA, UH, GIVE Y'ALL A, A PAT ON THE BACK.
UH, THAT PROJECT CAME OUT REALLY WELL.
UH, BURL DRIVE RUNS RIGHT BY, UH, WOOTEN PARK, UH, AND WOOTEN ELEMENTARY.
WOOTEN ELEMENTARY HAS DOUBLED ITS, UH, STUDENT CAPACITY.
IT'S NOW A FULLY DUAL LANGUAGE AND RILEY ELEMENTARY, I THINK, MOVED OVER TO A WOOTEN.
UH, SO IT'S JUST A, A GREAT TIME.
UH, I THINK THE, UH, UH, THAT PHOTO WAS GREAT.
AND I MEAN, WE HAD, WHAT, YOU KNOW, 100 PEOPLE OUT THERE AT THE - IT WAS WELL ATTENDED, YEAH.
UH, WE DID A LITTLE BIKE RIDE AROUND, UH, UH, WOOTEN NEIGHBORHOOD.
IT WAS JUST A WONDERFUL EVENT.
I JUST WANTED TO THANK, UH, YOURSELF AND ALL OF YOUR STAFF THAT DID A, A, A GREAT JOB ON THAT PROJECT.
ANY FURTHER QUESTIONS? THANK YOU FOR THE MCNEIL DRIVE.
AND I KNOW THAT WAS UNDERWAY BEFORE I CAME AROUND, BUT VERY EXCITED ABOUT IT.
I THINK THAT'S WHY WE LOVE HAVING THE REPORT, IS WE KNOW THERE'S THINGS THAT DON'T GET AIRTIME AT THE COMMITTEE THAT STAFF IS WORKING ON SO HARD EVERY SINGLE DAY.
SO WE REALLY APPRECIATE ALL THE ADVANCEMENTS THAT ARE TAKING PLACE IN OUR COMMUNITY.
[7. Fiscal Year 2025-2026 3rd Quarter Financial Report [Richard Mendoza, Director – Austin Transportation and Public Works]]
TO...WE HAVE AN ITEM SEVEN, BRIEFING BY MEMO FOR THE THIRD QUARTER FINANCIAL REPORT.
ARE THERE ANY QUESTIONS OR COMMENTS ON THIS ONE? I HAVE A FEW, BUT I'LL, I'LL ASK THEM OFFLINE SO WE CAN GET A LITTLE MORE DETAIL ABOUT THEM.
AND THEN THERE'S A LIST OF PREVIOUSLY DISTRIBUTED MEMOS TO MAYOR AND COUNCIL, IF ANYONE HAD ANY OTHER QUESTIONS ON THOSE.
[8. Identify items to be discussed at future meetings.]
IS IDENTIFY ITEMS TO BE DISCUSSED AT FUTURE MEETINGS.WE ALREADY HAVE TWO OR THREE ITEMS FOR NOVEMBER AND ONE OR TWO FOR DECEMBER, AND THEN A LIST OF ABOUT 15 MORE.
SO IF YOU HAVE OTHERS THAT YOU WANNA PUT IN THE HOPPER, FEEL FREE TO REACH OUT TO ME OR MY TEAM AND WE'LL TRY TO GET THOSE SCHEDULED OVER THE NEXT COUPLE OF WEEKS.
ON THAT NOTE, WE WILL ADJOURN AT 2:52 PM.